Awaiting decisionEnergy

Ballynagrana and Deerparklodge, Carrick-on-Suir, Co. Tipperary

Alterations to a previously approved solar farm, including optimized panel layouts and substation changes.

211129 · Tipperary County Council · Lodged 30 July 2021

Reference
211129
Authority
Tipperary County Council
Register status
Invalid or incomplete
Type
PERMISSION
Received
30 July 2021

Summary

AI-generated

The applicant seeks to modify a previously permitted solar farm development. The changes include optimizing the solar PV panel configuration to up to 33,203 square metres of panels and increasing the length of the permitted 20 kV substation.

Energysolaramendmentsubstation

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Alterations to the previously granted solar farm in the townlands of ballynagrana and deerparklodge, carrick-on-suir, co. Tipperary (tipperary county council reg ref. 16600640, and an bord pleanála reg ref. Pl92.248089) as amended by tipperary county council reg ref. 19600120. Permission was originally granted for a solar photovoltaic installation comprising up to 36,500 m2 of solar panels on ground mounted frames, 6 no. Inverters housed in 3 units, 1 no. 20kv substation, security fencing, new entrance onto public road, cctv; underground cable and ducts including cable and ducts along the public road to the entrance of the existing deerpark substation within the townland of deerparklodge, carrick-on-suir, co. Tipperary and all associated ancillary development works and services. Permission was subsequently granted for three battery storage containers, alterations to the approved planning boundary and the operational permission of the solar farm from 25 to 30 years. Permission is now sought for the following; optimized solar pv panel configuration to comprise of up to 33,203 m2 of solar panels on ground mounted frames; increase to the length of the 20 kv substation from 9.98m to 11.975m to allow installation of required electrical equipment; increase in height to the permitted solar panels from 2.72 m to 2.82m and; permission to increase the operational period of the solar farm from 30 years to 35 years. The site is located in the townlands of ballynagrana and deerparklodge, carrick-on-suir, co. Tipperary. A natura impact statement (nis) accompanies this application. Planning permission is sought for a period of 10 years

Key dates

Timeline

  1. Application received30 July 2021

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.