GrantedEnergyDecided 6 November 2024

Former West Offaly Power (WOP) Station, in the townland of Cloniffeen Shannonbridge, Co. Offaly

Demolition of four structures and construction of a battery energy storage system at the former West Offaly Power Station.

2460356 · Offaly County Council · Lodged 12 September 2024

Reference
2460356
Authority
Offaly County Council
Register status
Decided
Type
PERMISSION
Received
12 September 2024

Summary

AI-generated

The development on a 7.34-hectare site will consist of a battery energy storage system (BESS) within a fenced compound. It includes the demolition of four prefabricated structures totaling 876 sq.m and the installation of up to 768 battery energy storage enclosures, a control building, and ancillary plant equipment.

Energybatteryenergydemolitionbess
Floor area
876 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The proposed development of area 7.34 ha, will consist of a battery energy storage system (bess) located within a fenced compound and will (subject to detailed design, commercial and technical considerations) comprise of: demolition of 4 no. Prefabricated structures (c. 876 sq. M total); up to 768 no. Battery energy storage enclosures, organised in approx. 36 no. Bays. Each battery enclosure will incorporate battery packs as well as power electronics, battery management systems, cooling units and fire suppression systems. The battery bays will be 5m wide x 3m high and vary in length from 23.8m to 33.7m; 11 no. Medium voltage (mv) skids (c. 6m x 10.2m x 2.5m); control building (c. 285.3 sq. M); ancillary plant and equipment comprising of: an emergency diesel generator plinth (c. 28.7 sq. M); two spare parts containers (c. 29.7 sq. M); a fire fighting water tank and pump house (c. C. 62 sq. M); an underground oil separator and collection pit; customer transformer compound including a bunded main step-up transformer (c. 141 sq. M) and firewalls, and high voltage (hv) switchgear, linking with an underground cable; and auxiliary transformers (c. 4m x 4m x 3m); operation and maintenance site office including welfare facilities (c. 27.9 sq. M); all services connections including electrical, water and wastewater and connections to existing surface water drains; 2 no. Lightning monopoles (c. 18m high); a c. 135m long, c. 5m tall concrete retaining wall to the east of the site; and all other ancillary site clearance and development works including provision of biodiversity landscaping; areas of hardstanding; internal access roads; lighting; laydown area; fencing and access gates (c. 4m in height); car parking; and connections to site services networks. Planning permission is being sought for a duration of 10-years. Wop station is licenced by the environmental protection agency under an industrial emissions (ie) licence [ref. P0611-02]. A natura impact statement (nis) is submitted with the planning application.

Key dates

Timeline

  1. Application received12 September 2024
  2. Decision due6 November 2024
  3. Decision issued6 November 2024
  4. Grant issued11 December 2024
  5. Permission expiry10 December 2034

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.