Towlands of Carrowmore, and Carrownyclowan, County Sligo
A ten-turbine wind farm development including two turbines up to 170 metres tall and recreational trails in Sligo and Leitrim.
20251 · Sligo County Council · Lodged 29 July 2020
- Reference
- 20251
- Authority
- Sligo County Council
- Register status
- Appealed
- Type
- PERMISSION
- Received
- 29 July 2020
Summary
AI-generatedA ten-year planning permission is sought for a renewable energy development with a 30-year operational life. The Sligo portion of the development includes two wind turbines with a maximum blade tip height of 170 metres, a 100-metre meteorological mast, underground cabling, and recreational amenity trails.
- Residential units
- 2
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
Pp - for development consisting of a ten-year planning permission for a renewable energy development with a 30-year operational life (from the date of commissioning along with a recreational and amenity facility. The entirety of the renewable energy development constitutes the provision of a ten-turbine wind farm and associated site works on lands in both counties leitrim and sligo. The development will consist of: i. Construction of 2 no. Wind turbines with a maximum overall blade tip height of up to 170 metres and associated hardstand areas; ii. 1 no. Permanent meteorological mast with a maximum height of up to 100 metres, iii. All associated underground electrical and communications cabling connecting the turbines to the proposed wind farm 38kv electricity substation (which is proposed to be located in the townland of garvagh glebe, co leitrim); iv. Upgrade of existing tracks, roads and provision of new site access roads; v. Recreation and amenity works, including marked trails and associated recreation and amenity signage; vi. Site drainage; vii. Permanent signage; viii. Ancillary forestry felling to facilitate construction and operation of the proposed development; and ix. All associated site development works. A concurrent planning application is being lodged with leitrim county council in relation to the elements of the project that are within county leitrim (which include the provision of 8 no. Wind turbines, electrical substation, underground cabling, connection to national electricity grid, access tracks/roads, access junction improvements, amenity works and all associated works). An environmental impact assessment report (eiar) and a natura impact statement (nis) have been prepared in respect of the proposed development and will be submitted with the application.
Key dates
Timeline
- Application received29 July 2020
- Further information requested17 September 2020
- Further information received7 April 2021
- Decision due15 June 2021
- Decision issued15 June 2021
- Appeal submitted20 February 2025
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedEnergy
Development located in the townlands of Bargowla, Boleymaguire, Braudphark, Derreens, Derrybofin,…
Townlands as above ,
20120LeitrimLodged 29 Jul 2020
- GrantedEnergy
A thirty year planning permission for an additional four (4) wind turbines to an existing fifteen (15)…
townlands detailed above ,
1926LeitrimLodged 8 Feb 2019
- GrantedEnergy
Renewable energy development consisting of the provision of a 7 turbine wind farm, solar photovoltaic array,…
Slievereagh and Coomnaclohy, Ballyvourney, Co. Cork,
194972corkLodged 18 Apr 2019
- RefusedEnergy
A ten-year planning permission for a renewable energy development with a 30-year operational life (from the…
Derreendonee, Curraglass, and Cappaboy Beg, Co. Cork,
20350corkLodged 3 Jul 2020
- RefusedEnergy
Permission to develop a wind farm and associated works . The proposed development will consist of —…
Rossacurra Cranemore Kilbrannish North Bealalaw Raheenliegh Aclare Co. Carlow ,
2113CarlowLodged 22 Jan 2021
- GrantedEnergy
A ten year permission for the development of a wind farm project. The development will consist of: - the…
In the townlands of , Keerglen Ballykinlettragh and Ballinglen , County Mayo
2460537MayoLodged 29 Aug 2024
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.