Ballysumaghan, Sooey, Co Sligo
Development of a synchronous condenser facility and associated infrastructure.
2090 · Sligo County Council · Lodged 19 March 2020
- Reference
- 2090
- Authority
- Sligo County Council
- Register status
- Decided
- Type
- PERMISSION
- Received
- 19 March 2020
Summary
AI-generatedA 10-year permission is sought for a 250 to 300 MVA synchronous condenser within a 1-hectare compound. The facility will include a condenser and control building, cooling equipment, modular containers, a step-up transformer, and underground cabling to the neighbouring substation.
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
Development consisting of a 10 year permission. The development will consist of the development and operation of a 250 to 300 mva (electrical rating) synchronous condenser. The development which will be located within a site compound of c. 1 hectare and will consist of the following elements: a condenser and control building to house equipment including the synchronous condenser, flywheel, lube oil skid system, air compressor and pumps. Equipment to be located outside the footprint of the condenser and control building but within the fenced compound will include: cooling equipment (c. 160 sq m. , c. 3m high); 6 no. Modular containers to house electrical and control equipment (total area of c. 195 sqm. , c. 5m high); a step-up transformer, auxillary transformer and electrical plant including an external circuit breaker; 1 no. Firefighting water tank; a below ground oil interceptor and attenuation tank in lieu of the originally proposed above ground oil interceptor and collection pit. Underground cabling ducts and cable to the neighbouring esb substation boundary fencing (c. 500m). Palisade security entrance gate, boundary fencing and cctv; all other ancillary and miscellaneous site works including site clearance; demolition of an existing agricultural shed, site access, internal roads and development of areas of hard standing including a maintenance lay-down area. Following a direction under section 177t(5) of the planning and development act 2000 (as amended), a natura impact statement (nis) will now accompany the planning application.
Key dates
Timeline
- Application received19 March 2020
- Decision due21 January 2021
- Decision issued18 January 2021
- Grant issued2 March 2021
- Permission expiry1 March 2026
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- Granted70 m away
A 10 year planning permission for the construction of a — enclosed battery energy storage system compound on…
Townland of Ballysumaghan Fannybrook , Quarry Lane Co. Sligo , Ireland
2360214SligoLodged 17 Aug 2023Energy
- Awaiting decision90 m away
Development consisting of the development of a battery energy storage system. The development will consist of…
Townland of Ballysumaghan , Fannybrook , Quarry Lane
22369SligoLodged 9 Nov 2022Energy
- Granted240 m away
The development will consist of amendments to the permitted but not yet constructed Synchronous Compensator…
Ballysumaghan , Sooey , Co. Sligo
2560170SligoLodged 2 May 2025Energy
- Granted330 m away
Development consisting of the erection of a 2.4m high palisade fence with pedestrian only access gate within…
Ballysumanagh , Srananagh , Co. Sligo
16405SligoLodged 19 Oct 2016Infrastructure
- Granted330 m away
Development consisting of (a) A High Inertia Synchronous Compensator (HISC) compound containing 1 No. HISC…
Ballysumaghan , Sooey , County Sligo
22352SligoLodged 27 Oct 2022Energy
- Granted340 m away
The development will consist of an enclosed battery energy storage system compound on c. 2.04 hectares. The…
Townland of Ballysumaghan , Srananagh , Co. Sligo
2560036SligoLodged 5 Feb 2025Energy
- Granted340 m away
Development consisting of the erection of a 36m high lattice communication structure carrying antennae,…
Ballysumaghan , Sranagh , Co. Sligo
2185SligoLodged 15 Mar 2021Infrastructure
- Granted410 m away
Development consisting of the installation of battery arrays, located within container units (18 number…
Ballysumaghan , Co Sligo
2011SligoLodged 21 Jan 2020Energy
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedEnergy
Development consisting of: The 10 year permission for the construction and operation of a synchronous…
Ballysumaghan , Co. Sligo
22351SligoLodged 26 Oct 2022
- GrantedEnergy
Development which will consist of a 10-year planning permission to construct and complete a synchronous…
Land c. 145m south of Seskin Road , Seskin , Co. Tipperary
2460763TipperaryLodged 12 Sept 2024
- RefusedInfrastructure
For a development consisting of the development and operation of a 150 to 500 MVA (electrical rating)…
Barrettspark ,
22303galwayLodged 7 Mar 2022
- GrantedEnergy
For the development and operation of a 150 to 500 MVA (electrical rating) synchronous condenser. The…
Barrettspark ,
221006galwayLodged 26 Aug 2022
- GrantedEnergy
Development consisting of (a) A High Inertia Synchronous Compensator (HISC) compound containing 1 No. HISC…
Ballysumaghan , Sooey , County Sligo
22352SligoLodged 27 Oct 2022
- GrantedEnergy
Synchronous condenser/flywheel, located within a fenced compound of c.0.85 ha consisting of: machine building…
Shranakilla Road , Bellacorick , Co. Mayo
23162MayoLodged 24 Mar 2023
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.