In the townlands of Croghan Clohaskin Caherhoereigh Ballykinash Tinnakilly Arragh More Ballyloughnane Faddan Beg Coolderry, Tinlough Sharragh Doughkill Ballaghgar Faddan More, Cloncorig Killeen and Cornhill Co. Tipperary
Construction of a wind farm with 7 turbines, a substation, and grid connection cabling.
2360763 · Tipperary County Council · Lodged 22 September 2023
- Reference
- 2360763
- Authority
- Tipperary County Council
- Register status
- Decided
- Type
- PERMISSION
- Received
- 22 September 2023
Summary
AI-generatedThe development consists of 7 wind turbines with tip heights up to 185m and a permanent 38kV electrical substation. It also includes underground cabling to connect the wind farm to the national grid at the Dallow substation.
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
- (1) the construction of 7 no. Wind turbines and associated hardstand areas with the following parameters a) total tip height range of 179.5m
- 185m, b) rotor diameter range of 149m
- 163m, c) hub height range of 103.5m to 110.5m; (2) 1 no. Permanent 38kv electrical substation which will be constructed in the townland of faddan beg consisting of a single storey control building with welfare facilities, all associated electrical plant and equipment, battery energy storage system, security fencing, all associated underground cabling, wastewater holding tank and all ancillary works and equipment; (3) all works (within county tipperary) associated with the connection of the proposed wind farm to the national electricity grid, via the provision of underground electrical cabling (38kv) to the existing dallow 110kv substation in the townland of clondallow, co. Offaly; (4) provision of 10 no. Joint bays, communication chambers and earth sheath links along the underground electrical cabling route; (5) reinstatement of the road or track surface above the proposed cabling trench along existing roads and tracks; (6) all associated underground electrical and communications cabling connecting the turbines to the proposed wind farm substation; (7) 1 no. Meteorological mast with a height of 107m above ground and associated foundation and hard-standing area; (8) upgrade of existing tracks and roads and the provision of new site access roads; (9) all works associated with the provision of a new permanent site entrance off the l5040 local road; (10) provision of 5 no. New access and egress points along the l5041 local road in the townlands of cloncorig, faddan more and coolderry; (11) provision of 4 no. Peat repository areas and 3 no. Spoil repository areas; (12) 2 no. Temporary construction compounds with temporary site offices and staff facilities; (13) accommodation works along the public road network along the n52 national secondary road in the townland of ballyloughnane to facilitate the delivery of turbine components and other abnormal sized loads; (14) site drainage; (15) tree felling; (16) operational stage site signage; and, (17) all associated site development works, ancillary works and apparatus. - works within the curtilage of protected structures rps ref. Trps336 (ballyloughnane bridge) and rps ref. Trps519 (croghan bridge)
Key dates
Timeline
- Application received22 September 2023
- Decision due16 November 2023
- Decision issued16 November 2023
- Appeal submitted13 December 2023
- Appeal decided30 June 2025
- Permission expiry29 June 2030
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- Awaiting decisionEnergy
Permission for development consisting of — The construction and operation of a wind farm consisting of six…
Pollymount Bellanamullia Scramoge , Treanaceeve and Ballyhubert , County Roscommon.
2560446RoscommonLodged 15 Sept 2025
- RefusedEnergy
For development of a wind farm in the townlands of Fahy Beg, Fahy More North, Ballymoloney, Ballyknavin (Ed…
Fahy Beg Fahy More North Ballymoloney Ballyknavin (Ed O'Briensbridge) Ballyquin More , Woodpark Leitrim Fahy More South Ballybrack Aharinaghmore Tooreen , (Ed Cloghera) Aharinaghbeg Knockdonagh Roo East Blackwater Rosmadda West Parkroe Lackyle (Ed
23148ClareLodged 9 Mar 2023
- Awaiting decisionEnergy
Permission for a ten year development for: (i) The construction of 5 no. wind turbines with the following…
Kellystown Wind Farm Ballymakenny Brownstown Carntown Carstown Cartanstown Castletown Drumshallon Gallstown Groom Kearneystown Keeverstown Killineer Mell New Town , Monasterboice Piperstown Stonehouse Swinestown Tullyallen Tullyard and Tullyeskar Co
2460709LouthLodged 18 Nov 2024
- GrantedEnergy
Permission for proposed development to consist of: (i) The construction of 5 no. wind turbines with the…
Kellystown Wind Farm Ballymakenny Brownstown Carntown Carstown Cartanstown Castletown Drumshallon Gallstown Groom Kearneystown Keeverstown Killineer Mell Newtown Monasterboice Piperstown Stonehouse Swinestown Tullyallen Tullyard , and Tullyeskar , C
2460766LouthLodged 4 Dec 2024
- GrantedEnergy
The Applicant is seeking permission for the construction, operation and decommissioning of a wind energy…
Polnareagha, Ardskeagh, Tullacondra, Croughta Kilmaclenine, Ballyclogh, Knockaunavaddreen, Copestown, Ballybeg, Baltydaniel East Twopothouse, Caurraghakerry, Co. Cork
24/5503corkLodged 9 Aug 2024
- Awaiting decisionEnergy
Permission for the construction, operation and decommissioning of a wind energy development including — 9…
Polnareagha, Ardskeagh, Tullacondra, Croughta, Kilmaclenine, Ballyclogh, Knockaunavaddreen,, Copestown, Ballybeg, Baltydaniel East, Twopothouse, Caurraghakerry, Co. Cork
245215corkLodged 28 Jun 2024
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.