GrantedAlterationsDecided 8 July 2025

Dromineer Bay Hotel and Waterside Cottages, Dromineer, Nenagh

Minor modifications to a hotel and cottage development, including layout changes to provide additional bedrooms.

2560179 · Tipperary County Council · Lodged 7 March 2025

Reference
2560179
Authority
Tipperary County Council
Register status
Decided
Type
PERMISSION
Received
7 March 2025

Summary

AI-generated

The application seeks minor modifications to a previously granted permission. Changes include additional below-ground plant space, minor elevation adjustments, and internal layout modifications to terrace and apartment units to allow for up to 7 additional bedrooms.

Alterationshotelapartmentsmodifications

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Minor modifications to the granted planning permission (ref. No. 2360651). The modifications will consist of the following: a) mixed-use building: additional, below-ground back-of-house and plant space at the lower ground floor level. Additional plant space within the roof areas, including screening. Minor internal space modifications and adjustments at upper ground floor level, resulting in ca 43sqm of additional area. Minor modifications to elevations, reflecting layout changes; b) terrace units: internal layout modifications allowing for subdivisions and interconnection of bedrooms, resulting in the potential to provide 3 additional bedrooms, with an area increase of approximately 10sqm. Minor modifications to elevations, reflecting layout changes; c) apartment units: internal layout amendments to a block of type 1 apartment units, allowing for subdivisions and interconnection of bedrooms, resulting in the potential to provide 4 additional bedrooms, with minor modifications to elevation windows, reflecting layout changes. Internal layout amendments to a block of type 2 apartment units, allowing for subdivisions and interconnection of bedrooms, resulting in the potential to provide 3 additional bedrooms, with minor modifications to elevation windows, reflecting layout changes; d) existing waterside cottages: 6no additional single-story extensions to houses no. 5, 6, 8, 9, 10 and 11, accommodating en-suite bathrooms; e) all associated site development works

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
5 Lakeside Villas, Dromineer, NenaghJan 2026€325,000104 m
6 Lakeside Villas, Dromineer, NenaghApr 2025€220,000121 m
10 Lakeside Villas, Dromineer, NenaghNov 2025€285,000146 m
The Bungalow, Dromineer, NenaghApr 2026€275,000391 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received7 March 2025
  2. Further information requested23 April 2025
  3. Further information received19 May 2025
  4. Decision due13 July 2025
  5. Decision issued8 July 2025
  6. Grant issued11 August 2025
  7. Permission expiry10 August 2030

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.