Skip to content

Development plans

Development plan · Limerick City and County Council

Limerick Development Plan 2022–2028 (as varied)

The council's development plan written statement: its strategy, policies, objectives and development standards.

Limerick City and County Council · 2022–2028 · 414 pages

Ask this document

Answers come only from the text of Limerick Development Plan 2022–2028 (as varied), each claim linked to its page. They are not advice; check the page itself.

Free, with a daily limit.
  1. Chapter 5: A Strong Economy139 5.7.12 Casual Trading Limerick City and County Council licenses casual traders to sell goods in public areas and designated trading areas. Designated areas include the street traders in the City Centre, Abbeyfeale Main Square and Newcastle West Main Square under the Casual Trading Act and the Casual Trading Bye-laws 1998. An Event Casual Trading Licence is required to sell goods at the vicinity of an event for the day or days an event is taking place and the location is at the discretion of the Gardaí and Local Authority. The success of the existing casual trading area in Limerick City at the Milk Market and Cruises Street, demonstrates that there is a demand to broaden the location and mix of casual trading within the City. Casual trading is important throughout Limerick, contributing to the local economy, generating vibrancy and vitality and attracting tourists to the settlements. Such markets can enhance the retail offer and complement the existing retail and commercial uses in the settlements. Objective ECON O14 Casual Trading Areas It is an objective of the Council to designate sites as Casual Trading Areas in suitable locations where deemed appropriate. 5.7.13 Active Street Frontages All sites in areas zoned City Centre, Town Centres, District Centres and Neighbourhood Centres may potentially be considered pivotal in creating a sense of vibrancy. The nature of the use of ground floor retail units will be required to reflect this in the design of their frontages, the use of the premises and where feasible, their hours of opening. Objective ECON O15 Active Street Frontages It is an objective of the Council to: a) Control the provision of nonretail uses at ground floor level in the principal shopping streets of Limerick City Centre, Town Centres and District Centres and within the shopping parades of mixed-use Local/ Neighbourhood Centres. b) Encourage the upgrade and refurbishment of existing retail units and the maintenance of original shopfronts, or the reinstatement of traditional shopfronts where poor replacements have been installed, discourage the use of external roller shutters, internally illuminated signs or inappropriate projecting signs. c) Prepare Shopfront Design Guidelines, within the lifetime of the Development Plan and ensure implementation of these guidelines on completion. d) Promote quality retail design which will be implemented through the development management process due to the dominant visual and use role it plays in a city, town or village streetscape in accordance with the Guidelines for Planning Authorities: Retail Planning (DoECLG, 2012) and the accompanying Retail Design Manual. e) Promote the revitalisation and reuse of vacant or derelict properties and shop units. Where viable retail cannot be sustained then alternative uses for the property/unit will be considered. 5.7.14 Night Time Economy The Council recognises the importance of the night time economy throughout Limerick, which is an important form of economic activity that occurs after 5pm and includes dining, nightlife, arts, music, theatre, entertainment, festivals, events, activities and tourist attractions that are open at night. Objective ECON O16 Night Time Economy It is an objective of the Council to support the development of the night time economy throughout Limerick and to prepare a night time strategy and ensure the implementation of this strategy on completion.
  2. LIMERICK DEVELOPMENT PLAN 2022-2028140 5.8 Enterprise and Employment 5.8.1 National and Regional Context The MASP supports Limerick City in becoming a major economic force in the Irish and international economy, a leading centre for commercial investment – both foreign direct investment and indigenous business growth, capitalising on the strengths of the city’s higher education institutions and the skills of the workforce. The City Centre will be at the heart of this economic force –attracting retail, leisure, residential, commercial, educational and cultural growth. This growth will benefit all citizens across the Limerick Shannon Metropolitan Area and wider Mid-West Region. Newcastle West has been identified by the RSES as part of the Atlantic Economic Corridor, with the potential for future economic growth and is presented as a key town in this section. Newcastle West will play a critical role in underpinning the RSES and ensuring a consolidated spread of growth beyond the cities to the subregional level and in the Limerick 2030 Plan to complement the future growth of the Limerick Metropolitan Area (in Limerick). The role of the other key towns in County Limerick is to strengthen the settlement pattern and act as the main drivers of economic development and significant providers of services within their respective sub-regions. They support the development of the Limerick Shannon Metropolitan Area and act as a base for high quality transport links to the core area of the region. 