Offaly County Development Plan 2021–2027 (as varied) — Appendix 2: Settlement Capacity Audit

One part of the council's development plan written statement, which the council publishes in parts.

Offaly County Council · 2021–2027 · 63 pages

Ask this document

Answers come only from the text of Offaly County Development Plan 2021–2027 (as varied) — Appendix 2: Settlement Capacity Audit, each claim linked to its page. They are not advice; check the page itself.

Free, with a daily limit.
  1. Offaly County Development Plan 2021-2027 Appendix 2 Settlement Capacity Audit Offaly County Development Plan 2021-2027 Page 475 as per Chapter 8 of Volume 1 of this Plan titled Sustainable Transport Strategy. The Roads Section has estimated costs of approximately €82,000,000 for projects identified in the Volume 2 Settlement Plans, which does not include annual programme of works but rather projects. Roads related infrastructure listed in the Volume 2 Settlement Plans has estimated costs of approximately €82,000,000, which is included within the figure of €204,000,000 above. The cost per settlement would include larger projects and smaller footpaths and cycleway measures that will be addressed through the Town and Village Renewal Scheme. It should be noted that the infrastructure works included in this Plan are not exhaustive and there may be additional works required when a more detailed analysis of an area and land / site is carried out as part of a planning application. The level of works required will also be dependent on the nature and scale of the development on the subject lands / site. This will be assessed and reviewed in greater detail at the planning application stage of any development proposals on the subject lands / sites.
  2. Offaly County Development Plan 2021-2027 Appendix 2 Settlement Capacity Audit Offaly County Development Plan 2021-2027 Page 476 Table A2.7 Traffic Light Matrix for use in SCA Tables Site Evaluation Criteria Green (Infrastructure/Services are Readily Available) Amber (Infrastructure/Services are not currently available, but investment is likely to be delivered within the plan period) Red (Provision of Infrastructure/Services unlikely to be realised during the plan period) Roads The site has direct access to or can connect to an existing road network. (This includes any road access that will be provided by a development which is currently under construction adjacent to the site). Road access is likely to be delivered within the plan period. Further investment may be required, including potential access through third-party lands (existing/under construction/planned housing estate but not commenced). Road access is unlikely to be developed during the plan period. E.g. the site is landlocked by land that is unlikely to provide access (different landowner with no plans for development). Active Travel (Footpaths and/or Cycle Lanes) The site has direct access to pedestrian (and where possible cycle) infrastructure on or adjoining the site. Active travel infrastructure is likely to be provided within the plan period. Further investment will be required to connect the site to the existing network. Active travel infrastructure is unlikely to be developed during the plan period. Public Lighting The site has public lighting either on, adjoining the site, or on the opposite side of the road. Public lighting is likely to be delivered within the plan period. Further investment will be required to connect the site to existing public lighting infrastructure. The site has no public lighting on or adjoining the site and is unlikely to be developed during the plan period. Water Supply The site has direct access to the water supply network/infrastructure and there is sufficient capacity. Access to the water supply network is likely to be provided within the plan period. Additional investment will be required to develop the necessary water supply infrastructure. The site is unlikely to be serviced or serviceable with water supply during the plan period. Wastewater The site has direct access to the wastewater network/infrastructure and there is sufficient capacity. Access to the wastewater network is likely to be provided within the plan period. Further investment and investigation will be required to develop suitable wastewater infrastructure for the site (by UE or developer-led). The site is unlikely to be serviced or serviceable with wastewater during the plan period. Social Infrastructure The site is within 800m of a community facility. The site is within 801m and 1200m of a community facility. The site is over 1200m from a community facility. Compact Growth The site is within 1200m of the town centre. The site is outside 1200m of the town centre. Not Applicable.
