Awaiting decisionIndustrialDecision was due 21 July 2026

Grange Castle Business Park, Nangor Road, Clondalkin, Dublin 22

Extension of duration sought for two data centres and an administration building at Grange Castle.

SD20A/0283/EP · South Dublin County Council · Lodged 27 May 2026

Reference
SD20A/0283/EP
Authority
South Dublin County Council
Register status
In progress
Type
Extension Of Duration Of Permission
Received
27 May 2026

Summary

AI-generated

The development involves the demolition of a vacant house and the construction of a 1-4 storey Central Administration Building alongside two 2-storey data centres. The project includes diesel generators, mechanical flues, and a gas generator compound.

Industrialdata centredemolitionindustrial
Floor area
56,246 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Demolition of existing single storey vacant house, garage and outhouse (total gross floor area (gfa) c. 291.2sq. M) and removal of existing temporary construction car park; construction of a single 1-4 storey central administration building and 2 2-storey (with mezzanine) data centres (dub14 & dub15) all to be located west of data centres dub9, dub10, dub12 & dub13 within the ms campus; the central administration building (c. 6.03m to c. 19.85m high) will comprise central office administration, with staff cafeteria, staff gym and reception (gfa c. 3,520sq. M), with provision of pv panels on the roof; each data centre (c. 15.6m high to parapet height and c. 18.65m to top of roof plant) will include data halls, admin blocks (comprising offices, canteen, loading dock, storage and ancillary areas) and a variety of mechanical and electrical plant areas/structures including modular electrical rooms (mers), battery rooms and transformer areas. Gfa of dub14 is c. 28,072sq. M and gfa of dub15 is c. 28,173sq. M (c. 56,246sq. M in total); dub14 will also include 21 diesel generators and associated sub-stations (e-houses) and 11 mechanical flues (each c. 30.75m high); provision of a gas generator compound (to serve dub15) containing 20 generators, 5 e-houses and 5 flues (c. 25m max height); provision of a gas networks ireland gas skid including 3 kiosk buildings; expansion of existing electrical sub-station compound (originally granted under sd07a/0632) to provide 3 additional transformer bays. 3 e-houses and 1 control room, 2 auxiliary transformers; 2 sprinkler tank and pump house areas, 1 additional rainwater harvesting plant; provision of 168 permanent car parking spaces and 40 cycle parking spaces; provision of additional western access to the ms campus (to serves the central administration building) from the business park estate road (including bridge over the griffeen river) with existing temporary access to be extinguished; physical integration with the remainder of the existing ms campus (including internal access roads and landscaping) with associated modifications to the western boundary of the dub09/dub10/dub12/dub13 data centre development as permitted under sd16a/0088; provision of a new temporary construction car park (with 802 car spaces, shuttle bus stop and shelter) on site north of the main entrance to the business park; total gross floor area of the development will be c. 59,766sq. M; all associated site development works, drainage and services provision, landscaping, boundary treatments (including security fencing) and associated works; an environmental impact assessment report (eiar) has been submitted with this application; the application relates to a development which comprises an activity requiring an integrated pollution prevention and control (ie) licence.

Land-use zoning

What this land is zoned for

EESI
To provide for enterprise and employment related uses

National zoning type: Industrial, enterprise, employment

Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Key dates

Timeline

  1. Application received27 May 2026
  2. Decision due21 July 2026

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.