5.8.2 Strategic Employment Locations Limerick City and Suburbs (in Limerick), Mungret and Annacotty In accordance with the Regional Spatial and Economic Strategy, the Limerick Shannon Metropolitan Area has capacity for economic growth of a significant scale at Strategic Employment Locations as briefly outlined in this section. The Local Authority is committed to the delivery of a vibrant and compact community where people live close to where they work in Limerick City Centre, which must be prioritised for investment. The strategic employment areas identified, support the objectives for compact growth of the settlement of Limerick City and Suburbs (in Limerick), Mungret and Annacotty. These employment areas have potential for expansion and intensification and are linked to a critical mass of skilled workers, served by key infrastructure (water, wastewater, electricity, broadband etc.), with the potential for public and sustainable forms of transport to the City Centre. With an increase of critical mass in the City and Suburbs (in Limerick), Mungret and Annacotty, it is envisaged that population and jobs growth will occur in a sustainable manner focusing on clusters and smart specialisation. Limerick City Centre itself is a key strategic employment location, with significant potential for expansion of existing employment in the retail, commercial services, culture and tourism sectors. The maintenance of the city’s existing working port and associated industries will also be supported in the Plan. These lands represent an invaluable asset for the future maritime related economic development of the City Centre. There is also potential for significant development of underutilised Section 2: Enterprise and Employment
  3. Chapter 5: A Strong Economy141 City Centre lands within the Docklands area for a major employment and residential quarter. Office based employment is vital for the city’s economic development. The Local Authority acknowledges that the availability of choice to cater for the various needs of different types of businesses is essential. In this respect, additional lands are required for office space over and above that provided at Gardens International and proposed in the Opera Square and Cleeves Riverside Quarter developments. It is therefore acknowledged that additional locations may become available and the Local Authority recognises the need to be flexible to accommodate employment opportunities and the aims of revitalising and regenerating Limerick City, for higher density living and higher value jobs during the lifetime of the Plan. The hospitals at the University Hospital Limerick, the Maternity Hospital and St. John’s cater for a regional population of up to half a million people and provide substantial direct and indirect employment for the Mid-West Region. Proposals for the replacement of the standalone Limerick University Maternity Hospital are also underway, in accordance with the Project Ireland 2040 National Development Plan 2021-2030. Elsewhere, Raheen Business Park, the National Technology Park and the proposed Northside Business Campus are identified as Strategic Employment Locations under the MASP. These strategic locations offer the capacity to cater for investment that require greenfield or brownfield sites, access to an international airport and third level graduates. The Local Authority will continue to support investment in and build on the success of the High Tech/Manufacturing zoned lands, which have contributed significantly to the economic growth of Limerick. IDA Ireland’s Raheen Business Park serves a number of large multinational companies including Regeneron Pharmaceuticals, Analog Devices, Dell, Banta and Stryker Corp. The National Techonology Park (NTP) at Plassey, which first opened in 1984 as Ireland’s first Science and Technology Park, is home to 80 organisations including Cook Medical, Vistakon and Gilt. As there is limited undeveloped land available at these locations, the Plan proposes additional zoned land, for high tech/manufacturing uses, adjoining the existing Raheen Industrial Estate. The Local Authority envisages that the delivery of the Northside Business Campus will be developed on the basis of strong links between and synergies with higher education institutes and various employment agencies. This Business Campus has significant potential for the creation of employment opportunities for the residents of the Regeneration Areas of Moyross, King’s Island and the wider community and has the potential to make a significant contribution to the economic development of the north side of Limerick City. The Higher Education Institutes of University of Limerick (UL), Technological University of the Shannon (TUS), Mary Immaculate College (MIC) and the Limerick Clare Education and Training Board are significant employers in Limerick and have capacity for expansion and further employment creation (Refer to Chapter 10: Sustainable Communities and Social Infrastructure). TUS has a new campus at Coonagh with state of the art teaching, learning and research facilities and will enable expansion of the places on TUS’s engineering courses. UL has purchased the former Dunnes Stores site adjacent to Sarsfield Bridge and has plans for the development of a City Campus, comprising education and student accommodation facilities. The development of a City Campus will contribute significantly to the revitalisation of the economic and residential core of the City Centre.
