Development plan · Cork County Council
Cork County Development Plan 2022–2028 – Volume One: Main Policy Material
The council's development plan written statement: its strategy, policies, objectives and development standards. Variations adopted since are not in this text.
Cork County Council · 2022–2028 · 564 pages
Ask this document
Answers come only from the text of Cork County Development Plan 2022–2028 – Volume One: Main Policy Material, each claim linked to its page. They are not advice; check the page itself.
Free, with a daily limit.
- 491 Table D3 - Residential Lands NPF Tiering Greater Cork Ring SPA NPF Appendix 3 Tier 1 & 2 Residential Zoned Lands Services & Location Criteria Serviced Requires Intervention Zoning Reference Tier Roads Access Footpath Access Public Lighting Foul Sewer Drainage Surface Water Drainage Water Supply Location Within Existing Built Up Footprint Contiguous To Existing Developed Lands Contiguous To Tier 1 Lands Castlemartyr CM-R-01 1 CM-RAP-02 1 Settlement Scaled Infrastructure Requirements Infrastructure Type Intervention Required Water Supply WWTP upgrade listed on Irish Water Investment Plan 2020-2024. GO TO CONTENTS
- 492 Table D3 - Residential Lands NPF Tiering Greater Cork Ring SPA NPF Appendix 3 Tier 1 & 2 Residential Zoned Lands Services & Location Criteria Serviced Requires Intervention Zoning Reference Tier Roads Access Footpath Access Public Lighting Foul Sewer Drainage Surface Water Drainage Water Supply Location Within Existing Built Up Footprint Contiguous To Existing Developed Lands Contiguous To Tier 1 Lands Rathcormack RK-R-01 1 RK-RAP-02 1 RK-R-03 1 Settlement Scaled Infrastructure Requirements Infrastructure Type Intervention Required GO TO CONTENTS
- 493 Table D3 - Residential Lands NPF Tiering Greater Cork Ring SPA NPF Appendix 3 Tier 1 & 2 Residential Zoned Lands Services & Location Criteria Serviced Requires Intervention Zoning Reference Tier Roads Access Footpath Access Public Lighting Foul Sewer Drainage Surface Water Drainage Water Supply Location Within Existing Built Up Footprint Contiguous To Existing Developed Lands Contiguous To Tier 1 Lands Watergrasshill WT-R-01 1 WT-R-02 1 WT-R-03 1 Settlement Scaled Infrastructure Requirements Infrastructure Type Intervention Required GO TO CONTENTS
- 494 Table D3 - Residential Lands NPF Tiering North Cork SPA NPF Appendix 3 Tier 1 & 2 Residential Zoned Lands Services & Location Criteria Serviced Requires Intervention Zoning Reference Tier Roads Access Footpath Access Public Lighting Foul Sewer Drainage Surface Water Drainage Water Supply Location Within Existing Built Up Footprint Contiguous To Existing Developed Lands Contiguous To Tier 1 Lands Buttevant BV-R-01 2 Wastewater quality to be addressedBV-RAP-02 2 Settlement Scaled Infrastructure Requirements Infrastructure Type Intervention Required Waste Water Water quality impacts and/or licence compliance issues associated with wastewater infrastructure serving Buttevant must be addressed to accommodate further growth and is currently under review. GO TO CONTENTS
- 495 Table D3 - Residential Lands NPF Tiering North Cork SPA NPF Appendix 3 Tier 1 & 2 Residential Zoned Lands Services & Location Criteria Serviced Requires Intervention Zoning Reference Tier Roads Access Footpath Access Public Lighting Foul Sewer Drainage Surface Water Drainage Water Supply Location Within Existing Built Up Footprint Contiguous To Existing Developed Lands Contiguous To Tier 1 Lands Charleville CV-RR-01 1 CV-R-02 1 CV-R-03 2 Local road upgrade on L1311CV-RAP-01 2 CV-RR-02 1 Settlement Scaled Infrastructure Requirements Infrastructure Type Intervention Required Water SUpply Charleville receives its drinking water from the Charleville Water Supply. Significant watermain network leakage issues within the Charleville Water Supply have been corrected. Need for additional water conservation will be monitored in order to provide an adequate drinking water supply to service zoned lands in Charleville. Waste Water Wastewater in Charleville is conveyed via a largely combined sewer network to the Charleville Waste Water Treatment Plant (WWTP). Upgrading of the Charleville WWTP planned by Irish Water is required to accommodate the proposed development in Charleville GO TO CONTENTS
- 496 Table D3 - Residential Lands NPF Tiering North Cork SPA NPF Appendix 3 Tier 1 & 2 Residential Zoned Lands Services & Location Criteria Serviced Requires Intervention Zoning Reference Tier Roads Access Footpath Access Public Lighting Foul Sewer Drainage Surface Water Drainage Water Supply Location Within Existing Built Up Footprint Contiguous To Existing Developed Lands Contiguous To Tier 1 Lands Kanturk KK-RAP-01 2 Options available, to be agreed. Wastewater quality to be addressedKK-R-02 2 KK-R-03 2 Footpath upgrade required on Freemount road 200m watermain connection required Settlement Scaled Infrastructure Requirements Infrastructure Type Intervention Required Waste Water Water quality impacts and/or licence compliance issues associated with waste-water infrastructure serving the town must be addressed to accommodate further growth and is currently under review. GO TO CONTENTS
