Planning Permission Ireland
Awaiting decisionInfrastructureDecision was due 11 September 2025

25 - 34, The open space/ green space/ neighbourhood park opposite houses, Pearse Brothers Park, Pearse Brothers Park Estate, Ballyboden, Dublin 16

Drainage and storm water attenuation works at Pearse Brothers Park.

ED25/0075 · South Dublin County Council · Lodged 15 August 2025

Reference
ED25/0075
Authority
South Dublin County Council
Register status
Decided
Type
Declaration of Exemption Section 5
Received
15 August 2025

Summary

AI-generated

A Section 5 declaration regarding the installation of an underground storm water attenuation tank and related drainage infrastructure, including excavation and pipework, at Pearse Brothers Park.

Infrastructuredrainageinfrastructurepark

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

South dublin county council is carrying out public realm, path, drainage and and landscaping works under a part 8 development. The drainage design includes a large buried attenuation tank and requires a connection to irish water infrastructure outside the red line. Boundary wheater the installation of storm water attenuation infrastructure and related drainage works at pearse brothers park, ballyboden, dublin 16 constitutes development and/or exempted development and such works to include. The installation of an underground attenuation tank and associated surface water drainage infrastructure: excavation, pipework, and surface water outfalls not specified in the approved part 8 drawings: alterations to ground conditions and surface finishes in areas not identified in the part 8 consultation drawings.

Land-use zoning

What this land is zoned for

RESRS
To protect and/or improve residential amenity

National zoning type: Existing residential

Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
24 Pearse Brothers Park, Rathfarnham, Dublin 16Feb 2025€470,00060 m
55 Pearse Bros Park, Ballyboden, Dublin 16Aug 2025€481,00090 m
53 Pearse Brothers Park, Ballyboden, Dublin 16Mar 2025€455,00092 m
9 Pearse Brothers Park, Ballyboden, Rathfarnham Dublin 16Dec 2025€500,000112 m
41 Glenmore Park, Ballyboden, Dublin 16Apr 2026€450,000136 m
2 Pearse Bros Park, Rathfarnham, Dublin 14Feb 2026€580,000162 m
58 Palmer Park, Ballyboden, RathfarnhamJan 2010€250,000235 m
6 Glenmore Court, Ballyboden, Dublin 16Aug 2025€300,000262 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received15 August 2025
  2. Decision due11 September 2025

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.