  4. LIMERICK DEVELOPMENT PLAN 2022-2028142 The Local Authority supports the on-going operations of the strategic employment zones identified in the MASP, the Plan and any sustainable economic development opportunities on appropriately zoned lands. In this regard, the capacity for employment growth is acknowledged and lands have been zoned to cater for existing and new industry and enterprise and employment related uses. Bus, pedestrian and cycle linkages will connect many of the potential employment areas to the City Centre as identified in the Draft Limerick Shannon Metropolitan Area Transport Strategy. The Local Authority will work with local and national employment agencies, Departments and private investors to promote and facilitate continued investment in Limerick City and Suburbs (in Limerick), Mungret and Annacotty. A high standard of design and layout will be required for new industrial and enterprise and employment type developments, including attractive and safe pedestrian and cycle friendly environments, whilst ensuring the functioning of business and industrial locations. All proposed developments will be subject to compliance with all relevant planning criteria set out in the Development Management Standards of this Plan and Section 28 Guidance. Objective ECON O17 Strategic Employment Locations City and Suburbs (in Limerick), Mungret and Annacotty It is an objective of the Council to: a) Promote, facilitate and enable a diverse range of employment opportunities by facilitating appropriate development, improvement and expansion of enterprise and industry on appropriately zoned lands, accessible by public and sustainable modes of transport, subject to compliance with all relevant Development Management Standards and Section 28 Guidance at Strategic Employment Locations and other appropriately zoned locations in a sustainable manner. b) Facilitate and support Limerick City Centre, University Hospital Limerick, Raheen Business Park, the National Technology Park, Higher Education Institutes, Public Hospitals, Dock Road, Northside Business Campus, Opera Centre and Cleeves Site as Strategic Employment Locations, identified in accordance with the Limerick Shannon Metropolitan Area Strategic Plan. Objective ECON O18 Specific Site Requirements It is an objective of the Council to: a) Ensure that a comprehensive framework plan shall be prepared and agreed with the Planning Authority in advance of development on the ‘High Tech/Manufacturing’ zoned lands to the west of Raheen Business Park. The framework should clearly set out the key infrastructure requirements for the site and identify responsibility and the timeframe for delivery of such infrastructure. The Framework Plan shall be subject to the following: – Cognisance of the residential amenities of the properties to the north and western side of the site and the adjacent agricultural land; – Access to the ‘High Tech/ Manufacturing’ zoned land to the west of the R510 will be limited to the existing roundabout to the east of the site. Limited access may be provided off the Patrickswell Road; – Applications for development in the low-lying area in the southern section of this zone shall have regard to the attenuation infrastructure and shall include a Site-Specific Flood Risk Assessment, including proposals to mitigate and control the level of run off and attenuation; b) Ensure the provision of a minimum 20m landscaped buffer zone between proposed development and adjoining development/lands in Annacotty Business Park, Northside Business Park and the ‘High Tech/ Manufacturing’ zoned lands to the
  5. Chapter 5: A Strong Economy143 west of Raheen Business Park. c) Require the preparation of a Masterplan for the Enterprise and Employment zoning at the former racecourse lands at Greenpark. The Masterplan shall include a conceptual layout, infrastructure and phasing details. d) Ensure all development proposals undertake an appropriate level of transport assessment, including an assessment of the cumulative impact of development, to ensure planned development can be accommodated complementary to safeguarding the strategic function of the national road network and associated junctions. 5.8.3 Strategic Employment Locations County Limerick Sites for enterprise and employment are zoned in the Local Area Plans for the various towns but because of the strategic nature of Annacotty Business Park, the Askeaton Business Park (which is identified as one of the strategic sites in the Strategic Integrated Framework Plan for the Shannon Estuary (SIFP)) and Foynes Port, suitable sites are zoned for enterprise use in these locations in the Plan. Objective ECON O19 Employment Locations County Limerick It is an objective of the Council to: a) Safeguard Askeaton Business Park for the accommodation of large establishments of regional importance. The application of appropriate mitigation measures for this zone as detailed in Strategic Integrated Framework Plan for the Shannon Estuary (SIFP), Volume 2, Appendices C and D, the Environmental Report and Natura Impact Report which accompanied the SIFP, will apply for proposed developments within this zone. An overall masterplan for the site outlining the proposed infrastructural provision, including the provision of Sustainable Urban Drainage Systems (SuDS), shall be provided. Access to the development location site at Askeaton should be facilitated from the non-national road network. b) Facilitate the sustainable development of Annacotty Business Park, of a scale, phasing and character compatible with surrounding land uses and capacity of the road network. All buildings and associated services shall be contained within this area and a buffer zone of 20m in width shall abutt the undeveloped northwestern portion of the site and shall