Planning Permission Ireland
GrantedEnergyDecided 7 November 2024

Carrane Hill Wind Farm, townlands of Carrownadargny near Geevagh, County Sligo

A 20-year extension to the operational life of the existing Carrane Hill Wind Farm near Geevagh.

2460315 · Sligo County Council · Lodged 19 September 2024

Reference
2460315
Authority
Sligo County Council
Register status
Decided
Type
PERMISSION
Received
19 September 2024

Summary

AI-generated

Permission is sought for a 20-year continuation of the operational life of the existing wind farm from its expiration date in June 2025. No physical modifications are proposed to the existing infrastructure, which includes 4 wind turbines, a substation, and access tracks.

Energywind energyrenewablesinfrastructure

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

A twenty (20) year planning permission for continuations of the operational life of the existing wind farm (scc reg. Ref 98/533 & abp pl ref. 21.110572 as amended by scc reg ref. 04/1315) from the date of expiration (23rd june 2025) of the current permission. No modifications are proposed to the existing wind farm which comprises the follow elements: a. 4 no. Existing wind turbines with a hub height of 44m and a rotor diameter of 52m; b. Existing 1 no. Onsite electrical substation compound which includes a control building, welfare facilities, associated electrical plant and equipment, security fencing, associated underground cabling; c. All associated existing underground electrical and communications cabling connecting the turbines to the on-site substation; d. Existing site access tracks of c. 1.5km in length and 4 no. Turbines hardstandings; e. Existing site drainage and; f. All existing ancillary infrastructure, associated site fencing and signage

Key dates

Timeline

  1. Application received19 September 2024
  2. Decision due13 November 2024
  3. Decision issued7 November 2024
  4. Grant issued2 April 2025
  5. Appeal submitted4 December 2024
  6. Appeal decided26 March 2025
  7. Permission expiry22 June 2045

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.