Planning Permission Ireland
GrantedChange of useDecided 9 May 2025

First Floor, Tower Road Shopping Centre, Tower Road, Clondalkin, D22 N9P2

Conversion of offices to extend a medical centre and create a new four-bedroom apartment.

SD25A/0060W · South Dublin County Council · Lodged 18 March 2025

Reference
SD25A/0060W
Authority
South Dublin County Council
Register status
Decided
Type
Permission
Received
18 March 2025

Summary

AI-generated

This application proposes material alterations and a change of use of first-floor office space. The works will extend an existing medical centre and create a new four-bedroom self-contained apartment with its own ground-floor entrance.

Change of usemedicalapartmentoffice conversion
Residential unit
1

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Proposed material alterations/change of use of office accommodation to part of existing first floor level to (1) extension of existing medical centre (previously granted permission ref. No. Sd15a/0327), (2) a new four bedroom self-contained apartment with own door access via existing office entrance door at ground floor level. The works will utilise existing connections to foul and surface water drainage but will include the provision of a new water supply to serve the proposed apartment and all site works associated with the proposals at tower road shopping centre, tower road, clondalkin, dublin 22.

Land-use zoning

What this land is zoned for

VCUC
To protect, improve and provide for the future development of Village Centres

National zoning type: City/Town/village Centre, central area

Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
2 Marsville Mews, Kill, Co. Kildareprice excludes VATMay 2026€418,50277 m
Towerville, Tower Rd, Clondalkin Dublin 22Mar 2025€915,757151 m
25 The Mill Pond, Mill Lane, Clondalkin Dublin 22Sept 2025€286,000177 m
3 Mill Pond, Mill Lane, Clondalkin Dublin 22Feb 2025€265,000177 m
St Laurence, Tower Rd, Clondalkin Dublin 22Mar 2025€673,718177 m
14 Laurel Park, Clondalkin, Dublin 22Oct 2025€530,000181 m
16 Millpond, Clondalkin, Dublin 22Mar 2026€280,000182 m
28 The Mill Pond, Mill Lane, ClondalkinJun 2025€275,000186 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received18 March 2025
  2. Decision due12 May 2025
  3. Decision issued9 May 2025
  4. Permission expiry17 June 2030

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.