GrantedIndustrialDecided 17 September 2018

Moneenalion Commons Upper, Baldonnel Business Park, Dublin 22

Amendments to a permitted logistics scheme, including merging two units into one larger warehouse.

SD18A/0266 · South Dublin County Council · Lodged 24 July 2018

Reference
SD18A/0266
Authority
South Dublin County Council
Register status
Decided
Type
Permission
Received
24 July 2018

Summary

AI-generated

The proposed amendments to a permitted logistics scheme involve the omission of Unit C to allow for an enlarged Unit B, measuring 18,617 square metres. The changes will result in an overall reduction of floor area across the site, alongside revised parking and access arrangements.

Industrialwarehouselogisticsamendments
Floor area
18,617 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Amendments to the permitted logistics/warehousing scheme under sdcc ref: sd15a/0309 (an bord pleanála ref. Pl06s. 246392), as subsequently amended by sdcc ref. Sd17a/0362. The proposed amendments relate primarily to permitted unit b and unit c and consist of: (1) omission of unit c and provision of enlarged unit b (increasing from 10,967sq. M gfa to 18,617sq. M gfa) with a height of c. 17.65m including mezzanine level. The previously permitted units a, b and c resulted in a total of 32,771sq. M. The proposed units a and b result in a total of 29,454sq. M. Which results in an overall reduction of 3.317sq. M. Gfa. (2) the proposed unit b incorporates 690sq. M gfa of ancillary office space (a reduction of 386sq. M compared to the combined permitted ancillary office space within permitted unit b and c). (3) omission of one vehicular entrance and associated bridge between permitted unit b and c and replacement with two vehicular entrances and associated bridges to either side of proposed unit b. (4) relocation substation. (5) reduction in car parking spaces from 329 to 235; 54 bicycle parking spaces are proposed to service unit b. (6) resultant amendments to site layout, yards, elevations, signage, internal road layout, landscaping, ground works, drainage, gates, fencing, services and utilities and all associated and ancillary site development works.

Land-use zoning

What this land is zoned for

EESI
To provide for enterprise and employment related uses

National zoning type: Industrial, enterprise, employment

Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 22 December 2017. A completion certificate was lodged on 24 September 2019.

Notified floor area: 10,837

3 commencement notices are linked to this development.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received24 July 2018
  2. Decision due17 September 2018
  3. Decision issued17 September 2018
  4. Grant issued30 October 2018

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.