Townlands within Grange Castle South Business Park, Baldonnel, Dublin 22
Demolition of a house and construction of three large two-storey data centres in Baldonnel.
SD20A/0121 · South Dublin County Council · Lodged 16 July 2020
- Reference
- SD20A/0121
- Authority
- South Dublin County Council
- Register status
- In progress
- Type
- Permission
- Received
- 16 July 2020
- Floor area
- 80269 m²
Summary
AI-generatedThis ten-year planning application seeks the demolition of an existing two-storey dwelling and farm buildings. In their place, three large two-storey data centres with mezzanine floors and 26 emergency generators will be constructed, totaling 80,269 sq.m of floor area.
- Storeys
- 2
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
- Permission for a period of ten years for development at this site of 16.5 hectares that is located within lands in the grange castle south business park and includes the residential property of ballybane, old nangor road on land within the townlands of milltown; ballybane and; aungierstown and ballybane; and bounding baldonnel road to the west; both the old and new nangor road to the north; and grange castle south access road to the south, baldonnel, dublin
- The development will consist of the following: (1) the demolition of the existing two storey dwelling of ballybane and associated farm buildings (565sq. M) and the construction of 3 two storey data centres with mezzanine floors at each level of each facility and associated ancillary development that will have a gross floor area of 80,269sq. M on an overall site of 16.5hectares. (2) 1 two storey data centre (building a) that will be located to the south-west of the site and will have a gross floor area of 28,573sq. M. And will include 26 emergency generators located at ground floor level within a compound to the northern side of the data centre with associated flues that will be 25m in height. The facility will also include 26 ventilation shafts which will be located above the northern end of each emergency generator that will measure 20m in height. (3) 1 two storey data centre (building b) which will be located to the north-west of the site, and to the immediate north of building a and will have a gross floor area of 21,725sq. M and which will include 18 emergency generators located at ground floor level within a compound to the northern side of the data centre with associated flues that will be 25m in height. The facility will also include 18 ventilation shafts which will be located above the southern end of each emergency generator that will measure 20m in height. (4) 1 two storey data centre (building c) which will be constructed last, will be located to the eastern part of the site on a north-south axis and will have a gross floor area of 28,573sq. M. It will include 26 emergency generators located at ground floor level within a compound to the western side of the data centre with associated flues that will be 25m in height. The facility will also include 26 ventilation shafts that will be located above the western end of each emergency generator that will measure 20m in height. (5) each of the three data centres will include data storage rooms, associated electrical and mechanical plant rooms, loading bays, maintenance and storage spaces, office administration areas, and plant including pv panels at roof level as well as a separate house generator for each facility which will provide emergency power to the admin and ancillary spaces. Each data centre will also include a diesel tank and a refuelling area to serve the proposed emergency generators. (6) the overall height of each data centre apart from the flues and plant at roof level is c. 19.85m above the finished floor level. (7) 1 temporary and single storey substation (29sq. M). (8) 3 single storey mv buildings (each 249sq. M
- 747sq. M in total) which manage the supply of electricity from the substations to each data centre and are located to the immediate west of the generator compound within buildings a and b, and to the south of the generator compound withing building c. (9) 8 prefabricated containerised electrical rooms (65sq. M each and 520sq. M overall) that are stacked in pairs to the immediate south of the temporary substation. (10) ancillary site development works, which will include attenuation ponds and the installation and connection to the underground foul and storm water drainage network and installation of utility ducts and cables which will include the drilling and laying of ducts and cables under baldonnel stream. Other ancillary site development works will include hard and soft landscaping, lighting, fencing, signage, service road, entrance gate, sprinkler tank house (72sq. M), security hut (30sq. M) and 150 car parking spaces and 78 sheltered bicycle parking spaces. The development will be enclosed with landscaping to all frontages including a wetland to the west. The development will be accessed from the grange castle south access road from the south via the baldonnel road. An environmental impact assessment report (eiar) has been submitted with this application
Land-use zoning
What this land is zoned for
“To provide for enterprise and employment related uses”
National zoning type: Industrial, enterprise, employment
Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.
Read the zoning objectives in the development planBuilt & sold
What happened next
Beyond the decision: whether this development was built, and what property here has sold for.
Built — construction complete
A commencement notice records works starting on 23 September 2020. A completion certificate was lodged on 28 November 2024.
