Plot 100, Profile Park, Nangor Road, Clondalkin, Dublin 22
Modifications to a permitted data centre development in Clondalkin.
SD22A/0156 · South Dublin County Council · Lodged 14 June 2023
- Reference
- SD22A/0156
- Authority
- South Dublin County Council
- Register status
- Appealed
- Type
- Permission
- Received
- 14 June 2023
Summary
AI-generatedA 10-year permission is sought for modifications to a previously approved data centre. Changes include building reconfiguration, office removal, parapet height increases, loading dock extension, and generator yard alterations.
- Floor area
- 60 m²
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
10 year permission on a site is bounded to the east and south by grange castle golf club, to the north by nangor road (r134) and to the west by an estate road known as falcon avenue) for modifications to the permitted data centre granted under sdcc reg. Ref. Sd21a/0186 comprising the following, reconfiguration and alterations to the data centre building to include removal of front of house offices at third floor level, alterations to floor levels at second floor to provide consistency between front of house and data halls, parapet height increase of front of house to c. 16.8m, provision of storage at second floor level in lieu of relocated internal generators to the external generator yard and associated elevational alterations; extension of loading dock at ground floor level by c. 6osqm in area with minor height increase to c. 5.3m; removal of 3 air plenums to the front (north) elevation and provision of screening to generator flues in lieu of omitted plenums; alterations at roof level to include removal of 2m high gantry screening; alterations to the permitted generator plant yard to the north of the data centre to include the removal of fuel tanks, reconfiguration of plant and generators, provision of 2 additional external generators (increase from 5 to 9 external generators), provision of 4 additional external plant rooms, provision of diesel pump tank cabinets and stepover, relocation of generator yard doors and enlarged generator yard to accommodate the proposed modifications; increase in plant areas by c. 77sq. M; reconfiguration of plant within the permitted chiller plant yard to the south of the data centre; removal of 1 sprinkler/water tank and removal of stairs and door to the side of the waste compound; reconfiguration of car parking and motorcycle spaces and removal of 1 accessible space. 64 total number of car parking spaces; the proposal also includes provision of on-site gas power generation compound ( c. 2,604sq. M in area) in the area previously reserved for a future data centre; the compound comprises 7 modular plant rooms (totalling c. 180sq. M in area), 10 gas fired generators and associated flues c. 14.7m high, gas skid, associated modular plant, boundary treatment surrounding the compound c. 6.5m high and 2 vehicular access points including general and emergency access; all associated site development works, services provision, drainage works, access, landscaping and boundary treatment works; no buildings are proposed above the existing esb and sdcc wayleaves to the west and north of the site; the overall gross floor area of the development is reduced by c. 44sq. M to c. 9,795sq. M from previously permitted under sdcc reg. Ref. Sd21a/0186; the application is accompanied by a natura impact statement.
Land-use zoning
What this land is zoned for
“To provide for enterprise and employment related uses”
National zoning type: Industrial, enterprise, employment
Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.
Read the zoning objectives in the development planKey dates
Timeline
- Application received14 June 2023
- Decision due8 August 2023
- Decision issued8 August 2023
- Appeal submitted1 September 2023
- Appeal decided19 February 2025
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- GrantedAt this site
Construction of a 3 storey (part 4 storey) data centre known as 'DB8' to include data halls, electrical/plant…
Plot 100, Profile Park, Nangor Road, Clondalkin, Dublin 22
SD21A/0186South DublinLodged 25 Feb 2022Industrial
- GrantedAt this site
Erection of a 2.4m high perimeter fence along Nangor Road boundary (approximately 250m long) with separate…
Profile Park, Nangor Road, Clondalkin, Dublin 22
SD12A/0150South DublinLodged 2 Oct 2012Commercial
- Granted50 m away
Phase 1 of a services and retail centre and will consist of 3 no. office blocks as follows: (1) Block A…
'Profile Park', Nangor Road, Ballybane, Dublin 22.
SD07A/1059South DublinLodged 21 Dec 2007Commercial
- Withdrawn120 m away
Retention of existing air conditioning condenser units and associated services with a modified layout affixed…
Unit 25 The Courtyard, Kilcarbery Business Park, Clondalkin, Dublin 22.
SD13A/0073South DublinLodged 25 Apr 2013Retention
- Granted120 m away
Retention of existing air conditioning condenser units and associated services with a modified layout affixed…
25, The Courtyard, Kilcarberry Business Park, Clondaklin, Dublin 22
SD13A/0149South DublinLodged 23 Jul 2013Retention
- Granted140 m away
Relocation of existing jet car wash, provision of new automatic car wash, relocation of car parking, remove…
Grange Castle Filling Station, Nangor Road, Clondalkin Dublin 22
SD02A/0480South DublinLodged 14 Aug 2002Commercial
- Awaiting decision150 m away
Demolition of existing dwelling and construction of 1590 m. sq. of new small enterprise units to consist of…
Kilcarbery Business Park, Nangor Road, Dublin 22.
S01A/0441South DublinLodged 11 Jul 2001Commercial
- Granted170 m away
6062 sq.m. of small enterprise units for light industrial and industry office use. The development will be…
Kilcarbery Industrial Park, Nangor Road, Dublin 12.
S99A/0959South DublinLodged 7 Mar 2000Industrial
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedIndustrial
Construction of a 3 storey (part 4 storey) data centre known as 'DB8' to include data halls, electrical/plant…
Plot 100, Profile Park, Nangor Road, Clondalkin, Dublin 22
SD21A/0186South DublinLodged 25 Feb 2022
- GrantedIndustrial
Permission for a period of ten years for development at this site of 16.5 hectares that is located within…
Townlands within Grange Castle South Business Park, Baldonnel, Dublin 22
SD20A/0121South DublinLodged 16 Jul 2020
- GrantedCommercial
Amendment and completion of the permission granted under SD17A/0141 to facilitate a 125sq.m extension to the…
Site within the townlands of Ballymakaily & The Grange, Newcastle Road, Lucan, Co. Dublin
SD17A/0392South DublinLodged 3 Nov 2017
- GrantedIndustrial
Amendment and completion of the permissions granted under Reg. Ref. SD16A/0214, SD16A/0345, SD17A/0141 and…
Site within the townlands of Ballymakaily & The Grange, Newcastle Road, Lucan, Co. Dublin
SD18A/0298South DublinLodged 22 Aug 2018
- GrantedIndustrial
Construction of a two storey data centre with three storey central service spine (7,246sq.m) with plant at…
Grange Castle Business Park, Clondalkin, Dublin 22
SD18A/0323South DublinLodged 12 Sept 2018
- GrantedRetention
Amendments and modifications to the permitted data centre development granted under Reg. Ref. SD18A/0134 —…
Townlands within Grange Castle South Business Park, Baldonnel, Dublin 22
SD20A/0295/EPSouth DublinLodged 2 Apr 2026
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.