ESB Belgard 38kV Substation, Belgard Road, Tallaght, Dublin 24

Erection of a 40-metre-high communications structure at the ESB Belgard Substation.

SD08A/0740 · South Dublin County Council · Lodged 14 December 2009

Reference
SD08A/0740
Authority
South Dublin County Council
Register status
Decided
Type
Permission
Received
14 December 2009

Summary

AI-generated

The project involves erecting a 40-metre-high, free-standing birdcage type communications structure carrying antennae and dishes within a palisade compound. It also includes decommissioning an existing 24-metre-high lattice communication structure.

Infrastructuretelecomsinfrastructuresubstation

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Erection of a 40 metre high, free standing birdcage type communications structure, carrying antennae and communication dishes, with associated ground mounted equipment cabinets to be shared with third party operators, within a 2.4 metre high palisade compound. Works to include the decommissioning of the existing 24 metre high lattice communication structure in esb telecoms existing communication compound.

Land-use zoning

What this land is zoned for

REGENRE
To facilitate enterprise and/or residential led regeneration

National zoning type: Mixed Use, general development, opportunity/proposal site

Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
38 Tramway Court, Old Blessington Road, TallaghtApr 2026€246,000297 m
46 Tramway Court, Old Blessington Rd, Tallaght Dublin 24May 2025€110,000297 m
51 Tramway Court, Old Blessington Rd, Tallaght Dublin 24Oct 2025€193,000297 m
44 Tramway Court, Old Blessington Rd, Tallaght Dublin 24Nov 2025€170,000297 m
45 Tramway Court, Old Blessington Rd, Tallaght Dublin 24May 2025€110,000297 m
48 The Crescent, Stonehaven, Blessington Roadprice excludes VATNov 2025€480,176323 m
26 Tuansgate, Belgard Sq East, Tallaght Dublin 24Jul 2025€283,000474 m
49 Tuansgate, Belgard Sq, Tallaght Dublin 24Jul 2025€215,000474 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received14 December 2009
  2. Further information requested16 December 2008
  3. Further information received15 June 2009
  4. Decision due19 January 2010
  5. Decision issued19 January 2010
  6. Grant issued2 March 2010

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.