Ballynagrana and Deerparklodge, Carrick-on-Suir, Co. Tipperary
Alterations to a permitted solar farm in Carrick-on-Suir, including panel configuration and substation changes.
211818 · Tipperary County Council · Lodged 15 December 2021
- Reference
- 211818
- Authority
- Tipperary County Council
- Register status
- Decided
- Type
- PERMISSION
- Received
- 15 December 2021
Summary
AI-generatedThe applicant is seeking alterations to a previously approved solar farm. The changes include optimizing the solar panel configuration to comprise up to 33,203 sqm of panels and increasing the length of the 20kV substation.
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
Alterations to the previously granted solar farm in the townlands of ballynagrana and deerparklodge, carrick-on-suir, co. Tipperary (tipperary county council reg ref. 16600640, and an bord pleanála reg ref. Pl92.248089) as amended by tipperary county council reg ref. 19600120. Permission was originally granted for a solar photovoltaic installation comprising up to 36,500 m2 of solar panels on ground mounted frames, 6 no. Inverters housed in 3 units, 1 no. 20kv substation, security fencing, new entrance onto public road, cctv; underground cable and ducts including cable and ducts along the public road to the entrance of the existing deerpark substation within the townland of deerparklodge, carrick-on-suir, co. Tipperary and all associated ancillary development works and services. Permission was subsequently granted for three battery storage containers, alterations to the approved planning boundary and the operational permission of the solar farm from 25 to 30 years. Permission is now sought for the following; optimized solar pv panel configuration to comprise of up to 33,203 m2 of solar panels on ground mounted frames; increase to the length of the 20 kv substation from 9.98m to 11.975m to allow installation of required electrical equipment; increase in height to the permitted solar panels from 2.72 m to 2.82m and; permission to increase the operational period of the solar farm from 30 years to 35 years. The site is located in the townlands of ballynagrana and deerparklodge, carrick-on-suir, co. Tipperary. A natura impact statement (nis) accompanies this application. Planning permission is sought for a period of 10 years
Key dates
Timeline
- Application received15 December 2021
- Decision due17 February 2022
- Decision issued16 February 2022
- Grant issued22 March 2022
- Permission expiry21 March 2032
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- GrantedAt this site
A solar photovoltaic installation comprising up to 36,500 m2 of solar panels on ground mounted frames, 6 no.…
Ballynagrana and Deerparklodge , Carrick-on-Suir , Co. Tipperary
16600640TipperaryLodged 7 Jul 2016Energy
- Awaiting decision30 m away
Alterations to the previously granted solar farm in the townlands of Ballynagrana and Deerparklodge,…
Ballynagrana and Deerparklodge , Carrick-on-Suir , Co. Tipperary
211129TipperaryLodged 30 Jul 2021Energy
- Granted80 m away
The provision of three battery storage containers which are required for the operation of the previously…
Ballynagrane and Deerparklodge , Carrick-on-Suir , Co. Tipperary
19600120TipperaryLodged 15 Feb 2019Energy
- Awaiting decision110 m away
Alterations to the previously granted solar farm in the townlands of Ballynagrana and Deerparklodge,…
Ballynagrana and Deerparklodge , Carrick-on-Suir , Co. Tipperary
211306TipperaryLodged 1 Sept 2021Energy
- Granted360 m away
A single storey garden polytunnel
Ballyrichard , Carrick On Suir , Co Tipperary
2360554TipperaryLodged 26 Jul 2023Retention
- Awaiting decision360 m away
The single storey, garden polytunnel in a total area of 35m2, as is erected on lands of 2.65 ha
Ballyrichard , Carrick on Suir , Co Tipperary
2360524TipperaryLodged 17 Jul 2023Retention
- Awaiting decision430 m away
Build a storey and a half type residence, detached garage, vehicular entrance, septic tank and percolation…
Ballynagrana , Carrick-on-Suir , Co. Tipperary
211374TipperaryLodged 16 Sept 2021New dwelling
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- Awaiting decisionEnergy
Alterations to the previously granted solar farm in the townlands of Ballynagrana and Deerparklodge,…
Ballynagrana and Deerparklodge , Carrick-on-Suir , Co. Tipperary
211129TipperaryLodged 30 Jul 2021
- GrantedEnergy
A solar photovoltaic installation comprising up to 36,500 m2 of solar panels on ground mounted frames, 6 no.…
Ballynagrana and Deerparklodge , Carrick-on-Suir , Co. Tipperary
16600640TipperaryLodged 7 Jul 2016
- GrantedEnergy
Alterations to the previously granted solar farm (Tipperary County Council Reg Ref 17600928) Permission was…
Deerpark , Carrick-on-Suir , Co. Tipperary
211819TipperaryLodged 15 Dec 2021
- Awaiting decisionEnergy
Alterations ot the previously granted solar farm (Tipperary County Council Reg Ref 16600465 as amended by…
Loughlohery , Cahir , Co. Tipperary
211311TipperaryLodged 1 Sept 2021
- GrantedEnergy
Alterations to the previously permitted solar farm as follows: a) Replacement of a permitted single storey…
Ballynilard , Tipperary , Co. Tipperary
2360765TipperaryLodged 25 Sept 2023
- GrantedEnergy
For alterations to the previously granted solar farm in the townlands of Ballyhale and Kiltorcan (Kilkenny…
Kiltorcan and Ballyhale , Co. Kilkenny
21595KilkennyLodged 9 Jul 2021
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.