GrantedEnergyDecided 18 August 2022

Monksland, Athlone, Co. Roscommon

Revisions to a permitted 102MW gas-fired power plant in Monksland, Athlone.

22234 · Roscommon County Council · Lodged 17 May 2022

Reference
22234
Authority
Roscommon County Council
Register status
Decided
Type
PERMISSION
Received
17 May 2022

Summary

AI-generated

The applicant is seeking revisions to a previously permitted gas-fired power plant. The changes include adjusting the electrical output to 102MW and modifying associated buildings, including an engine hall, exhaust stack, and storage tanks.

Energypower plantgasinfrastructure

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission for development consisting of revisions and alterations of the permitted development of a gas fired power plant under planning register reference pd/18/256. The revisions and alterations relate to the design of the gas fired power plant and will include a change to the electrical output of the power plant to 102mw with associated balance of plant, equipment and buildings including: an engine hall building with a height of 16.9m, (comprising 5 no. Gas engines and ancillary infrastructure), an electrical annex building with a height of 18.7m; a workshop building with a height of 5.1m; an administrative building with a height of 6.1m; a tank farm building with a height of 5.7m; a security hut with a height of 3.3m; an exhaust stack with a height of 28.0m; a gas agi including an instrument kiosk with a height of 4.9m and an analyser kiosk with a height of 2.9m; 2 no. Storage containers, each 2.6m in height, radiator coolers with height of 8.5m; tanks including 2 x diesel oil storage tanks (volume of 1860m3 combined); scr urea tank (73m3) ; lube oil storage tank (3m3); lube oil maintenance tank (26m3); pilot oil tank (26m3); fire water storage tank (563m3); waste oil effluent tank (16m3); underground surface water attenuation tank (590m3). The revised proposal will involve a revised red line site boundary to provide for drainage and other works within the adjacent roadway. The development optimises the same access permitted under pd/18/256 and includes 12 no. Number parking spaces, footpaths, landscaping; fencing and all other associated site development plant and equipment and other works including surface water and foul wastewater drainage, all on site 1.8 hectares in size (a natura impact statement(nis) is submitted as part of the planning application) ( permission is sought for a period of 10 years) at

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 18 April 2023.

Notified floor area: 2,465

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received17 May 2022
  2. Further information requested11 July 2022
  3. Further information received22 July 2022
  4. Decision due18 August 2022
  5. Decision issued18 August 2022
  6. Grant issued22 September 2022
  7. Permission expiry21 September 2027

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.