Ballysumaghan, Co. Sligo
A 10-year permission for a synchronous condenser facility in Ballysumaghan.
22351 · Sligo County Council · Lodged 26 October 2022
- Reference
- 22351
- Authority
- Sligo County Council
- Register status
- Decided
- Type
- PERMISSION
- Received
- 26 October 2022
Summary
AI-generatedThe development consists of a 10-year permission for the construction and 30-year operation of a synchronous condenser facility within a 1.196-hectare compound. It includes a generator and flywheel building, electrical rooms, transformers, and associated plant equipment.
- Floor area
- 600 m²
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
Development consisting of: the 10 year permission for the construction and operation of a synchronous condenser facility. The facility will be a fenced compound ca. 1.196ha in size. The development will have a 30 year operational lifetime and will consist of a synchronous condenser, which will include the following elements: generator and flywheel building (ca. 600 sq. M. , ca. 12.5m high) to house the equipment including the generator, flywheel, lube oil skid, vacumn skid, tewac pump skid, reverse switch cubicle and star point cubicle; sfc start-up equipment room (ca. 43.650 sq. M. , ca. 4.20m high); ac/dc room (ca. 81.480 sq. M. , ca. 4.20m high); c&p room (ca. 70.685 sq. M. , ca. 4.20m high); battery room (ca. 28.130 sq. M. , ca. 4.20m high); storage room (ca. 49.200 sq. M. , ca. 4.20m high); supporting components of plant within the compound that include: outdoor cooler (ca. 190.925 sq. M. , ca. 2.660m high); start-up transformer & auxiliary transformer structure (ca. 68.265 sq. M. , ca. 4.50m high; step-up transformer (ca. 170.985 sq. M. , ca. 8.0m high) partially surrounded by a fire wall; and, generator circuit breaker (40.160 sq. M. , ca. 10m high). All other ancillary and miscellaneous site works including: six (6 no. ) lightening masts - height of lightening masts will be determined by lightening protection study prior to commencement of construction; site clearance; site access; separation walls (ca. 8m high) to the south of the transformers; internal hardcore access track; and, development of areas of hard standing including a maintenance layout area. The development will be bound by 2.4m high perimeter fencing. The application is accompanied by a natura impact statement (nis)
Key dates
Timeline
- Application received26 October 2022
- Decision due20 December 2022
- Decision issued19 December 2022
- Grant issued3 February 2023
- Permission expiry2 February 2033
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- Granted100 m away
Development consisting of the installation of battery arrays, located within container units (18 number…
Ballysumaghan , Co Sligo
2011SligoLodged 21 Jan 2020Energy
- Granted170 m away
Development consisting of the erection of a 36m high lattice communication structure carrying antennae,…
Ballysumaghan , Sranagh , Co. Sligo
2185SligoLodged 15 Mar 2021Infrastructure
- Granted180 m away
Development consisting of the erection of a 2.4m high palisade fence with pedestrian only access gate within…
Ballysumanagh , Srananagh , Co. Sligo
16405SligoLodged 19 Oct 2016Infrastructure
- Granted200 m away
The development will consist of an enclosed battery energy storage system compound on c. 2.04 hectares. The…
Townland of Ballysumaghan , Srananagh , Co. Sligo
2560036SligoLodged 5 Feb 2025Energy
- Granted340 m away
Development consisting of (a) A High Inertia Synchronous Compensator (HISC) compound containing 1 No. HISC…
Ballysumaghan , Sooey , County Sligo
22352SligoLodged 27 Oct 2022Energy
- Granted420 m away
The development will consist of amendments to the permitted but not yet constructed Synchronous Compensator…
Ballysumaghan , Sooey , Co. Sligo
2560170SligoLodged 2 May 2025Energy
- Granted470 m away
To (a) retain rear extension to existing dwelling house (b) elevation changes to existing dwelling house (c)…
Ballysumaghan , Ballintogher , Co. Sligo
2460413SligoLodged 15 Nov 2024Retention
- Granted490 m away
Development consisting of upgrading treatment system at existing house by installing new waste water…
Ballysumaghan , Ballintogher , Co Sligo
21375SligoLodged 16 Sept 2021Alterations
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedEnergy
Development consisting of a 10 year permission. The development will consist of the development and operation…
Ballysumaghan , Sooey , Co Sligo
2090SligoLodged 19 Mar 2020
- GrantedEnergy
The development will consist of a synchronous condenser, this will be located within a fenced compound of c.…
ESB Inchicore Depot-specifically lands, south of Kylemore Way, and northwest of the existing, ESB premises, Kylemore Way, Dublin 8, D08 E398
4350/22Dublin CityLodged 29 Jun 2022
- GrantedEnergy
Development which will consist of a 10-year planning permission to construct and complete a synchronous…
Land c. 145m south of Seskin Road , Seskin , Co. Tipperary
2460763TipperaryLodged 12 Sept 2024
- GrantedEnergy
Synchronous condenser/flywheel, located within a fenced compound of c.0.85 ha consisting of: machine building…
Shranakilla Road , Bellacorick , Co. Mayo
23162MayoLodged 24 Mar 2023
- RefusedInfrastructure
For a development consisting of the development and operation of a 150 to 500 MVA (electrical rating)…
Barrettspark ,
22303galwayLodged 7 Mar 2022
- GrantedEnergy
For the development and operation of a 150 to 500 MVA (electrical rating) synchronous condenser. The…
Barrettspark ,
221006galwayLodged 26 Aug 2022
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.