Awaiting decisionIndustrial

Avoca River Park, Shelton Abbey & Kilbride, Arklow

Demolition of industrial buildings and construction of three data centre buildings.

201247 · Wicklow County Council · Lodged 8 December 2020

Reference
201247
Authority
Wicklow County Council
Register status
Invalid or incomplete
Type
PERMISSION
Received
8 December 2020

Summary

AI-generated

Planning permission is sought for the demolition of existing industrial buildings totaling approximately 2,784.4 sqm and the development of three data centre buildings with ancillary offices, plant, and standby power generation compounds at Avoca River Park, Arklow.

Industrialdata centredemolitionindustrialinfrastructure
Floor area
29,072 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Demolition of existing ind building units totalling (c. 2784.4m2) comprising of a c. 7.1m high overall main building (c. 2460m2), a c. 4.2m high sub-station (c. 107.3m2), a c. 3.6m high guardhouse (c. 106.2m2), a c. 3.6m high east-building (c. 39.1m2), c. 5m high water tank (c. 56.8m2) &c. 2.6m high pump house building (c. 15.1m2), assoc works
  • Dev of 3 no. Data centre buildings, ancillary offices & plant comprising of: data centre building a, - a single storey data centre building, with mezzanine 1st floor level offices (gfa c. 10,564m2, building height c. 13,658m & structures c. 15,137m), made up of 2 no. Data halls & loading areas with assoc 2 no. Dock levellers & including 10 no. C. 14m high flues, & adjacent 1 no. Standby power generation compounds, consisting of 10 no. Hv diesel generators &belly tanks (gfa c. 530 m2), 1 no. Storage fuel tank (gfa c. 15m2). Data centre building b – a single storey data centre building with mezzanine 1st floor level offices (gfa c. 18,508m2, building height c. 13,658m &structures c. 15,137m), made up of 4 no. Data halls &loading areas with associated 2 no. Dock levellers &including 20 no. C. 14m high flues, &adjacent 2 no. Standby power generation compounds, consisting of 20 no. Hv diesel generators &belly tanks (gfa c. 1,060 m2), 2 no. Storage fuel tanks (gfa c. 30m2). Data centre building c – a single storey data centre building with mezzanine 1st floor level offices (gfa c. 18,508m2, building height c. 13,658m & structures c. 15,137m), made up of 4 no. Data halls & loading areas with associated 2 no. Dock levellers &including 20 no. C. 14m high flues, &adjacent 2 no. Standby power generation compounds, consisting of 20 no. Hv diesel generators & belly tanks (gfa c. 1,060 m2), 2 no. Storage fuel tanks (gfa c. 30m2)
  • Upgrading of existing 110 kv substation to comprise of compound (c. 8539m2) consisting of 11 kv gis switch room (gfa c. 708m2), &4 no. External transformers (gfa c. 550m2), a grid connection, security fence & all assoc works & services
  • Dev of 1 no. Fire hydrant pump hse (gfa c. 129m2) with sprinkler tank (c. 49m2), 1 no. Single storey security guard hse (gfa c. 48m2) &2 no. Vehicular accesses, internal access rds & 224 no. Surface car parking spaces
  • An upgraded attenuation basin, a proposed ww treatment plant &polishing filter
  • All assoc site services, with c. 2.7m high palisade fence, landscaping, boundary & all assoc site development works above & below ground. An eiar has been prepared in respect of the proposed dev

Key dates

Timeline

  1. Application received8 December 2020

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.