  3. Offaly County Development Plan 2021-2027 Appendix 2 Settlement Capacity Audit Offaly County Development Plan 2021-2027 Page 477 Table A2.8 SCA Table for settlements with population >1,500 (5 No. higher tier settlements) SETTLEMENT: TULLAMORE Site Area (ha) Existing Zoning Proposed Zoning Roads Active Travel Public Lighting Water Supply Wastewater Compact Growth Social Infrastructure Tier Designation 1 2.39 Strategic Residential Reserve New Residential Tier 1 2 4.00 Strategic Residential Reserve New Residential Tier 1 3 11.15 Strategic Residential Reserve New Residential Tier 2 4 8.80 Business or Technology Park New Residential Tier 1 5 4.59 Enterprise and Employment New Residential Tier 1 6 15.8 Partly Strategic Residential Reserve and Enterprise and Employment New Residential Tier 1 7 2.87 Enterprise and Employment New Residential - Tier 2 8 6.54 Strategic Residential Reserve New Residential Tier 2 9 3.35 Enterprise and Employment Existing Residential Tier 1 10 17.01 Strategic Residential Reserve Strategic Residential Reserve Tier 1
  4. Offaly County Development Plan 2021-2027 Appendix 2 Settlement Capacity Audit Offaly County Development Plan 2021-2027 Page 478 Site Area (ha) Existing Zoning Proposed Zoning Roads Active Travel Public Lighting Water Supply Wastewater Compact Growth Social Infrastructure Tier Designation 11 5.72 New Residential New Residential Tier 1 12 1.75 New Residential New Residential Tier 1 13 4.19 Strategic Residential Reserve Strategic Residential Reserve Tier 1 14 27.98 Strategic Residential Reserve Strategic Residential Reserve Tier 2 15 17.73 Strategic Residential Reserve Strategic Residential Reserve Tier 2 16 21.12 Strategic Residential Reserve Strategic Residential Reserve Tier 2 17 4.05 Strategic Residential Reserve Strategic Residential Reserve Tier 2 18 42.44 Strategic Residential Reserve Strategic Residential Reserve Tier 1 19 1.28 New Residential New Residential Tier 1 20 19.72 Strategic Residential Reserve Strategic Residential Reserve Tier 1 21 9.13 Strategic Residential Reserve Strategic Residential Reserve Tier 1 22 11.25 Strategic Residential Reserve Strategic Residential Reserve Tier 1 23 1.44 Strategic Residential Reserve Strategic Residential Reserve Tier 1 Note: Variation No. 1 of the CDP proposes to zone lands in site No.1-8 to ‘New Residential’ and Site No.9 to ‘Existing Residential’. The remaining site No.10-23 of this SCA are to remain with no proposed zoning changes.
  5. Offaly County Development Plan 2021-2027 Appendix 2 Settlement Capacity Audit Offaly County Development Plan 2021-2027 Page 479 SETTLEMENT: BIRR and CRINKLE Site Area (ha) Existing Zoning Proposed Zoning Roads Active Travel Public Lighting Water Supply Wastewater Compact Growth Social Infrastructure Tier Designation 1 1.23 Strategic Residential Reserve New Residential Tier 1 2 4.22 Strategic Residential Reserve New Residential Tier 1 3 2.12 Strategic Residential Reserve New Residential Tier 1 4 1.81 Strategic Residential Reserve New Residential Tier 2 5 1.76 Strategic Residential Reserve New Residential Tier 1 6 2.84 Strategic Residential Reserve New Residential Tier 1 7 4.68 Unzoned New Residential Tier 1 8 2.44 Strategic Residential Reserve New Residential Tier 1
  6. Offaly County Development Plan 2021-2027 Appendix 2 Settlement Capacity Audit Offaly County Development Plan 2021-2027 Page 480 Site Area (ha) Existing Zoning Proposed Zoning Roads Active Travel Public Lighting Water Supply Wastewater Compact Growth Social Infrastructure Tier Designation 9 0.81 Strategic Residential Reserve New Residential Tier 1 10 1.33 Strategic Residential Reserve Open Space, Amenity and Recreation Tier 1 11 1.7 Strategic Residential Reserve Strategic Residential Reserve Tier 2 12 2.17 New Residential New Residential Tier 2 13 1.3 New Residential New Residential Tier 1 14 0.92 New Residential New Residential Tier 1 15 1.49 New Residential New Residential Tier 1 16 3.38 Strategic Residential Reserve Strategic Residential Reserve Tier 1 Note: Variation No. 1 of the CDP proposes to zone lands in site No.1-9 to ‘New Residential’ and Site No.10 to ‘Open Space, Amenity and Recreation’. The remaining site No.11-16 of this SCA are to remain with no proposed zoning changes.
