Planning Permission Ireland
GrantedCommercialDecided 24 January 2023

Barrymore Townland, Hodson Bay, Kiltoom Athlone

Development of a waterpark facility with landside marquees and inflatable waterside installations.

2262 · Roscommon County Council · Lodged 9 February 2022

Reference
2262
Authority
Roscommon County Council
Register status
Decided
Type
PERMISSION
Received
9 February 2022

Summary

AI-generated

The project consists of recreational facilities including landside marquees for reception, changing, safety briefings, a cafe, and offices. The waterside installations feature a main inflatable waterpark with slides and climbing walls, plus a junior waterpark.

Commercialtourismwaterparkrecreation

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Permission for development consisting of the following recreational facilities: part a. Landside installations details of which are outlined below: 1.2 no. Marquees for use as a reception and wet suit distribution, measuring 9m x 9m x 6.6m high and 21m x 15m x 7.8m high; 2.1 no. 9m x 9m x 3.8m high disabled changing marquee; 3.1 no. 9m x 9m x 4.7m high safety briefing marquee; 4.9 no. 12m x 6m x 3.3m high changing marquees; 5.3 no. 12m x 15m x 5m high marquees for use as a customer observation area, a dining area and a gift shop; 6.1 no. 4m x 8m x 3.7m high café marquee; 7.2 no. 3m x 6m x 3m high prefabricated office buildings
  • Outdoor showers 5m x 6m
  • Realignment of existing fencing. All the marquees will be coloured white. The proposed development includes all ancillary and enabling site works. The changing rooms and coffee shop will be connected by gravity to existing public sewerage. Part b. Waterside installations, details of which are outlined below
  • Main waterpark consisting of inflatable platforms, slides and climbing walls with overall dimensions of 35m x 40m x 8m high
  • Inflatable junior waterpark measuring 8m x 15m x 5.2 high
  • No. 1 inflatable water slide measuring 15m x12m x12m high
  • No. 1 inflatable water slide measuring 31m x 22m x 16m high
  • No. 1 inflatable water slide measuring 20m x 8m x 13m high
  • No. 1 inflatable water slide measuring 32m x 16m x 13m high; 7.50 no. Cylindrical shaped inflatable safety booms 4m by . 4m diameter. All of the above installations are inflatable pvc structures which are permanently fixed to the lake bed using ropes and anchors. Proposed operation periods: it is intended that the overall facility will be operational annually between the 15th march and the 15th of october. The facility will operate during daylight hours only and will not operate past 21:00 hours on any day (a natura impact statement (nis) will be submitted to the planning authority with the planning application) at

Key dates

Timeline

  1. Application received9 February 2022
  2. Further information requested5 April 2022
  3. Decision due24 January 2023
  4. Decision issued24 January 2023
  5. Appeal submitted17 February 2023
  6. Appeal decided11 April 2024
  7. Permission expiry10 April 2029

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.