Drogheda IDA Business and Technology Park, Donore Road, Drogheda Co. Meath
Construction of a large two-storey data storage facility with 26 emergency generators and associated infrastructure.
LB191735 · Meath County Council · Lodged 19 December 2019
- Reference
- LB191735
- Authority
- Meath County Council
- Register status
- Decided
- Type
- PERMISSION
- Received
- 19 December 2019
Summary
AI-generatedThe project involves clearing the site and altering existing roads to construct a 25-metre-high data storage facility spanning approximately 28,573 square metres. The development includes 26 emergency generators, a 6 MVA substation, water and diesel storage tanks, and solar panels.
- Storeys
- 2
- Floor area
- 28,573 m²
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
Alterations to existing road infrastructure within the site and clearance of the site (including removal of existing internal roadways and removal / diversion of services) to make way for the proposed development; construction of a two storey (with mezzanine levels at both storeys) data storage facility building with a maximum overall height of c. 25 metres, containing data halls, associated electrical and ahu plant rooms, a loading bay, maintenance and storage space, office administration areas, screened plant and solar panels at roof level, all within a building with a total gross floor area (gfa) of c. 28,573 sq. M; emergency generators (26 no. ), emission stacks and associated plant are provided in a fenced compound adjacent to the data storage facility, along with a single emergency house supply generator; a 6 mva substation and associated 6mva electricity connection; a water sprinkler pump room, mv building, unit substation, water storage tanks, humidifier tanks and diesel tanks and filling area; modification of the existing entrance to the subject site (from the estate road to the east), which will function as a secondary entrance providing for emergency and construction access. A new main entrance and access control point to the lands is proposed (also from the estate road to the east) and a single-storey gate house/ security building at this entrance with a gfa of c. 29.5 sq. M. ; construction of internal road network and circulation areas, footpaths, provision of 50 no. Car parking spaces and 26 no. Cycle parking spaces within a bicycle shelter; landscaping and planting (including provision of an additional planted berm to the northern boundary, and alterations to existing landscaping adjacent to the entrance to the business and technology park), boundary treatments, lighting, security fencing, bollards and camera poles, bin store, and all associated site works including underground foul and storm water drainage network, attenuation areas, and utility cables, on an application site area measuring 19.46 hectares. An eiar has been submitted with this application
Land-use zoning
What this land is zoned for
“Strategic Employment Zones (High Technology Uses)”
National zoning type: Office, business/technology park and related
Objective set by the Meath County Development Plan 2021-2027 (2021–2027). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.
Read the zoning objectives in the development planBuilt & sold
What happened next
Beyond the decision: whether this development was built, and what property here has sold for.
Recent sales nearby
within 500 m| Address | Date | Price | Distance |
|---|---|---|---|
| 53 Cedarfield, Donore Rd, Drogheda | Jun 2026 | €216,000 | 436 m |
| 9 Cederfield Close, Drogheda, Louth | Apr 2025 | €280,000 | 484 m |
Nearby properties, not this site — a guide to local values.
Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.
Key dates
Timeline
- Application received19 December 2019
- Decision due21 February 2020
- Decision issued6 February 2020
- Grant issued31 March 2020
- Permission expiry30 March 2025
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- Granted160 m away
The proposed development consists of the following: construction of a two storey (with mezzanine levels at…
Drogheda IDA Business & Technology Park , Donore Road , Drogheda Co Meath
21663MeathLodged 12 Apr 2021Industrial
- Granted240 m away
The installation of a new mezzanine floor with an area of 54m2 at 2.9 metres from ground floor level and a…
Costa Coffee Unit , Drogheda Retail Park Donore Road , Drogheda County Meath
LB170240MeathLodged 9 Mar 2017Alterations
- Granted250 m away
The development will consist of — Provision of a drive-thru lane for the Costa Coffee unit, including a…
Costa Coffee unit Drogheda Retail Park , Donore Road , Drogheda Co. Meath
2460390MeathLodged 29 May 2024Commercial
- Granted300 m away
The development will consist of (a) Standalone new internally illuminated totem outside of North-East…
Drogheda College (formally known as the Prism Building) IDA Business and Technology Park , Donore Road Drogheda , Co. Meath
2460141MeathLodged 27 Feb 2024Commercial
- Awaiting decision310 m away
The proposed development will comprise a new Hotel up to 5 storeys in height and comprising the following —…
Drogheda IDA Business & Technology Park , Donore Road , Drogheda County Meath
2660675MeathLodged 3 Jun 2026Commercial
- Awaiting decision350 m away
The change of use of the mezzanine level of Unit 2 from storage to retail warehouse use, proposed associated…
Unit 2 Drogheda Retail Park , Donore Road , Drogheda Co. Meath
23884MeathLodged 13 Sept 2023Change of use
- Granted350 m away
The change of use of the mezzanine level of Unit 2 from storage to retail warehouse use, proposed associated…
Unit 2 Drogheda Retail Park , Donore Road , Drogheda Co. Meath
23983MeathLodged 16 Oct 2023Change of use
- Granted360 m away
Permission for new single storey extension (44sqm) to side of existing motor showroom at existing premises
Audi Drogheda , Donore Road , Drogheda
19362LouthLodged 14 May 2019Commercial
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedIndustrial
The proposed development occupies part of the site of (and will supersede) a previously permitted data centre…
Site located at Avoca River Park , Arklow , Co. Wicklow
2372WicklowLodged 27 Jan 2023
- GrantedIndustrial
The proposed development consists of the following: construction of a two storey (with mezzanine levels at…
Drogheda IDA Business & Technology Park , Donore Road , Drogheda Co Meath
21663MeathLodged 12 Apr 2021
- GrantedInfrastructure
To construct the following: a 24,505sqm single storey data centre building, a 5232sqm single storey Logistics…
Palmerstown Toberroe & Derrydonnell ,
211047galwayLodged 14 Jun 2021
- GrantedInfrastructure
Provision of 4 new information and communications technology (ICT) Facility buildings and associated…
3-4, Crag Avenue, Clondalkin Industrial Estate, Clondalkin, Dublin 22
SD20A/0309/EPSouth DublinLodged 27 Apr 2026
- GrantedEnergy
The proposed development comprises: 1.2 no. 2 storey data centre buildings (each 16,576 sqm), which are 16m…
Woodlands & Former Diamond Innovations Site, Clonshaugh Business & Technology Park, Dublin 17
3803/20Dublin CityLodged 25 Nov 2020
- Awaiting decisionIndustrial
Demolition of existing ind building units totalling (C.2784.4m2) comprising of a c.7.1m high Overall Main…
Avoca River Park , Shelton Abbey & Kilbride , Arklow
201247WicklowLodged 8 Dec 2020
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.