Planning Permission Ireland
Awaiting decisionCommercialDecision due in ~2 weeks (9 August 2026)

Regeneron Ireland DAC, Raheen Business Park, Ballycummin Co. Limerick

Refurbishment of outbuildings and construction of a new 1,460 sqm Event Centre at Regeneron in Raheen.

2561246 · Limerick County Council · Lodged 28 November 2025

Reference
2561246
Authority
Limerick County Council
Register status
In progress
Type
PERMISSION
Received
28 November 2025

Summary

AI-generated

The development at the existing production facility includes constructing a new company Event Centre for conferences, training, and meetings. It also involves refurbishing and conserving an existing building adjacent to Roche Castle.

Commercialbiopharmaevent centrerefurbishment
Floor area
1,460 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Refurbishment and extension of existing outbuildings and construction of an event center building within the associated courtyard, located on the campus of the existing production facility. The development is for the purpose of providing a company event centre building of approximately 1,460.0 square meters floor area and maximum height of 7.7 meters to include a conference/event/training space, meetings rooms, vendor units, stores, plant rooms, and welfare areas. The proposed event centre will include ancillary open areas comprising; an entrance courtyard area; a landscaped forecourt area; and 2 no. Open plant yards. Proposed drainage works will include 2 no. Underground surface water soakaway attenuation tanks to direct rooftop and other surface water from the development to ground infiltration, and no surface water from the proposed building will discharge to the loughmore canal. Refurbishment and conservation works are also proposed to the existing single storey building of approximately 22.0 square meters floor area, identified as building 12, adjacent to roche castle. Other associated developments will comprise footpaths, service provisions, landscaping, and all associated site works. The proposed development is within the curtilage of roche castle, a protected structure (record of protect structures reg. No. 1671). This application relates to development on a landholding that comprises an activity which holds an industrial emissions licence (reg. No. P0991-02) issued by the environmental protection agency

Land-use zoning

What this land is zoned for

High Tech/Manufacturing CampusBP
To provide for office, research and development, high technology, regional distribution/ logistics, manufacturing and processing type employment in a high quality built and landscaped campus style environment.

National zoning type: Mixed/general commercial/industrial/enterprise uses

Objective set by the Limerick Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Key dates

Timeline

  1. Application received28 November 2025
  2. Further information requested30 January 2026
  3. Further information received13 July 2026
  4. Decision due9 August 2026

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.