Awaiting decisionEnergyDecision due in 12 days (4 August 2026)

Raheen Business Park, Raheen, Limerick

Installation of a 2.80 MWp ground-mounted solar farm at Raheen Business Park.

2660490 · Limerick County Council · Lodged 30 April 2026

Reference
2660490
Authority
Limerick County Council
Register status
In progress
Type
PERMISSION
Received
30 April 2026

Summary

AI-generated

The project consists of a ground-mounted solar photovoltaic plant with an approximate capacity of 2.80 MWp within a 3.48-hectare site. It includes approximately 5,432 solar modules, underground cabling, a transformer cabin, security fencing, and a temporary construction compound.

Energysolarrenewablebusiness park
Floor area
18,019 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The installation of a ground mounted solar photovoltaic plant with an approximate capacity of 2.80 mwp and a grid connection capacity of 2.33 mw ac within a 3.48 hectare site, including the installation and the cable route to the point of connection at raheen business park, raheen, limerick. The proposed development will include approximately 5,432 photo-voltaic modules, covering an approximate area of 18,018.70 square metres, installed on a fixed east west mounting structure with an approximate height of 0.8 metres at the lower edge and 3.1 metres at the highest point. The development will also comprise underground direct current and alternating current cabling, including a cable route located beneath the existing internal cycle path within raheen business park, string combiner boxes, inverters, a prefabricated low voltage transformer cabin located within the photovoltaic installation area, earthing and grid synchronisation equipment, perimeter security fencing with wildlife access points, cctv where required, drainage and all associated civil works. The development will also include a temporary construction compound and set down area, together with the installation of a mobile welfare unit during the construction phase. The grid connection will be made via the existing on site substation within raheen business park. This development is covered by the provisions of the renewable energy directive iii (directive (eu) 2023/2413) and it is important to note that the planning application may be subject to section 34d of the planning and development act 2000, as amended. When a notice issues in accordance with section 34d(b), the provisions of article 26a of the planning and development regulations 2001 to 2025 shall apply

Key dates

Timeline

  1. Application received30 April 2026
  2. Decision due4 August 2026

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.