  7. Offaly County Development Plan 2021-2027 Appendix 2 Settlement Capacity Audit Offaly County Development Plan 2021-2027 Page 481 SETTLEMENT: EDENDERRY Site Area (ha) Existing Zoning Proposed Zoning Roads Active Travel Public Lighting Water Supply Wastewater Compact Growth Social Infrastructure Tier Designation 1 6.57 Strategic Residential Reserve New Residential Tier 1 2 1.00 New Residential New Residential Tier 2 3 2.79 New Residential New Residential Tier 1 4 7.26 New Residential New Residential Tier 1 5 1.04 New Residential New Residential Tier 2 6 3.39 New Residential New Residential Tier 1 Note: Variation No. 1 of the CDP proposes to zone lands in site No.1 from ‘Strategic Residential Reserve’. The remaining sites No.2- 6 of this SCA are to remain with no proposed zoning changes.
  8. Offaly County Development Plan 2021-2027 Appendix 2 Settlement Capacity Audit Offaly County Development Plan 2021-2027 Page 482 SETTLEMENT: BANAGHER Site Area (ha) Existing Zoning Proposed Zoning Roads Active Travel Public Lighting Water Supply Wastewater Compact Growth Social Infrastructure Tier Designation 1 4.89 Unzoned New Residential Tier 1 2 3.15 Enterprise and Employment New Residential Tier 1 3 2.67 New Residential New Residential Tier 1 4 1.08 New Residential New Residential Tier 2 5 0.78 New Residential New Residential Tier 1 Note: Variation No. 1 of the CDP proposes to zone lands in site No.1-2 to ‘New Residential’. The remaining sites No. 3-5 of this SCA are to remain with no proposed zoning changes.
  9. Offaly County Development Plan 2021-2027 Appendix 2 Settlement Capacity Audit Offaly County Development Plan 2021-2027 Page 483 SETTLEMENT: CLARA Site Area (ha) Existing Zoning Proposed Zoning Roads Active Travel Public Lighting Water Supply Wastewater Compact Growth Social Infrastructure Tier Designation 1 2.61 Strategic Residential Reserve New Residential Tier 1 2 2.15 Strategic Residential Reserve and Unzoned New Residential Tier 1 3 1.31 Strategic Residential Reserve New Residential Tier 2 4 5.18 Unzoned New Residential Tier 1 5 2.10 Unzoned New Residential Tier 1 6 1.49 New Residential New Residential Tier 1 7 1.58 New Residential New Residential Tier 1 8 1.06 New Residential New Residential Tier 2 Note: Variation No. 1 of the CDP proposes to zone lands in site No.1-5 to ‘New Residential’. The remaining sites No. 6-8 of this SCA are to remain with no proposed zoning changes.
  10. Offaly County Development Plan 2021-2027 Appendix 2 Settlement Capacity Audit Offaly County Development Plan 2021-2027 Page 484 Table A2.9 SCA Table for settlements with population <1,500 (12 No. Smaller Town and Village Settlements) SETTLEMENT: FERBANE Site Area (ha) Existing Zoning Proposed Zoning Roads Active Travel Public Lighting Water Supply Wastewater Tier Designation 1 0.92 Strategic Residential Reserve New Residential and Existing Residential Tier 1 2 0.71 Strategic Residential Reserve New Residential Tier 1 3 3.98 Unzoned New Residential Tier 1 4 0.25 Unzoned New Residential Tier 1 5 0.44 Strategic Residential Reserve Strategic Residential Reserve Tier 2 6 0.24 New Residential New Residential Tier 1 7 0.85 New Residential New Residential Tier 1 8 0.54 New Residential New Residential Tier 1 9 1.49 New Residential New Residential Tier 2 Note: Variation No. 1 of the CDP proposes to zone lands in site No.1-4 to ‘New Residential’ and ‘Existing Residential’. The remaining site No. 5-9 of this SCA are to remain with no proposed zoning changes.

Source Offaly County Council: Offaly County Development Plan 2021–2027 (as varied) — Appendix 2: Settlement Capacity Audit (2021–2027) · Licence the publisher's termsText read from the publisher’s PDF; tables, maps and drawings do not survive as text, and page numbers are the PDF’s (its first page is 1). Check the original before relying on a passage.

Independent planning information for Ireland — not a government website or an official planning service, and not legal advice. Contains Irish Public Sector Data licensed under CC BY 4.0. Always confirm details with the relevant local authority before relying on them.

Planning portal

Free pre-planning reportCheck a site before you apply
Map of applicationsEvery application on one map, with zoning and heritage layers
AreasCounties and towns
Planning statisticsThe national picture, and every council side by side
CommencementsWhat actually got built
Property salesWhat it sold for
Ask the planning assistantPlain-English questions