Planning Permission Ireland
Awaiting decisionHousing estate

Ninch, Laytown, Co. Meath

Construction of a large development of 569 single-storey, two-bedroom units with a playground and parking.

22674 · Meath County Council · Lodged 24 May 2022

Reference
22674
Authority
Meath County Council
Register status
Invalid or incomplete
Type
PERMISSION
Received
24 May 2022

Summary

AI-generated

The proposed development consists of 569 detached, single-storey two-bedroom units of approximately 33 square metres each. The scheme includes a playground, car and bicycle parking, alterations to the existing access on the R150, and all associated landscaping and site works.

Housing estatehousing estatelarge scaleplayground
Residential units
569
Storey
1

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The development will consist of: 569 no. Units (including private open space) (each unit comprising a detached, single storey two-bedroom property (c. 33 sq m each): playground; car parking spaces; bicycle parking spaces; alterations to the existing access/egress point on the r150 layout road to provide vehicular (including emergency), cyclist and pedestrian access and egress; provision of internal shared routes for vehicles, cyclists and pedestrians; surface water discharge; water main distribution system and connections; foul sewer pipes and connections; diversion of services; ancillary associated signage; hard and soft landscaping works, including changes in level, lighting and bin stores; boundary treatments; and all other site excavation and development works above and below ground

Land-use zoning

What this land is zoned for

E1/E2 - Strategic Employment Zones (High Technology Uses)/ General Enterprise & EmploymentSI
Strategic Employment Zones (High Technology Uses)/ General Enterprise & Employment

National zoning type: Industrial, enterprise, employment

Objective set by the Meath County Development Plan 2021-2027 (2021–2027). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Key dates

Timeline

  1. Application received24 May 2022

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.