GrantedCommercialDecided 23 March 2021

3-4, Crag Avenue, Clondalkin Industrial Estate, Clondalkin, Dublin 22

Construction of four new data centre buildings in Clondalkin.

SD20A/0309 · South Dublin County Council · Lodged 24 February 2021

Reference
SD20A/0309
Authority
South Dublin County Council
Register status
Decided
Type
Permission
Received
24 February 2021
Floor area
47714.5 m²

Summary

AI-generated

The development consists of 4 new information and communications technology (ICT) facility buildings with a combined gross floor area of approximately 47,564.5 square meters. The buildings will rise up to three levels with a maximum height of 25 meters.

Commercialdata centreictindustrial
Storeys
3

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Provision of 4 new information and communications technology (ict) facility buildings and associated development at the subject site, superseding elements of the extant planning permissions on site (reg. Ref. : sd18a/0068 and reg, ref. : sd19a/0185). The application site is subject to an epa industrial emissions licence (ref. No,: p1113-01) relating to the energy centre permitted on site, the single storey energy centre, gas pressure reduction station, and 110kv gas insulated switchgear (gis) substation permitted under reg, ref. : sd18ai0068 and reg. Ref. : sd19ai0185 will be constructed as previously approved and are not affected by the current application. The proposed development will comprise the following: the construction of 4 ict facility buildings (ict facilities 1, 2, 3, and
  • With a combined total gross floor area {gfa) of c. 47,564.5 sq. M, each ict facility building includes associated external plant areas, totalling c, 20,649.5 sq,m, ict facilities 1, 2, and 3 will be located in the eastern portion of the site, and each comprise a gfa of c. 15,196 sq. M (including ancillary office and administration space) over part two and part three levels with a maximum height of c, 25 metres and a parapet height of c, 19.5 metres, each of the ict facilities will include an associated external plant area of c, 6,624 sq,m, ict facility 4 will be located in the southern portion of the site and comprises a gfa of c, 1,976.5 sq,m (including ancillary office and administration space) over two levels with a maximum height of c, 15 metres and a parapet height of c. 10.5 metres, this ict facility includes an associated external plant area of c. 777.5sq. M, each ict facility building will accommodate ict equipment halls, associated electrical and mechanical plant rooms, loading bays, maintenance and storage space, office administration areas, and screened plant. Construction of internal road network and circulation areas, footpaths, provision of 153 no. Car parking spaces and 54 no, cycle parking spaces. Connections to vehicular access routes, roads, services and permitted infrastructure relating to the energy centre and 110kv gis substation permitted under reg, ref. : sd18a/0068 and reg, ref. : sd19a/0185. Provision of emergency generators with associated flues, water storage tanks and associated pump rooms (comprising 150 sq,m in total) to serve each of the proposed ict facility buildings. Hard and soft landscaping and planting, lighting, and all associated works, including underground foul and storm water drainage network, boundary treatments and security fencing, attenuation areas, and utility cables

Land-use zoning

What this land is zoned for

EESI
To provide for enterprise and employment related uses

National zoning type: Industrial, enterprise, employment

Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 8 February 2021. A completion certificate was lodged on 24 June 2025.

Notified floor area: 49.9

9 commencement notices are linked to this development.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Apt 18 Block A Aras Na Cluaine, Yellow Meadows Road, Nangar RdMay 2025€257,000246 m
28a Aras Na Cluaine, Clondalkin, Dublin 22Feb 2026€210,000246 m
C125 Aras Na Cluaine, Nangor Rd, Clondalkin Dublin 22Apr 2025€265,000249 m
73 B Aras Na Cluaine, Woodford Walk, Nangor Rd ClondalkinDec 2025€227,000249 m
59b Aras Na Cluaine, Clondalkin, Dublin 22Mar 2026€246,000249 m
167 Aras Na Cluaine, Clondalkin, Dublin 22Mar 2025€250,000284 m
181 Aras Na Cluaine, Clondalkin, Dublin 22May 2025€262,000284 m
Apt 172c, Aras Na Cluaine, Yellow Meadows Rd Dublin 22Jan 2025€217,000284 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received24 February 2021
  2. Further information requested28 January 2021
  3. Further information received24 February 2021
  4. Decision due23 March 2021
  5. Decision issued23 March 2021
  6. Grant issued4 May 2021

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.