Pollymount Bellanamullia Scramoge, Treanaceeve and Ballyhubert, County Roscommon.
Construction of a six-turbine wind farm and associated substation in County Roscommon.
2560446 · Roscommon County Council · Lodged 15 September 2025
- Reference
- 2560446
- Authority
- Roscommon County Council
- Register status
- In progress
- Type
- PERMISSION
- Received
- 15 September 2025
Summary
AI-generatedThe project consists of six wind turbines with a maximum tip height of up to 160m. It also includes turbine foundations, hardstands, 4.4km of access tracks, and a permanent 38kV electrical substation.
- Storey
- 1
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
- Permission for development consisting of
- The construction and operation of a wind farm consisting of six wind turbines
- The turbine specification is unconfirmed but will fall within the parameter range outlined by roscommon county council and will be one of the following three options; - technology option
- Tip height of 160m, rotor diameter of 136m and hub height of 92m; or - technology option
- Tip height of 156m, rotor diameter of 133m and hub height of 90m; or - technology option
- Tip height of 159m, rotor diameter of 138m and hub height of 90m
- Construction of turbine hardstands (including crane and assembly areas) and turbine foundations
- Construction of approximately 3.9km of new permanent internal site access tracks and the upgrade of 0.5km of existing internal site access tracks
- Construction of a permanent onsite 38kv electrical substation, including one single storey substation building with welfare facilities, lidar, diesel generator and fuel storage tank, all associated electrical plant and equipment, all associated underground cabling, rainwater harvesting and storage tank, wastewater holding tank, security fencing, gates, signage, and all ancillary structures and works
- Installation of underground electrical and communications cabling connecting the wind turbines to the proposed onsite 38kv electrical substation
- Construction of two temporary site compounds with associated site offices, welfare facilities, car parking, site fencing and lighting
- Erection of a permanent 30m high communications relay tower
- Construction access via six site entrances (se1 – se6) to include: - se1 on the r371, se2 and se3 on the l6018, and se4, se5 and se6 on the l60498; - se1 and se6 are temporary and will be reinstated following construction. Se1 may be re-established if required for turbine component repair or replacement. Se2 – se5 will be retained permanently for operational access
- Tree felling to facilitate the construction and operation of the proposed development
- Installation of approximately 5.1km of permanent underground electrical cabling for the grid connection including cabling within the public road corridor, extending from the proposed onsite 38kv electrical substation at ballyfeeny to end at the junction of the r371 and the sliabh bawn substation road in the townland of tooreen
- All associated site works, including site clearance, landscaping, site drainage, s
Key dates
Timeline
- Application received15 September 2025
- Further information requested23 December 2025
- Further information received5 June 2026
- Decision due20 August 2026
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- RefusedEnergy
(1) The construction of 7 no. wind turbines and associated hardstand areas with the following parameters a)…
In the townlands of Croghan Clohaskin Caherhoereigh Ballykinash Tinnakilly Arragh More Ballyloughnane Faddan Beg Coolderry , Tinlough Sharragh Doughkill Ballaghgar Faddan More , Cloncorig Killeen and Cornhill Co. Tipperary
2360763TipperaryLodged 22 Sept 2023
- Awaiting decisionEnergy
Permission for a 10 year planning permission for the proposed development of a wind farm on a site area of…
Carrowkeel Longfield , Kilmass Grange & Rahara , Co. Roscommon
2660172RoscommonLodged 17 Apr 2026
- Awaiting decisionEnergy
Permission for a ten year development for: (i) The construction of 5 no. wind turbines with the following…
Kellystown Wind Farm Ballymakenny Brownstown Carntown Carstown Cartanstown Castletown Drumshallon Gallstown Groom Kearneystown Keeverstown Killineer Mell New Town , Monasterboice Piperstown Stonehouse Swinestown Tullyallen Tullyard and Tullyeskar Co
2460709LouthLodged 18 Nov 2024
- GrantedEnergy
Permission for proposed development to consist of: (i) The construction of 5 no. wind turbines with the…
Kellystown Wind Farm Ballymakenny Brownstown Carntown Carstown Cartanstown Castletown Drumshallon Gallstown Groom Kearneystown Keeverstown Killineer Mell Newtown Monasterboice Piperstown Stonehouse Swinestown Tullyallen Tullyard , and Tullyeskar , C
2460766LouthLodged 4 Dec 2024
- RefusedEnergy
For development of a wind farm in the townlands of Fahy Beg, Fahy More North, Ballymoloney, Ballyknavin (Ed…
Fahy Beg Fahy More North Ballymoloney Ballyknavin (Ed O'Briensbridge) Ballyquin More , Woodpark Leitrim Fahy More South Ballybrack Aharinaghmore Tooreen , (Ed Cloghera) Aharinaghbeg Knockdonagh Roo East Blackwater Rosmadda West Parkroe Lackyle (Ed
23148ClareLodged 9 Mar 2023
- GrantedEnergy
A ten year permission for the development of a wind farm project. The development will consist of: - the…
In the townlands of , Keerglen Ballykinlettragh and Ballinglen , County Mayo
2460537MayoLodged 29 Aug 2024
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.