SSE Thermal Tawnaghmore Power Station, Tawnaghmore Upper, Killala Co. Mayo
The application will replace the previous consented (but unbuilt) bess facility granted under planning ref (25/60108). The development will consist of the following elements —…
2660480 · Mayo County Council · Lodged 19 June 2026
- Reference
- 2660480
- Authority
- Mayo County Council
- Register status
- In progress
- Type
- PERMISSION
- Received
- 19 June 2026
Official record
Development description
- The application will replace the previous consented (but unbuilt) bess facility granted under planning ref (25/60108). The development will consist of the following elements
- Bess facility including battery containers with integrated hvac (heating, ventilation, air conditioning) units, transformers, inverters, underground cabling, internal access roads, lighting, cctv and perimeter fencing
- Associated electrical compound consisting of a low voltage operations independent power producer (ipp) compound including a single storey control and operations building, switchgear room, storage container, car parking, welfare/office facilities
- High voltage electrical yard and eirgrid 110kv substation building
- 264 meters long 110kv single circuit underground grid connection (ugc) within sse lands and 119 meters within the existing esb 110kv substation lands to facilitate the grid connection to the existing adjacent tawnaghmore substation
- Proposed internal access tracks to bess facility, including 4 no. New gate entrances
- Reinforced concrete and retaining walls
- A temporary construction compound and associated temporary infrastructure to facilitate the development
- Associated landscaping, drainage, decommissioning of existing septic tank and ancillary works. A 10-year permission is sought in respect of the development. Certain details of the proposed development are unconfirmed in the planning application, and an opinion on unconfirmed details accompanies the application. The tawnaghmore power station has an environmental protection agency (epa) issued industrial emissions (ie) licence (reg, no. P0566-02)
Key dates
Timeline
- Application received19 June 2026
- Decision due13 August 2026
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- Granted90 m away
A BATTERY STORAGE FACILITY WITHIN A TOTAL SITE AREA OF UP TO 1.18ha, TO INCLUDE 55 NO. SELF CONTAINED BATTERY…
TAWNAGHMORE UPPER , KILLALA , CO. MAYO
18358MayoLodged 17 May 2018Energy
- Granted90 m away
The development will consist of the following elements — Battery Energy Storage System facility, consisting…
SSE Thermal Tawnaghmore Generation Station , Tawnaghmore Upper , Kilala Co. Mayo
2560108MayoLodged 28 Feb 2025Energy
- Granted110 m away
25 YEAR PERMISSION FOR AN ENERGY STORAGE FACILITY . THE DEVELOPMENT WILL COMPRISE OF A COMPOUND CONTAINING 4…
TAWNAGHMORE LOWER , KILLALA
2012MayoLodged 17 Jan 2020Energy
- Granted250 m away
The construction of a single data centre building located to the north of the site, with an overall gross…
Mullafarry and Tawnaghmore Upper , Killala , Co. Mayo
2460708MayoLodged 21 Nov 2024Industrial
- Awaiting decision310 m away
The Proposed Development will consist of a Hydrogen Plant and an Energy Centre. The Hydrogen Plant, to the…
The townlands of Tawnaghmore Lower and Meelick , Killala , Ballina
2360117MayoLodged 21 Apr 2023Energy
- Granted310 m away
The Proposed Development will consist of a Hydrogen Plant and an Energy Centre. The Hydrogen Plant, to the…
Old Ashai Plant , Killala Business Park , Killala
2360266MayoLodged 10 Jul 2023Energy
- Granted390 m away
A nominal 50 megawatt electricity generating station, combusting woody biomass chips (domestic and imported)…
Tawnaghmore Upper and Tawnaghmore Lower , Killala , Co. Mayo
2360134MayoLodged 28 Apr 2023Energy
- Granted470 m away
We, Schutz (Ireland) Ltd., intend to apply for permission for development at this site at Killala Business…
Killala Business Park , Tawnaghmore Lower Killala , Co. Mayo
2460699MayoLodged 15 Nov 2024Industrial
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedEnergy
The development will consist of the following elements — Battery Energy Storage System facility, consisting…
SSE Thermal Tawnaghmore Generation Station , Tawnaghmore Upper , Kilala Co. Mayo
2560108MayoLodged 28 Feb 2025
- GrantedEnergy
The development will consist of an enclosed battery energy storage system compound on c. 2.04 hectares. The…
Townland of Ballysumaghan , Srananagh , Co. Sligo
2560036SligoLodged 5 Feb 2025
- GrantedEnergy
A Battery Energy Storage System (BESS) development to consist of a new site entrance and access track, site…
Ballygammane and adjacent to the existing Thurles 110kV substation , Thurles , Co. Tipperary
2560940TipperaryLodged 22 Sept 2025
- GrantedEnergy
Will consist of a battery energy storage system (BESS) located within a fenced compound and will (subject to…
a c. 4.63 ha site within the former Lough Ree Power (LRP) Station , in the townlands of Aghamore and Lanesborough , Lanesborough (Lanesboro) Co. Longford
2460315LongfordLodged 19 Dec 2024
- GrantedEnergy
Permission is sought for a battery energy storage system which will comprise of up to 15 no. BESS units…
Caherdowney Millstreet Co. Cork
24/5910corkLodged 11 Oct 2024
- Awaiting decisionEnergy
For a 10 year planning permission for the construction of a Battery Energy Storage System (BESS). The BESS…
Industrial Development Agency (IDA) Business and Technology Park , Purcellsinch , Dublin Road
19482KilkennyLodged 12 Jul 2019
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.