GrantedInfrastructureDecided 11 August 2023

Existing Lanesboro Air Insulted Switchgear Substation and site of the former Lanesborough Power Station, townlands of Aghamore and Lanesborough, Lanesborough County Longford

Construction of a new Gas Insulated Switchgear compound and redevelopment of an existing substation.

2360056 · Longford County Council · Lodged 19 June 2023

Reference
2360056
Authority
Longford County Council
Register status
Decided
Type
PERMISSION
Received
19 June 2023

Summary

AI-generated

The project involves constructing a new Gas Insulated Switchgear (GIS) compound with a 15-metre-high building, parking, and stormwater attenuation. It also includes decommissioning and modifying elements of the existing 110 kV AIS substation.

Infrastructuresubstationenergyinfrastructure
Storey
1
Floor area
1,624 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Construction of a gas insulated switchgear (gis) compound measuring approximately 92.8m by 90.5m. The proposed gis compound will be raised to a ground level of 1.2m higher than the existing ground level at the site, and will comprise: (i) gis building with an approximate gross floor space 1624.1m2 and height of 15m (in addition, 6 no. Lightning protection rods, approximately 3m in height, are located on the parapet of the gis building); (ii) an internal access track measuring approximately 245m in length and 5m in width, 15 no. Car parking spaces; underground stormwater attenuation tank; underground foul wastewater pumping station and all associated site development and landscaping works; and (iii) the substation compound will be bounded by a palisade fence 2.6m in height and further enclosed by a property fence measuring 1.4m in height
  • The proposed development will also consist of the redevelopment of the existing ais 110 kv substation, comprising the following: (i) decommissioning of the 110 kv ais busbar and 110 kv primary plant within the existing 110 kv ais substation; (ii)the modification of 8 no. Existing 110 kv underground circuits which will be re-routed into the new 110 kv gis substation; and, (iii) construction of 3no. Underground joint bays; 1 no. New gantry tower (approximate footprint of 30.2m2 and a height of 12.5m); 1 no. New line cable interface mast (approximate footprint of 123m2 and a height of 20.7m); removal of the existing 110 kv ohl tower and section of cable which extends to the proposed line cable interface mast and all associated and ancillary transmission infrastructure
  • Construction of a distribution system operator (dso) compound measuring approximately 30m2
  • Construction of a landowner access road (hardcore surfacing) of approximately 91m in length and 6m in width; and
  • All ancillary site development works to facilitate the proposed development including geotechnical and geo-environmental ground investigations, site preparation works, site clearance and levelling, site drainage and associated outfall headwall to facilitate discharge to the river shannon, temporary construction compounds and landscaping

Land-use zoning

What this land is zoned for

Industrial/Alternative EnergyCD
To primarily provide for industrial/workshop, warehouse & commercial or business development including compatible uses such as offices & distribution & to allow for the expansion of existing energy infrastructure

National zoning type: Other commerce/industrial/enterprise uses

Objective set by the LONGFORD COUNTY DEVELOPMENT PLAN 2021-2027 (2021–2027). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Main St, Lanesborough, LongfordApr 2026€147,500292 m
4 The Green, Lanesborough, LongfordMar 2026€162,000487 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received19 June 2023
  2. Decision due13 August 2023
  3. Decision issued11 August 2023
  4. Grant issued15 September 2023
  5. Permission expiry14 September 2028

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.