be suitably landscaped, to screen development from dwellings on the Clyduff Road. An appropriate buffer zone must be considered for any future planning application on these lands in the interests of protecting the residential amenity of the area. Objective ECON O20 Location of Industry or Enterprise in Brownfield Sites It is an objective of the Council to facilitate industry or enterprises in brownfield sites with previously established industrial or commercial use, or derelict sites in a commercial, industrial or mixed-use area, subject to the following considerations: a) The use should be appropriate to the scale and context of the site, taking into account traffic and other impacts on local infrastructure and neighbouring land uses and amenities; b) Structures of conservation merit should be re-used and not replaced; c) The works are necessary for the proposed economic activity or activities.
  6. LIMERICK DEVELOPMENT PLAN 2022-2028144 Map 5.1 Askeaton Business Park Map 5.2 Annacotty Business Park
  7. Chapter 5: A Strong Economy145 5.8.4 Knowledge Economy It is crucial that Limerick is positioned as a competitive knowledge economy which is recognised for its skills base and hightech sector. The knowledge economy is powered by ideas and intellectual capital and is driven by high tech companies. The Limerick 2030 Economic and Spatial Plan highlights that the knowledge economy is central to Limerick’s long-term growth and prosperity. Key factors that drive the knowledge economy include an educated and skilled population, technological infrastructure, foreign direct investment, an environment that encourages technology and entrepreneurship and collaborative public and private research organisations. Research and Development (R&D) is a crucial component of sustainable employment. The third level institutions in Limerick play a critical role in supporting research and development through their research programmes. There are also a number of organisations throughout Limerick City and County that are involved in innovation and R&D. Limerick is an UNESCO Learning City and has excellent potential to create a Learning Region which is promoted by the RSES. Encouraging collaboration between higher education institutes, the Regional Skills Fora and the Educational and Training Boards, presents the potential to develop skills and knowledge in areas most exposed to technological disruption. By supporting community and education providers, Limerick City and County can ensure that knowledge and skills are spread to all citizens to help address skills shortages and lifelong learning challenges. Objective ECON O21 Knowledge Economy It is an objective of the Council to promote the development of knowledgebased enterprise. Objective ECON O22 Learning Region It is an objective of the Council to support the further development of Limerick, as an inclusive Learning City and County and to work with relevant stakeholders as appropriate. 5.8.5 Education and Skills The development of human capital is central to Limerick’s economic and social development. A well-educated and skilled workforce is a valuable human resource, which will provide an attraction for inward investment and will promote Limerick as a leader in the knowledge economy. With most city regions now becoming more knowledge intensive, the challenge for Limerick is to ensure that it maintains its position as a front-runner location in the competitive knowledge-based economy. The continuing presence and growth of excellent Further and Higher Education Institutes and research and development nodes in Limerick, will be critical to ensuring success. Objective ECON O23 Education and Skills It is an objective of the Council to: a) Sustain the existing high levels of educational attainment and skilled workforce, to encourage employment generation to maintain this resource within Limerick and to promote the availability of education opportunities to all residents in Limerick City and County. b) Support the continued collaborative work undertaken by the Mid-West Regional Enterprise Plan (REP) and the Mid-West Regional Skills Forum in employment generation and fostering of the knowledge-based economy to the Limerick Shannon Metropolitan Area and Mid-West. Objective ECON O24 Further and Higher Education Institutions It is an objective of the Council to: a) Work in conjunction with Further and Higher Education Institutions in the creation and fostering of enterprise through research, innovation and development activities and the commercialisation of such activities. b) Support the development of sites where high-tech and high potential start-ups can thrive, in conjunction with Institutes of Technology and Universities, to create collaborative and innovative growth.
