Microsoft, Grange Castle Business Park, Nangor Road, Clondalkin, Dublin 22.
Demolition of a vacant house and construction of four single-storey data centres with associated infrastructure at Grange Castle.
SD16A/0088 · South Dublin County Council · Lodged 18 March 2016
- Reference
- SD16A/0088
- Authority
- South Dublin County Council
- Register status
- In progress
- Type
- Permission
- Received
- 18 March 2016
- Floor area
- 71231 m²
Summary
AI-generatedThe development involves site enabling works including the demolition of a vacant house and outbuildings. It will feature the construction of four single-storey data centres totaling approximately 70,392 square metres. The project also includes stream diversion, water storage tanks, and 160 additional parking spaces.
- Storey
- 1
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
Site enabling works including demolition of existing vacant house and outbuildings (total floor area c. 241sq. M), diversion of baldonnel stream, provision of below ground attenuation. Development of 4 single storey data centres (dub09, dub10, dub12, dub13) located west of data centres dub06 (existing), dub07 & dub08 (both granted under sd15a/0343), each data centre will contain the following: offices, computer and associated support areas, electrical component rooms, plant and associated equipment, plant at roof level and 5 flues each (each c. 25m high) (gross floor area of each data centre c. 17,598sq. M c. 70,392sq. M in total). The height of each data centre will range between c. 6.1m & c. 13.3m high. Ancillary site works for connection to infrastructural services, as well as fencing, landscaping, perimeter service roads around the buildings. The provision for installation of heat dispersal infrastructure to facilitate the future potential recycling of waste heat energy by 3rd parties. 160 additional operational parking spaces (including universal accessible spaces). Provision of 20 bicycle parking spaces. Provision of 1 adiabatic water storage tank (c. 273sq. M), 1 water treatment storage tank (416sq. M) and 2 pump houses (c. 75sq. M each). Provision of 1,750 temporary construction worker parking spaces on adjoining takeda and sdcc sites. All associated site development, service provision, landscaping ans associated works. This application includes modifications to permission ref. Sd15a/0343 in relation to the lands west of permitted dub07 & dub08 now forming part of the current application. An environmental impact statement (eis) has been submitted with this application.
Land-use zoning
What this land is zoned for
“To provide for enterprise and employment related uses”
National zoning type: Industrial, enterprise, employment
Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.
Read the zoning objectives in the development planBuilt & sold
What happened next
Beyond the decision: whether this development was built, and what property here has sold for.
Built — construction complete
A commencement notice records works starting on 19 August 2016. A completion certificate was lodged on 11 March 2022.
Notified floor area: 6.25 m²
12 commencement notices are linked to this development.
Recent sales nearby
within 500 m| Address | Date | Price | Distance |
|---|---|---|---|
| Apartments 1-33, Block 8 Nangor Hall, Kilcarbery Grange | Dec 2025 | €12,943,276 | 477 m |
Nearby properties, not this site — a guide to local values.
Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.
Key dates
Timeline
- Application received18 March 2016
- Decision due12 May 2016
- Decision issued6 May 2016
- Grant issued13 June 2016
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- Awaiting decision90 m away
Demolition of existing single storey vacant house, garage and outhouse (total gross floor area (GFA)…
Grange Castle Business Park, Nangor Road, Clondalkin, Dublin 22
SD20A/0283/EPSouth DublinLodged 27 May 2026Industrial
- Granted90 m away
Demolition of existing single storey vacant house, garage and outhouse (total gross floor area (GFA)…
Grange Castle Business Park, Nangor Road, Clondalkin, Dublin 22
SD20A/0283South DublinLodged 1 Feb 2021Commercial
- Granted180 m away
Amendments to a previously permitted development (Ref. SD21A/0203 which amended Ref. SD20A/0283); Amendments…
Microsoft, Grange Castle Business Park, Nangor Road, Clondalkin, Dublin 22.
SD24A/0019South DublinLodged 29 Jan 2024Industrial
- Exempt — no permission needed190 m away
The proposed works consist of the erection of 6 No. platforms at the DUB07, DUB 09, DUB13, and DUB14 data…
DUB07 DUB09 DUB13 and DUB14, Data Centres, Grange Castle Business Park
ED26/0001South DublinLodged 13 Jan 2025Commercial
- Granted190 m away
Microsoft Ireland Operations Ltd. intend to apply for permission for development at the Microsoft Campus,…
Microsoft Campus, Grange Castle Business Park, Nangor Road, Clondalkin, Dublin 22, D22 F1W8
SD25A/0017WSouth DublinLodged 31 Jan 2025Energy
- Granted190 m away
The provision of a temporary (for 3 years) 18MW gas powered electricity generator compound to provide…
Grangecastle Business Park, Nangor Road, Clondalkin, Dublin 22
SD17A/0318South DublinLodged 6 Sept 2017Energy
- Granted200 m away
Provision of an establishment to which to European Communities (Major Accident Hazards involving Dangerous…
Grange Castle Business Park, Nangor Road, Clondalkin, Dublin 22
SD23A/0039South DublinLodged 28 Feb 2023Change of use
- Invalid200 m away
Provision of an establishment to which the European Communities (Major Accident Hazards involving Dangerous…
Grange Castle Business Park, Nangor Road, Clondalkin, Dublin 22
SD22A/0446South DublinLodged 28 Nov 2022Industrial
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedIndustrial
Provision of 2 single storey data centres (DUB07 & DUB08) immediately west of existing data centre (DUB06).…
Grange Castle Business Park, Nangor Road, Clondalkin, Dublin 22
SD15A/0343South DublinLodged 17 Nov 2015
- GrantedIndustrial
10 year permission for development consisting of removal of an existing unused waste water treatment facility…
Profile Park, Nangor Road, Clondalkin, Dublin 22
SD21A/0217South DublinLodged 5 Jul 2022
- GrantedEnergy
The proposed development comprises: 1.2 no. 2 storey data centre buildings (each 16,576 sqm), which are 16m…
Woodlands & Former Diamond Innovations Site, Clonshaugh Business & Technology Park, Dublin 17
3803/20Dublin CityLodged 25 Nov 2020
- Awaiting decisionIndustrial
Demolition of existing single storey vacant house, garage and outhouse (total gross floor area (GFA)…
Grange Castle Business Park, Nangor Road, Clondalkin, Dublin 22
SD20A/0283/EPSouth DublinLodged 27 May 2026
- RefusedIndustrial
Development on a Site that includes a two storey residential property on lands to the south of the New Nangor…
Site within the townlands of Ballybane & Kilbride, Clondalkin, Dublin 22
SD22A/0420South DublinLodged 4 Apr 2023
- GrantedIndustrial
Construction of a two storey data storage facility (30,361sq.m.), a double height warehouse building (1,670…
Townlands of Aungierstown & Ballybane, lying to the west of the existing facility in, Newcastle, Clondalkin, Dublin 22.
SD14A/0023South DublinLodged 18 Feb 2014
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.