Development plan · Dublin City Council

Dublin City Development Plan 2022–2028 – Volume 1: Written Statement (as varied by Variations Nos. 1–11)

The council's development plan written statement: its strategy, policies, objectives and development standards.

Dublin City Council · 2022–2028 · 696 pages

Ask this document

Answers come only from the text of Dublin City Development Plan 2022–2028 – Volume 1: Written Statement (as varied by Variations Nos. 1–11), each claim linked to its page. They are not advice; check the page itself.

Free, with a daily limit.
  1. Strategic Development Regeneration Areas | Chapter 13 431 Figure 13-6: SDRA 4 Park West/Cherry Orchard
  2. Strategic Development Regeneration Areas | Chapter 13 432 13.7 SDRA 5 – Naas Road Introduction A Local Area Plan (LAP) for the Naas Road lands was adopted by the City Council on 14 January 2013. The plan was extended for a further 5 years in 2018 and will expire in January 2023. The plan area covers approximately 100 hectares and contains a number of major brownfield sites. It occupies a strategic location on a gateway point into the city with good public transportation links to the wider metropolitan area. The remaining lands to be fully developed out covers an area of approximately 18 hectares. Dublin City Council together with South Dublin County Council are currently in the process of preparing “The City Edge Project” funded under the Urban Regeneration and Development Fund (URDF) programme which is a new Strategic Framework Plan for the Naas Road, Ballymount and Park West area comprising of c. 700 hectares. The vision for the area is to create a mixed use and climate resilient high density urban quarter of the city, where citizens will be able to access affordable homes, live close to where they work, in an area home to outstanding public amenities and public transport services. The City Edge project will inform a new Statutory Plan to be prepared for this area over the life of the Development Plan. The Naas Road SDRA sets out guiding principles for lands within the current Naas Road LAP and part of the future City Edge project. The guiding principles are in place to support development in the area pending the finalisation of the City Edge Project and Statutory Plan for the area. The SDRA contains six remaining key re-development sites, namely: ▪ Royal Liver Retail Park ▪ Motor Distributors Ltd site (Volkswagen factory) ▪ Nissan plant site ▪ Bluebell Avenue ▪ Former Bluebell Road Regeneration Area ▪ Naas Road Industrial Estate and surrounding lands Linking the re-development of these sites into the wider surrounding environment, and creating sustainable successful communities is central to the successful regeneration of this SDRA. Some of the key sites identified in the area have been the subject of planning activity in recent years, with permission for c.3,300 units in the vicinity of the Naas Road/Kylemore Road junction. The SDRA seeks to continue to support the redevelopment of the keys sites for mixed use development in the short term pending the adoption of a new LAP for the area.
  3. Strategic Development Regeneration Areas | Chapter 13 433 Guiding Principles for Key Opportunity Sites The Naas Road LAP provides guidance in relation to the development of the key opportunity sites 1-6 below, of which the key site specific issues updated and summarised below with said objectives being part of this SDRA going forward. 1 – Royal Liver ▪ To encourage the sustainable redevelopment of this key site as part of the mixed-use core of the Key Urban Village containing office and residential uses with local scale retail and service uses. To provide for a boulevard leading to a pocket park and pedestrian and cycling connections through the site to increase connectivity and deliver the green infrastructure network. ▪ To provide for a sustainable approach to height within the site, with buildings addressing the Naas Road and Kylemore Road providing a strong building line with appropriate heights, marked at the corner with a landmark building of up to 17 storeys. Within the site, heights will be at sustainable level, appropriate to the uses proposed. ▪ Require setbacks to be agreed with Dublin City Council along the main road frontages at Naas Road, along the east side of Kylemore Road to facilitate upgrading of the road to provide for a bus lane, segregated cycleway, greening of the route and footpaths allowing for an attractive and vibrant street environment and to encourage pedestrian and cyclist activity. 2. Motor Distributors Site ▪ Facilitate the sustainable redevelopment of this key site with a fine urban grain and a mix of uses as part of the mixed-use core of the Key Urban Village all at sustainable densities within a vibrant and interesting environment and integrating with the wider plan area and the administrative area of South Dublin County Council directly adjoining and aligning with the City Edge Project when adopted. ▪ Require a general height of between 6 and 8 storeys fronting onto Walkinstown Avenue, Longmile Road, Robinhood Road. There is potential for one to two mid -rise buildings (up to 50m) within the site. ▪ The height of new development along Naas Road, directly adjacent to the protected structure, should protect the special character and its setting. ▪ Require setbacks along the west side of Walkinstown Avenue and north side of Long Mile Road to facilitate widening of the road to provide for a bus lane, segregated cycleway and footpath allowing for an attractive and vibrant street environment and to encourage pedestrian and cyclist activity. ▪ Facilitate landuses that introduce active frontages and enliven the streets along Walkinstown Avenue, Long Mile Road and along priority pedestrian routes running through the site. Such uses may include local services such as retail, cafes, restaurants, leisure, cultural and community uses, reception areas to commercial areas above and
