Awaiting decisionEnergy

Kellystown Wind Farm Ballymakenny Brownstown Carntown Carstown Cartanstown Castletown Drumshallon Gallstown Groom Kearneystown Keeverstown Killineer Mell New Town, Monasterboice Piperstown Stonehouse Swinestown Tullyallen Tullyard and Tullyeskar Co

Construction of a wind farm with five turbines, an electrical substation, and a battery storage system.

2460709 · Louth County Council · Lodged 18 November 2024

Reference
2460709
Authority
Louth County Council
Register status
Invalid or incomplete
Type
PERMISSION
Received
18 November 2024

Summary

AI-generated

Permission is sought for a ten-year development of a wind farm featuring five wind turbines with a tip height of up to 180m. The project also includes an electrical substation compound, a battery energy storage system, and grid connection works.

Energywind farmrenewablebattery storageinfrastructure

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Permission for a ten year development for: (i) the construction of 5 no. Wind turbines with the following parameters: a) total tip height range of 179.5m
  • 180m, b) rotor diameter range of 149m
  • 163m, c) hub height range of 98m to 105m, (ii) construction of turbine foundations, crane hardstand areas and assembly areas; (iii) all associated wind farm underground electrical and communications cabling connecting the turbines and meteorological mast to the proposed onsite electrical substation including cabling. In the public road corridor in the townlands of gallstown and kearneystown; (iv) construction of 1 no. Permanent 38kv electrical substation compound including a single-storey control building with welfare facilities, all associated electrical plant and equipment, security fencing, gates, all ssociated underground cabling, wastewater holding tank, and all ancillary structures and works in the townland of piperstown. (v) a battery energy storage system within the 38kv electrical substation compound; (vi) all works associated with the connection of the proposed wind farm to the national electricity grid which includes 5 no. Of water crossings (3 no. Bridges and 2 no. Culverts). The provision of joint bays and associated communication chambers along the underground electrical cabling route via underground 38kv electrical cabling predominantly within the public road corridor, from the onsite substation in the townland of piperstown to the existing drybridge 110 kv substation located in the townland of tullyallen; (vii) reinstatement of all road and track surfaces above cabling trench along existing roads and tracks in public lands; (viii) provision of new site access tracks and upgrade of existing site tracks/roads to facilitate access to all onsite infrastructure this includes 3 no. Water crossings, passing bays and all associated drainage; (ix) the provision of 2 no. New permanent site entrances for construction and operational access from the local road l6274 in the townlands of kearneystown and gallstown; (x) the permanent realignment of 1 no. Existing entrance for construction and operational access to the 38kv electrical substation compound from the local road l2275 in the townland of piperstown; (xi) use of 1 no. Existing site entrance for construction, operational access to the permanent met mast on a private road off local road l2275 in the townland of drumshallon. (xii) the construction of 1 no. New temporary track in the townland of castleto

Key dates

Timeline

  1. Application received18 November 2024

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.