Planning Permission Ireland
GrantedAlterationsDecided 20 February 2019

Colaiste Chillian, Nangor Road, Clondalkin, Dublin 22

Changes to roof finishes and installation of 340 solar panels at a school campus in Clondalkin.

SD18A/0447 · South Dublin County Council · Lodged 20 December 2018

Reference
SD18A/0447
Authority
South Dublin County Council
Register status
Decided
Type
Permission
Received
20 December 2018

Summary

AI-generated

The application seeks modifications to a previously approved permission for two new three-storey primary schools and a single-storey PE hall. The changes include a material change of roof finishes and the installation of 340 roof-mounted photovoltaic panels covering approximately 560 square metres.

Alterationssolarschooleducation
Storeys
3
Floor area
560 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Modifications to existing grant of permission, reg. Ref. Sd17a/0035, consisting of: material change of roof finish for the construction of two new 3 storey primary school buildings for gaelscoil na camóige agus gaelscoil chluain dolcáin and a material change of roof finish for the construction of the new single storey pe hall building for coláiste chilliain; roof mounted photovoltaic (pv) panels for gaelscoil na camóige agus gaelscoil chluain dolcáin and for the pe hall building; gaelscoil na camóige will accommodate pv panels on the east facing (rear roof); gaelscoil chluain dolcáin will accommodate pv panels on the south facing (rear roof); the pe hall building will accommodate pv panels on the southwest facing (rear roof); the overall number of pv panels is 340 with an approximate area of 560sq. M.

Land-use zoning

What this land is zoned for

RESRS
To protect and/or improve residential amenity

National zoning type: Existing residential

Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
60 Cherrywood Ave, Clondalkin, Dublin 22Jan 2025€250,000122 m
63 Cherrywood Ave, Clondalkin, Dublin 22Jul 2025€405,000146 m
27 Mill Park, Old Nangor Rd, Clondalkin Dublin 22Mar 2026€325,000164 m
34 Mill Park, Clondalkin, DublinJun 2026€290,000166 m
5 Cualann House 22 Old Nangor Rd, Clondalkin, Dublin 22Apr 2025€270,000174 m
4 Cuallan House 22 Old Nangor Rd, Clondalkin, Dublin 22Apr 2025€230,000174 m
42 Millpark Clondalkin, Clondalkin Dublin 22, DublinJul 2025€305,000196 m
182 The Gate, Millpark Norgor Rd, Clondalkin Dublin 22Jul 2025€210,000201 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received20 December 2018
  2. Decision due22 February 2019
  3. Decision issued20 February 2019
  4. Grant issued2 April 2019

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.