  4. Strategic Development Regeneration Areas | Chapter 13 434 other complementary active uses. Design of all units at street level should have a strong urban edge, convey openness and contribute to vibrancy in the public realm. ▪ Require the provision of a flexible and publicly accessible facility for community and cultural uses, and for any development proposal to include a community and cultural audit. Dublin City Council will, in consultation with local stakeholders, identify suitable uses for the facility. The form, size and other details of this/these space(s) shall be designed in consultation with Dublin City Council and will become part of the resources of Dublin City Council to support community and cultural activities in the city. ▪ Require the provision of a pocket park/performances space. ▪ Retain the Volkswagen premises (protected structure ref. 5792) as a landmark and formal entry point to the city and ensure the enhancement and protection of the special interest and character of the structure in any refurbishment, adaption or reuse; regard to be had to Dublin City Council’s upcoming guidelines on protection and refurbishment of buildings of the late twentieth century once published. ▪ Improve views of the Volkswagen Premises (protected structure ref. 5792) from the Naas Road by incorporating a strategically placed pedestrian access point into the northern boundary treatment of the site, incorporating a redesign of landscaping and an appropriate lighting scheme. This pedestrian point should allow for easy access to nearby bus stops and the Kylemore Luas stop. ▪ Provide for a predominantly pedestrian and cyclist-orientated environment at street level. The majority of car parking shall be provided at basement or at under-croft levels provided such under-croft parking does not undermine the objective to provide for active street frontages. A limited amount of well-designed car parking shall be facilitated at surface level subject to good design, integration with the street and broken up with landscaping and/or street furniture. ▪ Provide for a clearly defined arrangement of public spaces which integrate into the emerging pedestrian / green routes and cycle network for the plan area and beyond and that increases permeability throughout the site by incorporating clearly defined east-west and north-south pedestrian and cyclist-friendly routes through the site framed by buildings on both sides and containing active street level uses along these pedestrian routes allowing for passive supervision. ▪ Provide for a boulevard traversing the core of the site in an east-west direction integrating with the boulevard to be provided on that key site to the east of Walkinstown Avenue (the Nissan site). This space shall accommodate pedestrian, cyclist and vehicular movement but will be so designed so as to prioritise pedestrian and cyclist movement. This boulevard shall incorporate street art, furniture and planting, SuDS and shall be an attractive space for relaxation. The boulevard shall be overlooked by residential units on some upper levels and fine grain neighbourhoodlevel retail units, cafes, cultural uses and other complementary uses at ground floor levels.
  5. Strategic Development Regeneration Areas | Chapter 13 435 ▪ Assist in promoting modal shift to sustainable modes of transport by enhancing connections between the site and the Kylemore Luas and Dublin Bus stops by reserving road space for a setdown for buses on Walkinstown Avenue, by incorporating new pedestrian access points in boundaries of the site and provide for enhanced pedestrian crossings over the Naas Road, Walkinstown Avenue and Long Mile Road. ▪ As part of the redevelopment of this site the 750mm watermain may need to be diverted. Such a diversion would be at the expense of the developer(s). ▪ To retain existing mature trees and planting on this key site, in particular those trees along the site’s northern boundary and the tree line located in the southern section of the site, where feasible and appropriate. 3. Former Nissan Site ▪ To facilitate the sustainable redevelopment of this key site with a fine urban grain and a mix of uses as part of the mixed-use core of the key urban village, all at sustainable densities within a vibrant and interesting environment and integrating with the wider plan area. ▪ Require a general height of between 6 and 8 storeys fronting onto Walkinstown Avenue, Longmile Road and Naas Road; and two locally buildings of up to 15 storeys, one at the junction of Walkinstown Avenue and Long Mile Road, and one at the junction of Walkinstown Avenue and Naas Road. ▪ Require setbacks (to be agreed with the planning department) along the main road frontages at Naas Road, along the east side of Walkinstown Avenue and north side of Long Mile Road to facilitate widening of the road to provide for a bus lane, segregated cycleway and footpath allowing for an attractive and vibrant street environment and to encourage pedestrian and cyclist activity. ▪ Facilitate landuses that introduce active frontages along the Naas Road, Walkinstown Avenue and Long Mile Road, and priority pedestrian routes running through the site. Such uses may include local services such as retail, cafes, restaurants, leisure, cultural and community uses, reception areas to commercial areas above and other complementary active uses. Design of all units at street level should have a strong urban edge, convey openness and contribute to vibrancy in the public realm. ▪ Require the provision of a flexible and publicly accessible facility for community and/or health uses and a crèche in any redevelopment of this site to serve the needs of the residents in the area. ▪ Provide for a pedestrian and cyclist focused environment at street level. The majority of car parking serving commercial schemes shall be provided at basement or at undercroft levels provided such undercroft parking does not undermine the objective to provide active street frontages. A limited amount of well-designed car parking shall be facilitated at surface level (particularly within residential areas) subject to good design, integration with the street and with landscaping and/or street furniture.
