GrantedEnergyDecided 20 February 2024

Tawnaghmore Upper and Tawnaghmore Lower, Killala, Co. Mayo

A 50 megawatt biomass-fueled electricity generating station on a 19-hectare site.

2360134 · Mayo County Council · Lodged 28 April 2023

Reference
2360134
Authority
Mayo County Council
Register status
Decided
Type
PERMISSION
Received
28 April 2023

Summary

AI-generated

The proposal is for a nominal 50 megawatt electricity generating station combusting woody biomass chips and a small proportion of fuel oil. The development spans a 19-hectare site, with 7 hectares developed to include fuel storage, processing facilities, a boiler house, and associated infrastructure.

Energybiomasspower stationindustrial

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

A nominal 50 megawatt electricity generating station, combusting woody biomass chips (domestic and imported) as well as a small proportion of fuel oil for boiler start-up. The total site area is 19.0 ha of which approximately 7 ha will be developed. The elements of the station are: weighbridges (2 no. ), scale house, roundwood storage area, log deck, enclosed wood chipper, wood chip truck dump, wood chip receiving hopper, wood chip screen, wood chip hog, wood chip bins (2 no. ), wood chip storage building, wood chip reclaimer, wood chip conveyors with associated magnetic separators, fuel oil storage tank and associated pumps, fuel oil generator, boiler house, baghouse, ash silo, induced draft fan room, boiler stack, combustion air and flue gas fans, boiler additive material receiving hoppers (3 no. ), boiler additive conveyors with associated magnetic separators, boiler additive silos (3 no. ), boiler water treatment tanks and associated pumps, ammonia tank and associated pumps, turbine hall (existing), control room (existing), cooling tower and associated pumps, water treatment building, waste water storage tank, fire water storage tank and associated pumps, compressed air system, high voltage transfer lines (3 no. ), low voltage transfer lines (3 no. ), gsu transformer, switchyard, switchyard mcc room (existing), storage and maintenance building (existing), garage, car park, hgv parking, flagpoles (3 no. ), external lighting, cctv cameras, internal road system, signage, construction compound, landscaping, foul and storm water disposal systems, storm water attenuation, wheel washes, gatehouses (2 no. ), entrance gates, security fencing, and all associated site works and services. (see attached description of proposed development document for more details. )

Key dates

Timeline

  1. Application received28 April 2023
  2. Further information requested22 June 2023
  3. Further information received25 January 2024
  4. Decision due21 February 2024
  5. Decision issued20 February 2024
  6. Grant issued22 March 2024
  7. Permission expiry21 March 2029

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.