In the townlands of Ballybane & Kilbride within Profile Park, Clondalkin, Dublin 22
Demolition of a house and construction of two data centres in Clondalkin.
SD21A/0241 · South Dublin County Council · Lodged 21 March 2022
- Reference
- SD21A/0241
- Authority
- South Dublin County Council
- Register status
- Appealed
- Type
- Permission
- Received
- 21 March 2022
- Floor area
- 40589 m²
Summary
AI-generatedThis application seeks the demolition of an abandoned single-storey dwelling to construct two large two-storey data centres with a combined floor area of 40,589 square metres. The development includes 33 emergency generators with 22.3-metre-high flues and rooftop solar panels.
- Storeys
- 2
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
- Demolition of the abandoned single storey dwelling and associated outbuilding (206sqm); construction of 2 two storey data centers with plant at roof level of each facility and associated ancillary development which will have a gross floor area of 40,589sq. M consisting of 1 two storey data center (building
- Which will be located to the south of the site and will have a gross floor area of 24,667sq. M. Including 22 emergency generators located at ground floor level within a compound to the western side of the data center with associated flues that will be 22.3m in height; 1 two storey data center (building
- Which will be located to the north of the site, and to the immediate north of building 11 and will have a gross floor area of 12,915sq. M including 11 emergency generators located at ground floor level within a compound to the western side of the data center with associated flues that will be 22.3m in height; each of the two data centers will include data storage rooms, associated electrical and mechanical plant rooms, loading bays, maintenance and storage spaces, office administration areas, and plant including pv panels at roof level as well as a separate house generator for each facility which will provide emergency power to the admin and ancillary spaces; each generator will include a diesel tank and there will be a refuelling area to serve the proposed emergency generators; the overall height of each data center apart from the flues and plant at roof level is c. 14.23m above the finished floor level; the overall height of each data center apart from the flues and plant at roof level is c. 14.23m above the finished floor level; single storey step-up substation (38sq. M) as well as 2 single storey switch substations (121sq. M); agi gas regulator compound that include 3 single storey buildings (134sq. M); construction of a gas powered generation plant in the form of a 13m high single storey building with a gross floor area of 2,714sq. M that will contain 10 gas generators with associated flues that will be 25m in height, and grouped in pairs and threes; the gas plant will be located to the west of building 11; ancillary site development works, that will include reorientation of the baldonnel stream, biodiversity management initiatives, attenuation ponds and the installation and connection to the underground foul and storm water drainage network, and installation of utility ducts and cables, that will include the drilling and laying of ducts and cables under the internal road network within profile park; other ancillary site development works will include hard and soft landscaping, lighting, fencing, signage, services road, entrance gates, sprinkler tanks and pump room; a temporary gas powered generation plant within a fenced yard containing 21 generator units in containers, each with associated flues (each 25m high), 12 transformers and 10 containers of controls to be located to the west of, and associated with the first phase of building 11, and will be required for a period of up to 2 years if connection to the national grid is delayed; this temporary plant will not be built if the connection to the national grid is in place prior to the operation of building 11 at this site that includes an abandoned single storey residential property on the new nangor road (r134), dublin 22; and on land within the townlands of ballybane and kilbride within profile park, clondalkin, dublin 22 on an overall site of 8.7 hectares
Land-use zoning
What this land is zoned for
“To provide for enterprise and employment related uses”
National zoning type: Industrial, enterprise, employment
Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.
Read the zoning objectives in the development planBuilt & sold
What happened next
Beyond the decision: whether this development was built, and what property here has sold for.
Built — construction complete
A commencement notice records works starting on 20 April 2023.
Notified floor area: 115.4 m²
7 commencement notices are linked to this development.
Recent sales nearby
within 500 m| Address | Date | Price | Distance |
|---|---|---|---|
| Apartments 1-33, Block 8 Nangor Hall, Kilcarbery Grange | Dec 2025 | €12,943,276 | 244 m |
Nearby properties, not this site — a guide to local values.
Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.
