Turnpike Business Park, Turnpike Road, Ballymount, Dublin 22
Amalgamation, extension, and change of use of industrial units to offices in Ballymount.
SD19A/0070 · South Dublin County Council · Lodged 13 June 2019
- Reference
- SD19A/0070
- Authority
- South Dublin County Council
- Register status
- In progress
- Type
- Permission and Retention
- Received
- 13 June 2019
- Floor area
- 1520 m²
Summary
AI-generatedThe application seeks permission and retention for the amalgamation and change of use of units 5 to 9 from light industrial to a two-storey office unit of 1,520 sq.m. Works include internal floorplate extensions, partial demolition and reconstruction of first floors, and modifications to the car park layout.
- Storeys
- 2
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
Internal extension of floorplates and amalgamation of units 5, 6, 7, 8 and 9 and their change of use from light industrial to create a two storey office based industry unit of 1,520sq. M within the overall turnpike business park development; retention for the amalgamation of units 5, 6, and 7 that includes the retention of the internal extension of the original mezzanine floor to create a first floor level above the entire ground floor of these units and change of use of these units at ground and first floor level from light industrial to office based industry (910sq. M overall). Permission for the demolition of the first floor (281sq. M) within units 8 and 9 and the construction of a new first floor (305sq. M) above the entire ground floor of these units and the change of use of these units at ground and first floor level from light industrial to office based industry (610sq. M); permission is also sought for changes to the car parking layout that will reduce the car parking spaces from 65 to 64 car parking spaces with vehicular access off turnpike road with a new gated access at the entrance into the car park; sheltered bicycle parking will be provided to serve the development; elevation changes and signage that include a new projecting sign (7.3sq. M) to the north of the east elevation and alteration of individual doors and shutter doors to windows on both the north and south elevation; new windows to both the north, west and south elevation at first floor level; all site and ancillary development works required to facilitate the development.
Land-use zoning
What this land is zoned for
“To provide for enterprise and employment related uses”
National zoning type: Industrial, enterprise, employment
Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.
Read the zoning objectives in the development planBuilt & sold
What happened next
Beyond the decision: whether this development was built, and what property here has sold for.
Built — construction complete
A commencement notice records works starting on 11 December 2019. A completion certificate was lodged on 7 December 2021.
Notified floor area: 1,520 m²
2 commencement notices are linked to this development.
Recent sales nearby
within 500 m| Address | Date | Price | Distance |
|---|---|---|---|
| 8 Ballymount Rd, Clondalkin, Dublin 22 | Oct 2025 | €550,000 | 160 m |
| 484 Ballymount Cottages, Clondalkin, Dublin 22 | Jun 2025 | €1,000,000 | 276 m |
Nearby properties, not this site — a guide to local values.
Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.
Key dates
Timeline
- Application received13 June 2019
- Further information requested26 April 2019
- Further information received13 June 2019
- Decision due10 July 2019
- Decision issued10 July 2019
- Grant issued20 August 2019
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- GrantedAt this site
Erection of a 6000mm high totem style site sign for the Turnpike Business Park; the totem will be 1800mm wide…
Units 5,6,7,8,9, Turnpike Business Park, Turnpike Lane, Ballymount, Dublin 22
SD20A/0302South DublinLodged 23 Nov 2020Commercial
- GrantedAt this site
Erect a 4.525m high stand alone advertisement sign, all ancillary site works
Turnpike Lane, Turnpike Road, Ballymount, Dublin 22
SD12A/0067South DublinLodged 11 Sept 2012Commercial
- GrantedAt this site
Retention permission is sought for: Part (104 sq.m gross) of the first floor currently in light industrial…
Unit 5-9 Unit 4, Turnpike Business Park, Dublin 22, D22 CD74
SD25A/0125WSouth DublinLodged 19 Aug 2025Change of use
- Granted30 m away
Change of use of existing dwelling to playschool and montessori including single storey extension at rear…
18, Ballymount Cottages, Turnpike Road, Walkinstown, Dublin 12
SD02A/0550South DublinLodged 17 Apr 2003Change of use
- Refused30 m away
Change of use from builders storage compound to motor retail sales outlet
17, Ballymount Cottages, Turnpike Lane, Ballymount, Dublin, 12
SD12A/0004South DublinLodged 10 Jan 2012Change of use
- Granted40 m away
Retain sub-divison of the unit into 2 units
Unit D, Turnpike Industrial Estate, Turnpike Road, Clondalkin, Dublin 22.
S99A/0669South DublinLodged 13 Sept 1999Retention
- Granted50 m away
Retention of Nissan-Type shed, concreting to side and rear and widening of entrance to 3.5 metres
Side and rear, 16, Ballymount Cottages, Clondalkin, Dublin 22
SD03A/0761South DublinLodged 18 Mar 2004Retention
- Invalid50 m away
Nissan type shed; concreting to the side and rear and widening of entrance to 3.5 metres
Side & Rear 16 Ballymount Cottages, Clondalkin, Dublin 22
SD02A/0488South DublinLodged 19 Aug 2002Retention
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedChange of use
Retention permission is sought for: Part (104 sq.m gross) of the first floor currently in light industrial…
Unit 5-9 Unit 4, Turnpike Business Park, Dublin 22, D22 CD74
SD25A/0125WSouth DublinLodged 19 Aug 2025
- GrantedChange of use
Part change of use at ground floor level from office use to warehouse / logistics use (with a Gross Floor…
The Former Meridian Building, Whitestown Drive, Tallaght Business Park, Dublin 24, D24 HH50
SD25A/0143WSouth DublinLodged 13 Jun 2025
- GrantedChange of use
Planning permission for the development will comprise the change of use of existing floor area (c.3,373 sq.m)…
Site at Abbvie (Building 2) Clonshaugh Business and Technology Park, Dublin 17
3159/22Dublin CityLodged 27 Jan 2022
- Awaiting decisionRetention
Permission for development that will consist of 1.) Retention of ground and first floor office accommodation…
Matthews Lane South , Donore Road Industrial Estate , Drogheda Co Louth A92 X054
21402LouthLodged 13 Apr 2021
- GrantedIndustrial
Alterations and extensions to existing light industrial unit as follows: (a) Rear 2 storey extension with…
Unit 1, North Esk Business Park, Dunkettle, Glanmire
156916corkLodged 21 Dec 2015
- GrantedCommercial
The retention of (a) an unauthorized 214 sq.m single storey lean- to extension to the rear south elevation of…
South of the Maynooth Road (R148) , Collinstown , Leixlip
19972KildareLodged 28 Aug 2019
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.