Planning Permission Ireland
GrantedEnergyDecided 8 December 2022

Aughamore, And Lanesborough, Co Longford

Demolition of the Lough Ree Power Station to construct a battery energy storage system (BESS) and a Synchronous Condenser.

2275 · Longford County Council · Lodged 1 April 2022

Reference
2275
Authority
Longford County Council
Register status
Decided
Type
PERMISSION
Received
1 April 2022

Summary

AI-generated

This major project involves the demolition of the existing Lough Ree Power Station structures, totaling approximately 20,000 sq.m of floor area. Phase 2 will construct and operate electricity grid services, specifically a battery energy storage system (BESS) and a Synchronous Condenser.

Energydemolitionbattery storagegrid servicespower station
Floor area
20,000 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Development at the 13.1 ha site known as 'lough ree power (lrp) station' located in lanesborough (lanesboro), in the townlands of aghamore and lanesborough, eircode n37e180; in county longford. The development will consist of the demolition of the existing lrp station (as approved under longford county council reg. Ref 01/115 ' an board pleanala ref. Pl14.125540 and all subsequent permissions);and the development and operation of electricity grid services - namely a battery energy storage system (bess) and a synchronous condenser (sync con). The proposed development comprises two distinct phases of activity - the initial demolition and site reinstatement (phase 1); following by construction and operation of the new bess and sync con (phase 2). Phase 1 comprises the demolition of existing site structures (with a total footprint of c. 11.195sq. M. And a total gross floor area of c. 20,000 sq. M) including the former lrp station (boiler house, turbine house, bag filter house and associated 80 m high stack); the intermediate peat storage building and associated fuel management system; and ancillary buildings including, electrical building, tippler building and associated control room and office, the screening building, lorry uploading building, water treatment plant building, offices building, laboratory building, workshop and maintenance buildings, oil pumphouse, electrics rooms, railway/locomotive service building, cooling water pump house and sewage/foul water treatment facility. All buildings and structures (including storage tanks and vessels) will be demolished to ground level, with below ground voids filled. Existing hard standing surfac3es (e. G. Building ground floor concrete slabs, tarmacadam surfaces, concrete footpaths and road kerbs) will remain in site; and the site will be reinstated and secured with boundary gates and fences, etc. Associated with the demolition activity there will be on-site crushing of material using mobile machinery for the purposed of disposal and/or material re-use. Phase 2 comprises the proposed development of the bess, sync con; and all associated development (full description scanned/attached)

Land-use zoning

What this land is zoned for

Industrial/Alternative EnergyCD
To primarily provide for industrial/workshop, warehouse & commercial or business development including compatible uses such as offices & distribution & to allow for the expansion of existing energy infrastructure

National zoning type: Other commerce/industrial/enterprise uses

Objective set by the LONGFORD COUNTY DEVELOPMENT PLAN 2021-2027 (2021–2027). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Main St, Lanesborough, LongfordApr 2026€147,500467 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received1 April 2022
  2. Further information requested20 May 2022
  3. Further information received15 November 2022
  4. Decision due12 December 2022
  5. Decision issued8 December 2022
  6. Appeal submitted9 January 2023
  7. Appeal decided13 October 2023
  8. Permission expiry12 October 2033

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.