Planning Permission Ireland
GrantedAlterationsDecided 29 April 2022

Finisklin, Sligo

Redevelopment of a secondary school in Sligo, including demolition of old extensions and construction of a new part-three-storey building.

21186 · Sligo County Council · Lodged 11 January 2022

Reference
21186
Authority
Sligo County Council
Register status
Decided
Type
PERMISSION
Received
11 January 2022
Residential units
1
Floor area
1 m²

Summary

AI-generated

The project involves the redevelopment of the existing school site, which lies partly within the curtilage of the Ursuline Convent protected structure. It includes the demolition of approximately 1,897 square metres of existing additions, the construction of a new 4,357 square metre part-two and part-three-storey building, and the refurbishment of a 1930s three-storey building. Conservation works will also be carried out on an 1860s chapel to repurpose it as a music room.

Alterationsschoolconservationdemolition
Storeys
3

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Pp - development consisting of redevelopment at this site of our existing school. Part of the site is in the curtilage of the ursuline convent, a protected structure (fps 43). The proposed development will consist of: - demolition of ca. 1,556m2 of existing additions, extensions and temporary accommodation buildings; - construction of new 4,357 m2 part 3-, and 2-, secondary school building, connected to existing 2006 2-storey extenion and sports hall building which is to be reconfigured, upgraded and its roof replaced; - demolition of ca. 341m2 of additions and extensions adjoining historic buildings to be retained; - refurbishment of and alterations to existing 1,506m2 1930 3-storey building with new lift extension and accessibility interventions; - conservation works to existing 1860's chapel and its repurposing as a music room; - holding works for future use to 1860's building elements adjoining the convent, a protected structure; - holding works for future use to the 1860's building, which is proposed to return to being a stand-alone building after demolitions of additions and extensions thereto; - separate staff car-park with vehicular access from existing northern gate to be modified and associated traffic works; - upgrade to existing student vehicular drop-off, set-down and parking provisions to east; - associated hard-surface play areas, landscaping, boundary treatments; - associated surface water attenuation, foul and surface water drainage connections, site works and ancillary services; - associated phased construction proposals to facilitate continuance of eduation provision during the works

Land-use zoning

What this land is zoned for

CF – community facilitiesCI
Objective: Protect existing facilities or retain existing uses and provide for the establishment of new/additional community and institutional uses, such as schools, community centres, health centres etc.

National zoning type: Community facilities

Objective set by the Sligo County Development Plan 2024-2030 (2024–2030). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
106 Rathedmond Est, Sligo, SligoMay 2025€230,000372 m
7 Rathedmond Est, Sligo, SligoJul 2025€280,000411 m
7 Rathedmond Est, Sligo, SligoMay 2026€352,000411 m
14 Rathedmond Est, Sligo, SligoDec 2025€332,000448 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received11 January 2022
  2. Decision due2 May 2022
  3. Decision issued29 April 2022
  4. Grant issued7 June 2022
  5. Permission expiry6 June 2027

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.