Planning Permission Ireland
GrantedInfrastructureDecided 4 April 2017

Coláiste Chilliain, Old Nangor Road, Clondalkin, Dublin 22.

Construction of two new three-storey primary schools and a PE hall in Clondalkin.

SD17A/0035 · South Dublin County Council · Lodged 14 February 2017

Reference
SD17A/0035
Authority
South Dublin County Council
Register status
Decided
Type
Permission
Received
14 February 2017
Floor area
6251 m²

Summary

AI-generated

The development consists of two new three-storey primary school buildings providing 16 classrooms each, a shared general purpose area, and a new single-storey PE hall for Coláiste Chilliain. It also includes new pedestrian and vehicle access routes, a bus set-down zone, play courts, and landscaping.

Infrastructureschooleducationclondalkin
Storeys
3

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Construction of two new 3 storey primary school buildings for gaelscoil na camóige agus gaelscoil chluain dolcáin providing 16 classrooms each, a shared general purpose area, ancillary teaching and staff accommodation. The development will also consist of the construction of a new single storey pe hall building for coláiste chilliain. The development will also include two new pedestrian access routes, with one located on new nangor road and with another located at the junction of new nangor road and old nangor road, a new vehicle entrance and exit onto old nangor road to provide a one-way vehicle route with a bus/vehicle set down zone, conversion of existing vehicle entrance to colaiste chillian to an in-only entrance, 2 new hard play courts and play space at each primary school with site landscaping, bicycle parking spaces and car parking spaces for each primary school including accessible car parking spaces, internal refurbishment works to coláiste chilliain to facilitate the reintegration of teaching accommodation upon gaelscoil chluain dolcáin's move to the new school, removal of the existing temporary changing room and relocation of car park spaces at coláiste chilliain to provide accessible parking spaces and associated works. The development will also comprise of connections to public utility and drainage services, boundary treatments, alterations to existing drainage layout and associated site development works.

Land-use zoning

What this land is zoned for

RESRS
To protect and/or improve residential amenity

National zoning type: Existing residential

Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 9 August 2018. A completion certificate was lodged on 4 September 2018.

Notified floor area: 252

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
60 Cherrywood Ave, Clondalkin, Dublin 22Jan 2025€250,000122 m
63 Cherrywood Ave, Clondalkin, Dublin 22Jul 2025€405,000146 m
27 Mill Park, Old Nangor Rd, Clondalkin Dublin 22Mar 2026€325,000164 m
34 Mill Park, Clondalkin, DublinJun 2026€290,000166 m
5 Cualann House 22 Old Nangor Rd, Clondalkin, Dublin 22Apr 2025€270,000175 m
4 Cuallan House 22 Old Nangor Rd, Clondalkin, Dublin 22Apr 2025€230,000175 m
42 Millpark Clondalkin, Clondalkin Dublin 22, DublinJul 2025€305,000196 m
182 The Gate, Millpark Norgor Rd, Clondalkin Dublin 22Jul 2025€210,000201 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received14 February 2017
  2. Decision due10 April 2017
  3. Decision issued4 April 2017
  4. Grant issued15 May 2017

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.