Planning Permission Ireland
GrantedEnergyDecided 25 April 2023

Dunneill Wind Farm, Located in the townland Crowagh or Dunneill Mountain, Ballyglass (ED Dromore) and Tawnadremira

A 15-year extension to the operational life of the existing 13-turbine Dunneill Wind Farm.

22291 · Sligo County Council · Lodged 26 August 2022

Reference
22291
Authority
Sligo County Council
Register status
Decided
Type
PERMISSION
Received
26 August 2022

Summary

AI-generated

The application seeks a 15-year continuation of the operational life of the existing Dunneill Wind Farm. No physical modifications are proposed to the wind farm, which consists of 13 wind turbines, an electrical substation, a meteorological mast, and associated access tracks.

Energywind farmrenewablesinfrastructure
Residential units
13

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Development consisting of a fifteen (15) year continuation of the operational life of the existing wind farm (scc reg. Ref. Pl03/619 & abp pl. Ref. 21.204790, as amended by scc reg. Ref pl10/371 and pl10/388) from the date of expiration (march 2024) of the current permissions. No modifications are proposed to the existing windfarm which comprises the following elements: (a) 13 no. Existing vestas v52 850 kilowatt (kw) wind turbines with a maximum overall blade tip height of 75 metres (m) (b) existing 1 no. Onsite 20 kilovolt (kv) electrical substation compound which includes a control building, welfare facilities, associated electrical plant and equipment, security fencing, associated underground cabling and a foul waste holding tank (c) existing 1 no. Permanent meteorological mast with a height of 50m and an associated concrete platform/base; (d) all associated existing underground electrical and communications cabling connecting the turbines to the on-site substation; (e) existing site access tracks of circa 3.3 kilometres (km) total length, 3 no. Car parking spaces and 13 no. Turbine hardstands; (f) 2 no. Existing gated site entrances from an unnamed third-class public road which dissects the windfarm site into north and south; (g) existing site drainage; and (h) all existing ancillary infrastructure, associated site fencing and signage. An environmental impact assessment report (eiar) and natura impact statement (nis) have been prepared in respect of the proposed development and accompanies this application.

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Dunbeakin, Templeboy, SligoJan 2026€250,000436 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received26 August 2022
  2. Further information requested20 October 2022
  3. Further information received2 March 2023
  4. Decision due26 April 2023
  5. Decision issued25 April 2023
  6. Grant issued2 June 2023
  7. Permission expiry23 October 2039

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.