Key dates
Timeline
- Application received21 March 2022
- Further information requested26 October 2021
- Further information received21 March 2022
- Decision due16 May 2022
- Decision issued16 May 2022
- Grant issued19 July 2022
- Appeal submitted13 June 2022
- Appeal decided6 July 2022
- Permission expiry13 October 2022
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- GrantedAt this site
Amendment and modification of SD21A/0241 including the replacement of the permitted 2 sprinkler tanks and…
On lands to the south of the New Nagor Road, Dublin 22
SD23A/0035South DublinLodged 19 May 2023Energy
- GrantedAt this site
(1) Demolition of existing single storey dwelling (c.108.5sq.m); (2) construction of a Distribution Warehouse…
Profile Park, Ballybane, Clondalkin, Dublin 22
SD20A/0124South DublinLodged 14 Oct 2020Industrial
- Granted100 m away
Construct a new access road off the Nangor Road, Clondalkin Dublin 22 as described below:- — Construction of…
Nangor Road, Clondakin, Dublin 22
SD118/0001South DublinLodged 16 May 2011Infrastructure
- Granted100 m away
The application site comprises an area of c. 0.15 hectares. The proposed development comprises an alteration…
Site at Profile Park, south of new Nangor Road (R134), within the townlands of Kilbride & Ballybane, Dublin 22
SD23A/0291South DublinLodged 2 Feb 2024Energy
- Granted120 m away
The proposed development comprises amendments to planning permission Reg. Ref.: SD21A/0241, as previously…
Profile Park (in the townland of Kilbride), Clondalkin, Dublin 22
SD25A/0102WSouth DublinLodged 30 Apr 2025Commercial
- Granted170 m away
Amendments to planning permission Reg. Ref.: SD21A/0241, as previously amended by Reg. Ref.: SD23A/0035,…
Profile Park (in the townland of Kilbride), Clondalkin, Dublin 22
SD26A/0012WSouth DublinLodged 25 Nov 2025Industrial
- Granted170 m away
Amendments to planning permission Reg. Ref.: SD21A/0241 as previously amended by Reg. Ref. SD23A/0035. The…
At Profile Park, To the South of the New Nangor Road (R134), Dublin 22
SD23A/0203South DublinLodged 8 Dec 2023Infrastructure
- Refused180 m away
Development on a Site that includes a two storey residential property on lands to the south of the New Nangor…
Site within the townlands of Ballybane & Kilbride, Clondalkin, Dublin 22
SD22A/0420South DublinLodged 4 Apr 2023Industrial
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- RefusedIndustrial
Development on a Site that includes a two storey residential property on lands to the south of the New Nangor…
Site within the townlands of Ballybane & Kilbride, Clondalkin, Dublin 22
SD22A/0420South DublinLodged 4 Apr 2023
- GrantedIndustrial
Permission for a period of ten years for development at this site of 16.5 hectares that is located within…
Townlands within Grange Castle South Business Park, Baldonnel, Dublin 22
SD20A/0121South DublinLodged 16 Jul 2020
- GrantedIndustrial
Construction of two single storey data centres with associated office and service areas; and three gas…
Site within the townland of Ballymakaily, West of Newcastle Road (R120), Lucan, Co. Dublin
SD21A/0042South DublinLodged 14 Dec 2021
- Awaiting decisionIndustrial
For a Data Centre and will comprise of: The demolition of 3 no. dwelling houses, associated garages and farm…
Townlands of Halverstown Jigginstown and Newhall , Naas , County Kildare.
2460740KildareLodged 1 Aug 2024
- GrantedIndustrial
The development will consist of revisions to parent permission FCC Reg. Ref. FW20A/0087 to include the…
Site of C.3.34ha at the Former Clyde House, IDA Blanchardstown Business and Technology Park, Snugborough Road, Blanchardstown, Dublin 15
FW21A/0073/E1FingalLodged 13 Oct 2025
- GrantedEnergy
The proposed development comprises: 1.2 no. 2 storey data centre buildings (each 16,576 sqm), which are 16m…
Woodlands & Former Diamond Innovations Site, Clonshaugh Business & Technology Park, Dublin 17
3803/20Dublin CityLodged 25 Nov 2020
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.