  8. LIMERICK DEVELOPMENT PLAN 2022-2028146 5.8.6 Clustering and Innovation Cultural and creative industries, as a subset of the knowledge economy, are an increasingly important area of economic growth and employment creation. They have been defined as industries which have their origin in individual creativity, skill and talent and which have a potential for wealth and job creation through the generation and exploitation of intellectual property - including areas such as advertising, software, publishing, architecture, music and the visual and performing arts, film, video and photography. There is potential to develop further clusters of economic activity across various sectors in Limerick. The EY-DKM Limerick Economic Profiling Report (2018) highlights that Limerick does not have the same level of clustering of economic activity relative to other cities. The report states that there is potential for further business clustering in Limerick, including potential for Troy Film Studios to spur clusters in film/television and trade sectors in Limerick. Green energy technologies have also been identified as another area of clustering with Limerick Docklands being a test bed for tidal energy technologies. The Limerick 2030 Economic and Spatial Plan states that there is an opportunity to create a City Centre employment cluster, comprising related business sectors for which a City Centre environment would be advantageous, this would include creative businesses. The Council will support the creation of a university/higher education facility or joint UL/TUS/MIC teaching facility in a prominent City Centre location. The economic impact of such a facility could be enhanced through the co-location of associated administrative functions and employment and by locating student accommodation in the City Centre. Objective ECON O25 Clustering and Innovation It is an objective of the Council to encourage and facilitate the sustainable development and clustering of knowledgebased and high tech industries/businesses at appropriate locations in Limerick. 5.8.7 Tackling Unemployment The Council recognises that areas of higher unemployment, specifically among the younger population, do not always benefit from a focus on Further and Higher Education, jobs in the IT sector or enterprise and would benefit more by the provision of the above types of training and skill development as well as traditional forms of employment via the public sector. The Council will support and facilitate a policy which will seek to employ skilled trades people to facilitate the employment of apprentices. Objective ECON O26 Tackling Unemployment It is an objective of the Council to support the work undertaken by the Education and Training Boards, in relation to courses provided under SOLAS and the establishment of Community Training Centres, Local Training Initiatives and Specialist Training Provision in Limerick. 5.8.8 Social Enterprise A social enterprise is an enterprise where the main objective is to achieve a social impact. Social enterprises can have a positive social impact on the people working and living in their communities through fostering inclusive growth, shared prosperity, social inclusion, training and job creation. Objective ECON O27 Social Enterprise It is an objective of the Council to promote the development of social enterprise in Limerick.
  9. Chapter 5: A Strong Economy147 5.8.9 Smart City Limerick City and County Council has an objective to create a sustainable Smart Limerick City and communities, through the use of digital technologies and embracing new work practices to empower communities, create better services, accelerates sustainable social and economic growth and to improve quality of life for all. In order for this to be achieved, it requires collaboration across communities and agencies. It has the potential to drive major societal and economic benefits by managing population growth, mitigating against urbanisation and increasing competitiveness. The Council recognises that Limerick needs to ensure it is a frontrunner in the Smart Cities in Ireland and Europe. The Local Authority has been very proactive in recent years in the development of a Smart Economy in Limerick. An example of a proposed initiative to develop a smart economy in Limerick is the proposed Atlantic Green Digital Basin, which aims to accelerate sustainable economic growth and the utilisation of new digital technologies. It will develop a new economic corridor - a unique, internationally scaled innovation hub powered by green energy. The Council recognises the potential societal benefits that can be attained through technological advancements and will continue to support the Smart Limerick initiative. Limerick is also transforming itself into Ireland’s first Digital City with the integration of a number of public services, the creation of smart homes, smart buildings, energy districts and smart neighbourhoods. Objective ECON O28 Smart City It is an objective of the Council to support the Smart Limerick Initiative, which will allow greater flexibility for Limerick to work with universities, citizens, entrepreneurs and companies, to coinnovate, test and deploy new urban solutions. 5.8.10 Office Development The main focus for office uses in the City has traditionally been the City Centre Commercial Core Area, where the mix of retail office and general office activities support each other and are essential to the health and vibrancy of the City Centre. As part of the Limerick 2030 Plan, the Limerick Twenty Thirty company has a number of key projects which will facilitate office development in Limerick including the Opera Site and Cleeves Riverside Campus. It is necessary to have a range of locations for offices to provide choice and to cater for the varying needs of different types of businesses. The Plan recognises the importance of retaining and facilitating additional office accommodation as a key land use, that contributes to the vibrancy and vitality of centres. The Council will support the development of office accommodation in the City Centre, District Centres and Town Centres subject to maintaining a balanced mix of uses in line with their multi-functional role. Applications for office development will be assessed in accordance with relevant Development Management Standards and on the size of the proposal in comparison to the size of the centre, the