- 497 Table D3 - Residential Lands NPF Tiering North Cork SPA NPF Appendix 3 Tier 1 & 2 Residential Zoned Lands Services & Location Criteria Serviced Requires Intervention Zoning Reference Tier Roads Access Footpath Access Public Lighting Foul Sewer Drainage Surface Water Drainage Water Supply Location Within Existing Built Up Footprint Contiguous To Existing Developed Lands Contiguous To Tier 1 Lands Millstreet MS-R-01 1 MS-R-02 2 Extension to network Settlement Scaled Infrastructure Requirements Infrastructure Type Intervention Required GO TO CONTENTS
- 498 Table D3 - Residential Lands NPF Tiering North Cork SPA NPF Appendix 3 Tier 1 & 2 Residential Zoned Lands Services & Location Criteria Serviced Requires Intervention Zoning Reference Tier Roads Access Footpath Access Public Lighting Foul Sewer Drainage Surface Water Drainage Water Supply Location Within Existing Built Up Footprint Contiguous To Existing Developed Lands Contiguous To Tier 1 Lands Mitchelstown MH-R-01 1 MH-RAP-02 1 MH-R-03 1 MH-R-04 1 MH-RAP-05 1 MH-R-06 1 MH-R-07 1 Settlement Scaled Infrastructure Requirements Infrastructure Type Intervention Required Water Supply An additional water source is required to be identified and/or leakage reduction measures. Waste Water Upgrading of Mitchelstown WWTP to provide adequate capacity to accommodate proposed development in Mitchelstown is required. GO TO CONTENTS
- 499 Table D3 - Residential Lands NPF Tiering North Cork SPA NPF Appendix 3 Tier 1 & 2 Residential Zoned Lands Services & Location Criteria Serviced Requires Intervention Zoning Reference Tier Roads Access Footpath Access Public Lighting Foul Sewer Drainage Surface Water Drainage Water Supply Location Within Existing Built Up Footprint Contiguous To Existing Developed Lands Contiguous To Tier 1 Lands Newmarket NK-R-01 2 Wastewater quality to be addressed NK-R-02 2 Options available, to be agreed. Pedestrian crossing to access existing footpath Wastewater quality to be addressed Pumping station upgrade Settlement Scaled Infrastructure Requirements Infrastructure Type Intervention Required Water Supply The water source (Ballinatona) serving Newmarket has limited spare capacity and upgrading and/or leakage reduction measures will be required to cater for the development of all the lands zoned in Newmarket Waste Water Upgrading of the wastewater treatment infrastructure will be required to accommodate proposed growth in Newmarket. Water quality impacts and/or licence compliance issues associated with wastewater infrastructure serving the town must be addressed to accommodate further growth and is currently under review. GO TO CONTENTS
- 500 Table D3 - Residential Lands NPF Tiering West Cork SPA NPF Appendix 3 Tier 1 & 2 Residential Zoned Lands Services & Location Criteria Serviced Requires Intervention Zoning Reference Tier Roads Access Footpath Access Public Lighting Foul Sewer Drainage Surface Water Drainage Water Supply Location Within Existing Built Up Footprint Contiguous To Existing Developed Lands Contiguous To Tier 1 Lands Bantry BT-R-01 2 Junction required at access road and public road BT-R-02 2 L4711 Road upgrade Provided as part of L4711 upgrade Provided as part of L4711 upgrade c.600 metre sewer extension Surface water network extension c.300m watermain extensionBT-RAP-03 2 BT-RR-01 2 Provision of BT-U-03 relief road required Provided as part of BT-U-03 relief road Provided as part of BT-U-03 relief road BT-R04 2 Roads access to be provided Footpath provision required Public lighting provision required Connection to public sewer required Surface water network extension Connection to mains supply required BT-R-05 2 Local road upgrade Provided as part of local road upgrade Provided as part of local road upgrad Extension to existing sewer Surface water network extension Extension to existing network BT-X-01 1 BT-X-03 2 Roads access required Provided as part of road access Provided as part of road access Settlement Scaled Infrastructure Requirements Infrastructure Type Intervention Required Water Supply Bantry Water Supply Scheme – Impoundment, Reservoirs and Network, is presently being assessed by Irish Water Waste Water Bantry Sewerage Scheme is presently being assessed by Irish Water. GO TO CONTENTS
Source Cork County Council: Cork County Development Plan 2022–2028 – Volume One: Main Policy Material (2022–2028) · Licence the publisher's termsText read from the publisher’s PDF; tables, maps and drawings do not survive as text, and page numbers are the PDF’s (its first page is 1). Check the original before relying on a passage.