  6. Strategic Development Regeneration Areas | Chapter 13 436 ▪ Provide for a clearly defined arrangement of public spaces which integrate into the emerging pedestrian/green routes and cycle network for the plan area and beyond and that increases permeability throughout the site by incorporating clearly defined east-west and north-south pedestrian and cyclist friendly routes through the site framed by buildings on both sides and containing active street level uses along these pedestrian routes allowing for passive supervision. ▪ Provide for boulevards traversing the large site in an east-west and north-south direction integrating with the local green links running through the site and integrating with the boulevard to be provided on the key site to the west of Walkinstown Avenue (the Motor Distributors site). This space shall incorporate street art, furniture and planting and SuDS, and shall be attractive space for relaxation. The boulevard shall be overlooked by residential and commercial on upper levels with ground levels dominated by retail units, cafes, cultural and/or community uses and other complementary uses. ▪ Assist in promoting modal shift to sustainable modes of transport by enhancing connections between the site and the Kylemore Luas and Dublin Bus stops by providing for new pedestrian access points in all three boundaries of the site and providing for enhanced pedestrian crossings over the Naas Road and Walkinstown Avenue. ▪ To green and improve the major road arteries surrounding this key site i.e. Naas Road, Walkinstown Avenue, and Long Mile Road, to include wider footpaths, additional tree lines (incorporating native species), soft landscape zones, additional pedestrian crossing points, and off road cycle routes. ▪ To seek the undergrounding of the 110 KV and 38KV high voltage overhead cabling traversing the LAP area. The route for undergrounding the cables will be assessed by ESB Networks with the applicants/developers, and in that event the cost of the undergrounding of the lines including associated civil works would be borne by the developers and ESB. ▪ To provide a new HV substation within the site, integrated with the undergrounding of cabling to meet the level of demand. ▪ As part of the redevelopment of this site the 750mm watermain may need to be diverted. Such a diversion would be at the expense of the developer(s). 4 - Bluebell Avenue It is considered that the two parcels of land, located on the northern and southern side of Bluebell Avenue, have the potential to deliver a mixed use development and that this should be the subject of a masterplanning process. The development of the northern portion of the site shall include an adequate setback from the Grand Canal and take account of the conservation zoning.
  7. Strategic Development Regeneration Areas | Chapter 13 437 5 - Former Bluebell Road Regeneration Area This c.2.8 Ha site currently accommodates the existing Bluebell Road maisonettes development as well as the former Irish Water site adjacent to the Grand Canal. The maisonette units have reached the end of their lifespan and require either retrofitting or rebuilding. The overall site has the potential to deliver a significant quantum of residential development, in association with the regeneration/redevelopment of the maisonettes site. It is considered that given the scale of the site and the locational context that heights of up to 10 storeys could be delivered on the site subject to detailed design, conservation considerations and being in accordance with Appendix 3 of the development plan. A masterplan shall be developed for the site. The masterplan shall address, but not be limited to, the following areas: ▪ Appropriate interaction with and consideration of the Grand Canal and associated conservation area. ▪ Consideration of the industrial heritage merits of the filter beds. ▪ The potential for the Luas extension to Lucan to be incorporated through the site. ▪ The potential undergrounding or design mitigation of the existing ESB power lines on the western end of the site. ▪ Identification of locations suitable for locally higher buildings. ▪ The redevelopment of the Former Irish Water and Bluebell Road regeneration area will be informed by the Bluebell – A Framework for Renewal Plan. 6 – Naas Road Industrial Estate and Surrounding Lands These lands currently comprise of existing industrial / warehouse units bound by the Old Naas Road to the north and the Naas Road to the south. The lands also include a protected structure (RPS Ref. 5793) located on the eastern portion of the site at the junction of the Old Naas Road and Naas Road. The regeneration of these lands shall be subject to the preparation of a Masterplan to ensure an appropriate mix of uses and development strategy is set out to guide future development. The Masterplan shall have regard to the vision for the City Edge Project and any future statutory plan. Any future development should also ensure the character and setting of the protected structure is safeguarded. The provision of open space and green infrastructure along the route of the Camac shall also be safeguarded and provided for in the Masterplan.
  8. Strategic Development Regeneration Areas | Chapter 13 438 Figure 13-7: SDRA 5 Naas Road