need to ensure a variety of uses in the centre to fully serve its catchment area and the capacity of the centre to absorb any such proposal. These locations should be well served by existing and/or proposed public transport facilities in line with the principles of sustainable development. The Council will encourage the conversion of existing office stock, where appropriate, to be more receptive to the changing needs of employers and employees. In this regard, the establishment of high specification ‘fourth generation’ office accommodation will be especially encouraged. Furthermore, in recognition of changing workplace practices, the Council will support proposals for co-working office accommodation in accordance with the standards set out above and facilitate and promote the uptake of remote working and the development of hub facilities in the City and County.
  10. LIMERICK DEVELOPMENT PLAN 2022-2028148 Objective ECON O29 Office Development It is an objective of the Council to facilitate significant additional office development in employment and commercial centres. The appropriate locations for office development would generally be on appropriately zoned lands in employment zoned areas, Limerick City Centre, Town Centres and District Centres in accordance with the zoning matrix refer to Chapter 12: Land Use Zoning Strategy. 5.8.11 Light Industrial and Related Uses There continues to be a need for a diverse range of employment opportunities in Limerick City and County. Light industrial and related uses are required to provide a diverse range of employment opportunities across Limerick. The general strategy is to retain existing light industrial areas, apart from those areas specifically identified for alternative uses or renewal. Offices or office-based employment will not be permitted in industrial areas, unless they are ancillary to the primary industrial uses. Limerick has a history in advanced manufacturing, particularly manufacturing in the ICT sector. The Limerick 2030 Economic and Spatial Plan highlights that building on the existing skills base and collaboration with research and government is important for advancing the sector and for Limerick to become a leader in ICT innovation, design and production. Innovate Limerick, in partnership with Limerick City and County Council and key industry partners, has developed a proposal for a National Advanced Manufacturing Centre, Limerick and the Mid-West, which aims to be a catalyst for the development of the Irish manufacturing sector. The RSES supports enterprise transitions to Industry 4.0 (the trend of automation and data exchange in manufacturing technologies) and equipping people with the necessary skills to adjust and adapt to technology changes and disruptions, while creating an enterprise ecosystem that promotes innovation and entrepreneurship in emerging opportunities. This will improve competitiveness and resilience, which are in turn underpinned by skills development, innovation capacity, trade and competition and infrastructure investment. Objective ECON O30 Light Industrial and Related Uses It is an objective of the Council to: a) Maintain an adequate supply of light industrial space and employment uses in order to help ensure a diverse range of employment opportunities; b) Ensure the sustainable development of manufacturing industries on lands zoned for such purposes subject to normal planning, development and environmental controls and the assessment of the potential impact on such development on adjacent land uses. 5.8.12 Data Centres Data Centres have become increasingly important for the economic growth of national and regional economies. The Government Statement on The Role of Data Centres in Ireland’s Enterprise Strategy (2018) highlights the importance of Data Centres in terms of job creation and significant potential for economic benefit, as they provide a range of services for other sectors. The Data Centre sector is proving to be extremely resilient and the current Covid-19 pandemic has reinforced the importance of Data Centres, as they provide the background infrastructure across a range of essential sectors, including manufacturing, healthcare, media and entertainment, financial services, education and retail, all of which are imperative for the future economic growth of Limerick. The Data Centre Report Europe Q2 2020 states, that as a result of Covid-19, the role of the Data Centre industry has gained greater recognition in terms of keeping people connected and facilitating business continuity. The report highlights that the demand for Data Centres will continue to increase.

Source Limerick City and County Council: Limerick Development Plan 2022–2028 (as varied) (2022–2028) · Licence the publisher's termsText read from the publisher’s PDF; tables, maps and drawings do not survive as text, and page numbers are the PDF’s (its first page is 1). Check the original before relying on a passage.

Independent planning information for Ireland — not a government website or an official planning service, and not legal advice. Contains Irish Public Sector Data licensed under CC BY 4.0. Always confirm details with the relevant local authority before relying on them.

Planning portal

Free pre-planning reportCheck a site before you apply
Map of applicationsEvery application on one map, with zoning and heritage layers
AreasCounties and towns
Planning statisticsThe national picture, and every council side by side
CommencementsWhat actually got built
Property salesWhat it sold for
Ask the planning assistantPlain-English questions