Notified floor area: 250 m²
12 commencement notices are linked to this development.
Recent sales nearby
within 500 m| Address | Date | Price | Distance |
|---|---|---|---|
| Apartments 1-33, Block 8 Nangor Hall, Kilcarbery Grange | Dec 2025 | €12,943,276 | 383 m |
Nearby properties, not this site — a guide to local values.
Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.
Key dates
Timeline
- Application received16 July 2020
- Further information requested14 July 2020
- Further information received16 July 2020
- Decision due9 September 2020
- Decision issued29 July 2020
- Grant issued3 September 2020
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- Granted140 m away
Construct Baldonnell Road Improvement Scheme & Access Road to Proposed Milltown Business and Technology Park,…
Baldonnell, Co. Dublin.
SD088/0010South DublinLodged 14 Oct 2008Infrastructure
- Granted190 m away
Single storey ESB substation (27sq.m) that will be accessed from the north off the Grange Castle South Access…
Grange Castle Business Park South, Townland of Milltown and bounding the Grange Castle South Access Road to the North, Baldonnel, Dublin 22
SD19A/0300South DublinLodged 24 Sept 2019Infrastructure
- Refused220 m away
Change of use from Residential To Irish Cultural and Language Institute and for a new Bio — Cycle unit
Sliabh Gcua, Ballybane, Dublin 22
S02A/0097South DublinLodged 26 Mar 2002Change of use
- Granted280 m away
Retention of single storey client control room (248.5sq.m) associated with the planned future substation that…
Grange Castle South Business Park, Baldonnel, Dublin 22
SD20A/0244South DublinLodged 24 Sept 2020Retention
- Refused300 m away
Demolition of the existing single storey house of 'Erganagh' and the construction of a two storey data centre…
Grange Castle Business Park, Clondalkin, Dublin 22
SD18A/0134/EPSouth DublinLodged 14 Jul 2023Industrial
- Granted300 m away
Demolition of the existing single storey house of 'Erganagh' and the construction of a two storey data centre…
Grange Castle Business Park, Clondalkin, Dublin 22
SD18A/0134/EP2South DublinLodged 15 Sept 2023Industrial
- Granted300 m away
Demolition of the existing single storey house of 'Erganagh' and the construction of a two storey data centre…
Grange Castle Business Park, Clondalkin, Dublin 22
SD18A/0134South DublinLodged 30 Jul 2018Commercial
- Granted310 m away
Amendments and modifications to the permitted data centre development granted under Reg. Ref. SD18A/0134 —…
Townlands within Grange Castle South Business Park, Baldonnel, Dublin 22
SD20A/0295/EPSouth DublinLodged 2 Apr 2026Retention
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedRetention
Amendments and modifications to the permitted data centre development granted under Reg. Ref. SD18A/0134 —…
Townlands within Grange Castle South Business Park, Baldonnel, Dublin 22
SD20A/0295/EPSouth DublinLodged 2 Apr 2026
- GrantedCommercial
Demolition of the existing single storey house of 'Erganagh' and the construction of a two storey data centre…
Grange Castle Business Park, Clondalkin, Dublin 22
SD18A/0134South DublinLodged 30 Jul 2018
- RefusedIndustrial
Development on a Site that includes a two storey residential property on lands to the south of the New Nangor…
Site within the townlands of Ballybane & Kilbride, Clondalkin, Dublin 22
SD22A/0420South DublinLodged 4 Apr 2023
- GrantedIndustrial
Amendment and completion of the permissions granted under Reg. Ref. SD16A/0214, SD16A/0345, SD17A/0141 and…
Site within the townlands of Ballymakaily & The Grange, Newcastle Road, Lucan, Co. Dublin
SD18A/0298South DublinLodged 22 Aug 2018
- RefusedIndustrial
10 year permission on a site is bounded to the east and south by Grange Castle Golf Club, to the north by…
Plot 100, Profile Park, Nangor Road, Clondalkin, Dublin 22
SD22A/0156South DublinLodged 14 Jun 2023
- GrantedIndustrial
Construction of a 3 storey (part 4 storey) data centre known as 'DB8' to include data halls, electrical/plant…
Plot 100, Profile Park, Nangor Road, Clondalkin, Dublin 22
SD21A/0186South DublinLodged 25 Feb 2022
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.