SSE Thermal Tawnaghmore Power Station, Tawnaghmore Upper, Killala Co. Mayo

The application will replace the previous consented (but unbuilt) bess facility granted under planning ref (25/60108). The development will consist of the following elements —…

2660480 · Mayo County Council · Lodged 19 June 2026

Reference
2660480
Authority
Mayo County Council
Register status
In progress
Type
PERMISSION
Received
19 June 2026

Official record

Development description

  • The application will replace the previous consented (but unbuilt) bess facility granted under planning ref (25/60108). The development will consist of the following elements
  • Bess facility including battery containers with integrated hvac (heating, ventilation, air conditioning) units, transformers, inverters, underground cabling, internal access roads, lighting, cctv and perimeter fencing
  • Associated electrical compound consisting of a low voltage operations independent power producer (ipp) compound including a single storey control and operations building, switchgear room, storage container, car parking, welfare/office facilities
  • High voltage electrical yard and eirgrid 110kv substation building
  • 264 meters long 110kv single circuit underground grid connection (ugc) within sse lands and 119 meters within the existing esb 110kv substation lands to facilitate the grid connection to the existing adjacent tawnaghmore substation
  • Proposed internal access tracks to bess facility, including 4 no. New gate entrances
  • Reinforced concrete and retaining walls
  • A temporary construction compound and associated temporary infrastructure to facilitate the development
  • Associated landscaping, drainage, decommissioning of existing septic tank and ancillary works. A 10-year permission is sought in respect of the development. Certain details of the proposed development are unconfirmed in the planning application, and an opinion on unconfirmed details accompanies the application. The tawnaghmore power station has an environmental protection agency (epa) issued industrial emissions (ie) licence (reg, no. P0566-02)

Key dates

Timeline

  1. Application received19 June 2026
  2. Decision due13 August 2026

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.