Awaiting decisionEnergy

Moanbrack and Rathnameneenagh, Ring Dungarvan, County Waterford

A 4.6MW wind farm project featuring two 120m high wind turbines in Ring, Dungarvan.

2560760 · Waterford City and County Council · Lodged 25 October 2025

Reference
2560760
Authority
Waterford City and County Council
Register status
Invalid or incomplete
Type
PERMISSION
Received
25 October 2025

Summary

AI-generated

The development consists of erecting two wind turbines with a tip height of 120m, a rotor diameter of 82m, and a hub height of 79m. It includes upgrading access tracks, installing a site drainage network, constructing an on-site substation, and laying underground cabling to connect to the grid.

Energywind energyinfrastructuresubstation

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

A renewable energy project with a total capacity of 4.6mw this development will consist of:a) erection of no. 2 wind turbines with a tip height of 120m. The wind turbines will have a rotor diameter of 82m and a hub height of 79m b)upgrade of existing access tracks and construction of new permanent access tracks, permanent turbine hardstand areas and turbine foundations c) installation of a site drainage network including sediment control systems d)wind farm internal cabling connecting the wind turbines to the electrical substation e)construction of a permanent single-storey on-site 20kv substation with grid connection to the existing 20kv ballycurreen substation, all associated electrical plant and equipment, security fencing, gates, signage, all associated underground cabling, and all ancillary structures and works. F)construction of a permanent single circuit 20kv underground cable grid connection to connect to the existing overhead line serving the existing 20kv ballycurreen substation. G)construction of a temporary construction compound for use during construction. H)landscaping, fencing and all associated ancillary works. This application is seeking a ten-year permission and a 35 year operational period from the date of overall commissioning of the entire wind farm. The planning application is accompanied by a natura impact statement (nis). This development is covered by the provisions of the renewable energy directive iii (directive (eu) 2023/2413) and it is important to note that the planning application may be subject to section 34d of the planning and development act 2000, as amended. When a notice issues in accordance with section 34d(b), the provisions of article 26a of the planning and development regulations 2001 to 2025 shall apply.

Key dates

Timeline

  1. Application received25 October 2025

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.