Planning Permission Ireland
GrantedChange of useDecided 29 August 2025

Unit 5-9 Unit 4, Turnpike Business Park, Dublin 22, D22 CD74

Amalgamation and change of use of industrial units to a single office-based industry unit with window alterations.

SD25A/0125W · South Dublin County Council · Lodged 19 August 2025

Reference
SD25A/0125W
Authority
South Dublin County Council
Register status
Decided
Received
19 August 2025

Summary

AI-generated

Retention is sought for 104 sq.m of first-floor light industrial space and window enlargements. Permission is also sought to change the use of Unit 4 from light industrial to office-based industry, amalgamating it with Unit 5-9 to create a single large unit. External alterations include replacing doors and shutters with new glazing and windows, alongside bicycle parking provision.

Change of usecommercialofficeindustrial
Floor area
1,798 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Retention permission is sought for: part (104 sq. M gross) of the first floor currently in light industrial use at unit 5-9: enlargement of ground floor window at unit 5-9 on the north elevation enlargement of first floor windows at unit 5-9 on the south elevation. Planning permission is sought for: (i)the change of use of unit 4 (of 292.5 sq. M), including that part at first floor (104 sq. M) for which retention permission is sought, from light industrial use to office based industry use and amalgamation of unit 4 with unit 5-9 (1,505 sq. M gross) to provide a single office based industry unit of 1,797.5 sq. M gross together with all associated and ancillary works, including internal fit-out. (ii) at the south elevation of unit
  • A. At ground floor, existing door, external shutter box, all supports and electrics to be removed and to be replaced with a new glazed door unit, and existing roller shutter door and all supports/electrics to be removed and replaced with new window unit. B. At first floor, 2 no. New aluminium/glass windows. (iii) 4 no. Bicycle parking spaces, including provision for cargo bike

Land-use zoning

What this land is zoned for

EESI
To provide for enterprise and employment related uses

National zoning type: Industrial, enterprise, employment

Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
8 Ballymount Rd, Clondalkin, Dublin 22Oct 2025€550,000172 m
484 Ballymount Cottages, Clondalkin, Dublin 22Jun 2025€1,000,000286 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received19 August 2025
  2. Decision due15 September 2025
  3. Decision issued29 August 2025
  4. Permission expiry7 October 2030

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.