GrantedEnergyDecided 18 January 2023

35.5 HA SITE KNOWN AS 'WEST OFFALY POWER (WOP) STATION' LOCATED AT SHANNONBRIDGE IN THE TOWNLAND OF CLONIFFEEN, EIRCODE N37 C840 CO. OFFALY

Demolition of the former West Offaly Power Station to build a battery energy storage system and synchronous condenser.

22223 · Offaly County Council · Lodged 5 May 2022

Reference
22223
Authority
Offaly County Council
Register status
Decided
Type
PERMISSION
Received
5 May 2022

Summary

AI-generated

The project involves the demolition of the existing power station structures, which have a total gross floor area of approximately 28,000 square metres. In its place, a battery energy storage system (BESS) and a synchronous condenser will be developed and operated to provide electricity grid services. The development will be carried out in two distinct phases.

Energydemolitionbatterygrid servicesinfrastructure
Floor area
28,000 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The demolition of the existing wop station (as approved under offaly county council ref. 01/187 / an bord pleanála ref. Pl 19.125575 and all subsequent permissions); and the development and operation of electricity grid services — namely a battery energy storage system (bess) and a synchronous condenser (sync con). The proposed development comprises two distinct phases of activity. Phase 1 comprises the demolition of existing site structures (with a total footprint of c. 1 3, 124 sq. M. And a total gross floor area ofc. 28,000 sq. M. ) including the former wop station, the intermediate peat storage building and associated fuel management system; and ancillary buildings including: electrical tippler and associated control room and office, screening, lorry unloading, water treatment plant, offices, laboratory, workshop and maintenance buildings, oil pumphouse, electrics rooms, railway / locomotive service building, cooling water pump house and sewage / foul water treatment facility. All buildings and structures will be demolished to ground level, and the site will be reinstated and secured with boundary gates and fences, etc. Associated with the demolition activity there will be on-site crushing of material using mobile machinery, for the purposes of disposal and / or material re-use. Phase 2 comprises the proposed development of the bess, sync con; and all associated development. The bess will comprise a 75 mw capacity battery storage facility located within fenced and gated compound and will include up to 22 no. Battery storage units incorporating a concrete base, battery modules, associated plant and equipment including transformers and inverters a 240 sq. M. Single-storey control building; the sync con will comprise a 400 mva synchronous condenser located within a c. 0.7 ha compound and will include a sync con building (c. 962 sq. M. , c. 14 m high). Including a maintenance laydown area; and a chainlink or palisade fence and access gate linking with the existing station roads. Both developments will be served by grid connections, boundary fences and gates, and landscaping. Existing access roads will continue to be used to serve the new development and will not be altered. Site services —and a 20 kv rural supply circuit breaker building (c. 18 sq. M. ), will continue to be used to serve the new development. Planning permission is sought for a duration of 10 years. (full detailed description in attached appendix a)

Key dates

Timeline

  1. Application received5 May 2022
  2. Further information requested29 June 2022
  3. Further information received1 November 2022
  4. Decision due18 January 2023
  5. Decision issued18 January 2023
  6. Grant issued23 February 2023
  7. Permission expiry22 February 2028

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.