GrantedEnergyDecided 8 May 2019

Monksland, Athlone, Co. Roscommon

Ten-year permission for a 100MW gas-fired power plant and associated infrastructure.

18256 · Roscommon County Council · Lodged 30 May 2018

Reference
18256
Authority
Roscommon County Council
Register status
Decided
Type
PERMISSION
Received
30 May 2018

Summary

AI-generated

The development consists of a 100MW gas-fired power plant. It includes an engine hall with 10 gas engines and two 27m stacks, an electrical substation, a gas AGI, storage tanks, and an access road.

Energypower plantgassubstationinfrastructure

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Ten year planning permission for development consisting of the construction of a 100mw gas fired power plant with associated balance of plant, equipment and buildings including an engine hall building with height of 17.20m (comprising 10 no. Gas engines; ventilation units, cooling radiator units and 2 no. 27m stacks), an electrical annex building (12.95m height), a 110kv electrical substation and control building (5.8m height) a gas agi including an instrument house (4.9m height), an administration building of 6.1m height, a workshop/storeroom of 6.45m height, a tank farm (consisting of a diesel oil storage tank (1500m3) , urea storage tank (160m3), waste oil tank (50m3), pilot oil tank (2m3), lube oil storage tank (16m3), and a lube oil run-down tank (16m3) an engineering building of 6.45m height, a raw/fire water storage tank (1200m3), treated water tank (15m3), cooling water run-down tank (12m3), an underground surface water attenuation tank (348m3) and an underground wastewater holding tank (20m3). The development will also include an access road onto an existing roscommon county council owned road with access via the monksland industrial estate; 13 no. Car parking spaces; footpath; landscaping, 3m paladin security fence; and all other associated site development works including surface water and foul drainage required to facilitate the development. (the proposed power plant is a project type that requires an industrial emissions licence from the environmental protection agency in accordance with the requirements of the first schedule to the environmental protection agency act 1992) at

Key dates

Timeline

  1. Application received30 May 2018
  2. Further information requested23 July 2018
  3. Further information received27 March 2019
  4. Decision due8 May 2019
  5. Decision issued8 May 2019
  6. Grant issued14 June 2019
  7. Permission expiry13 June 2029

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.