Fortunestown, Dublin 24.
Development of a precast concrete manufacturing plant with offices, batching plant, and parking.
S01A/0195 · South Dublin County Council · Lodged 4 April 2001
- Reference
- S01A/0195
- Authority
- South Dublin County Council
- Register status
- Decided
- Type
- Permission
- Received
- 4 April 2001
- Floor area
- 4831 m²
Summary
AI-generatedThe project involves constructing a precast concrete manufacturing plant with associated offices spanning approximately 4,831 sq.m. The facility will include a batching plant with a cement silo, aggregate storage bins, 30 parking spaces, and site access from Naas Road and Cookstown Road.
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
The development of a plant for the manufacture of precast concrete products with associated offices (approximate gross floor area of 4831sq. M); batching plant incorporating cement silo and aggregate storage bins; 30 car parking spaces and associated site and landscaping works. The highest point of the development will be 17m above ground level. Access to the site will be provided from existing entrances off the naas road and cookstown road at
Land-use zoning
What this land is zoned for
“To protect and improve rural amenity and to provide for the development of agriculture”
Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.
Read the zoning objectives in the development planKey dates
Timeline
- Application received4 April 2001
- Decision due30 May 2001
- Decision issued31 May 2001
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- Granted60 m away
Installation of an ESB 38kV Overhead Line Switching Compound at Roadstone Belgard Quarry Lands, in the part…
East Of R136 Outer Ring Road, Cheeverstown N7 To N81
SD08A/0731South DublinLodged 21 Oct 2008Infrastructure
- Granted130 m away
(a) new site access onto outer ring road; (b) 850m of new internal roadway; (c) provision of office, canteen…
Belgard Quarry, Cheeverstown Townland, Tallaght, Dublin 24
SD07A/1047South DublinLodged 21 Dec 2007Infrastructure
- Granted130 m away
(a) new site access onto outer ring road; (b) 850m of new internal roadway; (c) provision of office, canteen…
Belgard Quarry, Cheeverstown Townland, Tallaght, Dublin 24
SD07A/1047/EPSouth DublinLodged 7 Feb 2013Infrastructure
- Granted160 m away
The establishment of an asphalt plant and ancillary site facilities at the site stated above. The proposed…
Belgard Quarry, Cheeverstown, Tallaght, Dublin 24.
SD06A/0915South DublinLodged 2 Feb 2007Industrial
- Granted220 m away
To construct one 12m 38kV line termination mast. This work is required to underground a section of the…
Eastern edge of proposed Outer Ring Road Extension (N7-N81) approx. 230m nth of junction with the Embankment Rd, (proposed LUAS extension), in the townland of Cheeverstown, Barony Of Newcastle, Dublin
SD07A/0108South DublinLodged 15 Feb 2007Infrastructure
- Granted230 m away
Recovery of pre-sorted construction and demolition waste (namely concrete, bricks, tiles and ceramics,…
Belgard Quarry, Cheeverstown, Co. Dublin.
SD02A/0167South DublinLodged 21 Mar 2002Industrial
- Granted260 m away
Partial Change of use from warehouse to office use with floor area of 551sq.m; Addition of mezzanine level…
Unit 2B, South West Business Park, Cheeverstown, Citywest, Dublin 24
SD22A/0465South DublinLodged 21 Dec 2022Change of use
- Granted260 m away
Permission for partial change of use from Warehouse to Office use at ground floor level with floor area of…
Unit 2B, South West Business Park, Cheeverstown, Citywest, Dublin 24
SD23A/0170South DublinLodged 20 Jul 2023Change of use
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedIndustrial
Development will consist of a Factory Building (maximum height 10.8m with Gross Floor Area of 3,840 square…
Piercetown , Dunboyne , Co. Meath
RA180038MeathLodged 18 Jan 2018
- GrantedIndustrial
For 2 facilities, to be constructed in 2 phases, consisting of a single storey production/warehouse building…
Phase 1, Citywest Business Campus, Brownsbarn, Naas Road, Co. Dublin.
S00A/0268South DublinLodged 20 Apr 2000
- Awaiting decisionIndustrial
The development will consist of: (i) the construction of 1 no. single-storey high-tech manufacturing facility…
Part of site D , Ashbourne Business Park , Ashbourne Co Meath
2561143MeathLodged 23 Oct 2025
- GrantedIndustrial
The development will consist — Development within an application area of c. 7 hectares
The Murrens , Baltrasna , Oldcastle Co. Meath
22708MeathLodged 30 May 2022
- Awaiting decisionIndustrial
To: a) Retain 3 no. structures associated with the manufacture of precast concrete units, b) Permission is…
Taghart South , Shercock , Co. Cavan
2660122CavanLodged 18 Mar 2026
- GrantedIndustrial
For a 7 year planning permission for development on a site of c. 23.4 hectares bounded generally by the M7/M7…
Lands at Nurney Road (R415) , Greyabbey (townland) Kildare , Co. Kildare
2360077KildareLodged 31 Jul 2023
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.