  9. Strategic Development Regeneration Areas | Chapter 13 439 13.8 SDRA 6 – Docklands Introduction This SDRA corresponds to the Dublin Docklands area as defined by the Dublin Docklands Development Authority Act, 1997. It extends to circa 520 hectares and has significant potential for further regeneration with a number of key development sites throughout the area. These sites can make a valuable contribution to the future physical and social regeneration of this part of the city, consolidating the area as a vibrant economic, residential, cultural and amenity quarter of the city, whilst simultaneously nurturing sustainable well-integrated neighbourhoods and communities. There are two existing development frameworks that relate to the majority of this area, the North Lotts and Grand Canal Dock Planning Scheme and the Poolbeg West Planning Scheme. Remaining development sites will be informed by the guiding principles set out below. Urban Structure Given the variety of urban fabric within this SDRA, a focused approach is necessary, taking account of existing characteristics and regeneration opportunities. The objectives for urban structure within the existing SDZ areas are set out in the relevant planning schemes. These are supplemented by guidance for selected key development sites (see opportunity sites section below), located outside of the SDZ areas. These key development sites represent opportunities for the integration of new development, addressing such matters as permeability, building lines, heights and greening opportunities. This approach will ensure integration into the historic fabric of the city and create opportunities for increased interaction and mobility within the Docklands and the wider city, thus encouraging social cohesion. The SDRA benefits from immediate proximity to the NEIC SDRA, an area for which guiding principles have also been prepared and in which various urban initiatives are being implemented. Land Use and Activity Given the scale and diversity of the Docklands area, future land uses will accord with the focused requirements of the relevant SDZ Planning Scheme, or (for remaining areas) the development plan zonings. The overall approach aims to encourage mixed use development in order to achieve a balance between residential and commercial uses, with other community and cultural uses encouraged throughout. Below are separate guiding principles relating to the following thematic areas: Housing, Social & Community Infrastructure, Education and Employment and Economic Activity.
  10. Strategic Development Regeneration Areas | Chapter 13 440 Housing ▪ To promote the expansion of the Docklands’ residential population, and the successful integration of residents and communities. ▪ To ensure obligations under Part V and Dublin City Council’s housing strategy are met. ▪ To provide physical, social and amenity infrastructure in tandem with new housing. ▪ To ensure that residential developments work with the unique character of Docklands in terms of visual context, maritime location, heritage assets and community identity. ▪ To promote a mix of house types and tenures to increase the population, promote social inclusion and integration and support the existing services and businesses in the area. Social and Community Infrastructure Social sustainability is central to the regeneration strategy for the Docklands area. Dublin City Council will actively pursue a community and social development agenda, integrating and connecting the Docklands communities. A Social Infrastructure Audit of the Docklands area (SDRA) conducted in 2015 was reviewed in 2017. This helps guide social and community development in the area. The Poolbeg West Planning Scheme was adopted since this audit and contains relevant objectives for the SDZ with regard to social and community infrastructure. Key guiding principles for the SDRA under this theme are: ▪ To pro-actively engage and re-integrate the Docklands community with the full spectrum of Dublin City Council services, with particular regard to the Council’s community services which include children and young people, community development, social inclusion and interculturalism, community and voluntary, as well as public private partnerships of socio-economic interests. ▪ To support recommendations of the document ‘Dublin’s Northeast Inner City – Creating Brighter Future’ insofar as it relates to the Docklands area, and also to support the recommendations of the ‘2017 Review of Dublin Docklands Social Infrastructure Audit 2015’. ▪ To ensure co-ordination between the various statutory and non-statutory providers of social services and social programmes in the Docklands area. ▪ To ensure that social and community facilities, in particular educational facilities, are provided in tandem with residential development, having regard to the over-arching social infrastructure audit and related 2017 update. ▪ To require the provision of space in large-scale developments for social, cultural, creative and artistic purposes. Education ▪ To promote the provision of educational programmes for the local community in conjunction with third-level institutions, including the National College of Ireland, Trinity College Dublin and Technological University (TU) Dublin.

Source Dublin City Council: Dublin City Development Plan 2022–2028 – Volume 1: Written Statement (as varied by Variations Nos. 1–11) (2022–2028) · Licence the publisher's termsText read from the publisher’s PDF; tables, maps and drawings do not survive as text, and page numbers are the PDF’s (its first page is 1). Check the original before relying on a passage.

Independent planning information for Ireland — not a government website or an official planning service, and not legal advice. Contains Irish Public Sector Data licensed under CC BY 4.0. Always confirm details with the relevant local authority before relying on them.

Planning portal

Free pre-planning reportCheck a site before you apply
Map of applicationsEvery application on one map, with zoning and heritage layers
AreasCounties and towns
Planning statisticsThe national picture, and every council side by side
CommencementsWhat actually got built
Property salesWhat it sold for
Ask the planning assistantPlain-English questions