Planning Permission Ireland
RefusedIndustrialDecided 7 March 2016

Moneenalion Commons Upper, Baldonnel Business Park, Dublin 22

Demolition of a prefab and construction of three large industrial and logistics units in Baldonnel.

SD15A/0309 · South Dublin County Council · Lodged 11 February 2016

Reference
SD15A/0309
Authority
South Dublin County Council
Register status
Appealed
Type
Permission
Received
11 February 2016
Floor area
32771 m²

Summary

AI-generated

Permission is sought for the demolition of a 39.4 sqm prefab building and the construction of three light industrial and logistics units totaling 32,711 sqm. The development includes ancillary offices, 329 car parking spaces, 73 bicycle spaces, two substations, and a new access bridge.

Industrialindustrialdemolitionlogisticswarehouse

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Demolition of existing pre fab building of 39.4sqm . The construction of 3 units for light industrial and logistics/warehouse use ranging in size from 10837sq. M to 10967sq. M (with option to subdivide subject to tentant requirements). The gfa of the development is c 32,711sq. M including 1,569sq. M of ancillary office floor space. The development is served by service yards and 329 car park spaces and 73 bicycle spaces. The maximum parapet height of the units is 12.65 meters. Acces to the site is from barney's lane and clonlara road and will include new access bridge to unit b & c. Development to include attenuation measures including detention basin located to the south east of the site. The development also includes 2 substations with internal switch rooms and plant, all site development works, landscaping and associated boundary treatment and all other ancillary works.

Land-use zoning

What this land is zoned for

EESI
To provide for enterprise and employment related uses

National zoning type: Industrial, enterprise, employment

Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 22 December 2017. A completion certificate was lodged on 24 September 2019.

Notified floor area: 10,837

3 commencement notices are linked to this development.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received11 February 2016
  2. Further information requested8 December 2015
  3. Further information received11 February 2016
  4. Decision due9 March 2016
  5. Decision issued7 March 2016
  6. Appeal submitted1 April 2016
  7. Appeal decided13 April 2017
  8. Permission expiry2 September 2016

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.