Planning Permission Ireland
GrantedCommercialDecided 21 November 2023

DROMINEER BAY HOTEL, AND WATERSIDE COTTAGES, DROMINEER

Redevelopment of the former Dromineer Bay Hotel into a mixed-use commercial, tourism, and accommodation complex.

2360651 · Tipperary County Council · Lodged 23 August 2023

Reference
2360651
Authority
Tipperary County Council
Register status
Decided
Type
PERMISSION
Received
23 August 2023

Summary

AI-generated

Permission is sought to demolish the existing hotel structure, reception building, and shed. The redevelopment will feature a two-storey mixed-use building with event spaces, retail, restaurant, and café units, alongside 20 new short-stay tourism accommodation units.

Commercialhoteltourismredevelopmentdemolition
Residential units
20
Storeys
2

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • A redevelopment of the former domineer bay hotel site and, modification and development within the adjacent (‘waterside cottages’) holiday home complex to provide for a mixed-use commercial and tourism enterprises and, provision of new associated short-stay tourism accommodation. The proposed development includes
  • Demolition of existing hotel structure and adjacent reception building and shed and construction of a two-storey mixed use building comprising of; (i) event spaces with ancillary reception/lobby, office, bar, kitchen and associated stores and wc facilities; (ii) 1 no. Tourism related retail/commercial space; (iii) 1 no. Restaurant with associated kitchen, stores, staff changing and wc; (iv) 1 no. Retail unit; (v) 1 no. Café; and (vi) external terrace
  • Provision of new accommodation intended for tourism use associated with the proposed events spaces and the existing holiday home complex (‘waterside cottages’) including construction of: (i) 6 no. 1-bed, 2-storey terrace units, and (ii) 14 no. 1-bed apartments comprising: (a) one 2-storey block consisting of 6 no. 1-bed apartment units, and (b) one 2-storey block consisting of 8 no. 1-bed apartment units
  • Modifications to existing holiday houses and complex (‘waterside cottages’) to enhance accommodation provision in the form of: (i) provision of single-storey extension to rear elevation of existing holiday house nos. 1, 2, 4 and 7; (ii) provision of 2-storey extension to side elevation of existing holiday house nos. 3, 4, 6 and 10; and (iii) modifications to internal access road, parking and amenity area arrangements
  • Construction of new vehicular access from the public road (r495) with provision of additional parking
  • Reconfiguration of existing car parking area associated with the former hotel located on the northern side of the hotel building
  • Enhancement of existing surface water arrangements including provision of surface water attenuation system within the northern carpark and provision of petrol interceptor
  • Landscaping, signage and all associated site development works. A natura impact statement has been submitted

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
5 Lakeside Villas, Dromineer, NenaghJan 2026€325,000104 m
6 Lakeside Villas, Dromineer, NenaghApr 2025€220,000121 m
10 Lakeside Villas, Dromineer, NenaghNov 2025€285,000146 m
The Bungalow, Dromineer, NenaghApr 2026€275,000391 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received23 August 2023
  2. Further information requested9 October 2023
  3. Further information received26 October 2023
  4. Decision due22 November 2023
  5. Decision issued21 November 2023
  6. Grant issued3 January 2024
  7. Permission expiry2 January 2029

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.