Planning Permission Ireland
GrantedExtensionDecided 28 January 2022

Cloncarneel, Kildalkey, Co Meath C15 N9K1

Construction of a 1.5-storey extension with a garage and home office, plus a link corridor in Kildalkey.

212228 · Meath County Council · Lodged 25 November 2021

Reference
212228
Authority
Meath County Council
Register status
Decided
Type
PERMISSION
Received
25 November 2021
Residential units
1
Floor area
139.421 m²

Summary

AI-generated

Planning permission is sought for a new 1.5-storey building on the footprint of a previously approved garage, containing a garage and a first-floor home office. The project includes a single-storey flat roof link corridor to the main house and elevation alterations to increase internal floor areas.

Extensionextensionhome officegarage
Storeys
2

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

(a) the construction of a new storey and a half type building to the south-east side elevation of the existing dwelling on the footprint of the previously approved domestic garage (previous pl. Ref. Ta150996) containing a domestic garage at ground floor level and a work-from-home office/study at first floor level along with a single storey flat roof link corridor structure between each building and (b) the infill of the north-west elevations both at ground floor and first floor level to increase the internal floor areas including elevation alterations to suit incl. All associated landscaping, site works and services all at cloncarneel, kildalkey, co meath. Note that there are no additional bedrooms proposed and the existing waste water treatment plant is not affected by this proposed development, ie. No additional load proposed

Land-use zoning

What this land is zoned for

RA - Rural AreaRU
Rural Area

National zoning type: Mixed/general primary sector uses, including 'rural'

Objective set by the Meath County Development Plan 2021-2027 (2021–2027). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Key dates

Timeline

  1. Application received25 November 2021
  2. Decision due28 January 2022
  3. Decision issued28 January 2022
  4. Grant issued10 March 2022
  5. Permission expiry9 March 2027

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.