Planning Permission Ireland
Awaiting decisionEnergy

The site is located within the townlands of Carney's Island Altartate Glebe, Legarhill and Clonavilla, County Monaghan.

Construction of a single-turbine wind farm with a tip height of 143.8 metres and associated infrastructure.

2560400 · Monaghan County Council · Lodged 7 October 2025

Reference
2560400
Authority
Monaghan County Council
Register status
In progress
Type
PERMISSION
Received
7 October 2025

Summary

AI-generated

A 10-year planning permission is sought for a single 4.8-megawatt wind turbine with a tip height of 143.8 metres. The project includes a substation, access tracks, a new bridge crossing, demolition of two old stone buildings, and a grid connection to the Clones substation.

Energywind farmturbineinfrastructuredemolition
Floor area
76,400 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

10-year planning permission for development. The development will consist of the construction of a single turbine wind farm development on a 7.64-hectare site consisting of:- a) a single 4.8-megawatt (mw) wind turbine with an overall tip height of 143.8 metres, comprising a rotor diameter of 133.2m and a hub height 78m;b) wind turbine foundation, crane hardstanding and assembly area; c) temporary construction compound; d) upgrade of an existing field entrance to new wind farm site entrance; e) upgrading and widening of existing access tracks; f)new access tracks; g) a new 10.5m clear span bridge crossing an existing stream; h) demolition of the ruinous remains of two old stone buildings; i) an on-site 20kv electrical substation; j) electrical and communication cabling within private lands; k) underground 20kv grid connection within private lands and within the r183 public road connecting to the existing esb clones 38kv substation; l) tree felling, landscaping and reinstatement works; and m) all associated ancillary works. The operational lifespan of the development will be 35-years from the date of commissioning. This development is covered by the provisions of the renewable energy directive iii (directive (eu) 2023/2413) and it is important to note that the planning application may be subject to section 34d of the planning and development act 2000, as amended. When a notice issues in accordance with section 34d(b), the provisions of article 26a of the planning and development regulations 2001 to 2025 shall apply

Key dates

Timeline

  1. Application received7 October 2025
  2. Further information requested1 December 2025
  3. Further information received9 April 2026

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.